Sec. 109-22. - Site runoff requirements.
(a) Stormwater facilities shall be required and designed so that runoff exits the site at the point where it exited prior to development (unless a change is required and approved in writing by the administrator) and in a manner so as not to increase flood damage downstream. Concentrated discharges from new developments must enter conveyance systems capable of carrying the design flow rate without increasing flood damage, erosion or maintenance costs downstream. (b) Minor stormwater systems shall be sized to convey runoff from the tributary watershed under fully developed conditions consistent with the City of Rockford Stormwater Technical Manual. (c) Major stormwater systems shall be sized to carry the base flood without causing additional flood damage. (d) Stormwater systems shall properly incorporate and be compatible with existing subsurface and surface drainage systems including agricultural systems. Designs shall not cause damage to existing drainage systems or to existing adjacent or tributary agricultural land uses. The following principles and requirements shall be observed in the design: (1) Offsite outfall: Agricultural subsurface and surface drainage systems shall be evaluated with regard to their capacity and capability to properly convey low flow groundwater and site runoff storage facility release without damage to downstream structures and land uses. If the outfall drain tile and surface drainage systems prove to be inadequate it will be necessary to modify the existing systems or construct new systems which will not conflict with the existing systems and will not impact existing land uses. (2) Onsite: Agricultural drainage systems shall be evaluated in accordance with article V. All existing onsite agricultural drain tile not serving a beneficial use shall be abandoned by trench removal prior to other development and recorded on record drawings. If any existing drain tiles continue to upland watersheds the developer must maintain drainage service during construction until new storm sewers can be installed for a permanent connection. (3) Offsite tributary: Existing drainage systems shall be evaluated with regard to existing capabilities and reasonable future expansion capacities. All existing tributary drain tiles shall be incorporated into the new stormwater system including observation structures located at the limits of the site and shall provide a free flow discharge. Agricultural tributary surface conveyance shall be accepted by the new development with consideration given to water quality and sediment filtering control. (4) New roadway construction shall preserve existing subsurface systems within the right-of-way. (e) Design runoff rates shall be calculated using event hydrograph methods. Acceptable event hydrograph methods are HEC-HMS, HEC-1 (SCS runoff method), TR-20 or TR-55 tabular method. Event methods must incorporate the assumptions contained in section 109-23(b). Design runoff rates for minor conveyance systems may be calculated using the Rational Method if the design watershed is less than 20 acres. A different hydrograph method may be used if reviewed and approved by the administrator. (f) Any design runoff rate calculation method shall use Bulletin 70 northwest sectional rainfall statistics and shall calculate flow from all tributary areas upstream of the point of design. Peak discharges for conveyance design purposes shall be based on the critical duration considering the appropriate rainfall distribution. (g) Major and minor stormwater systems shall be located within easements or rights-of-way explicitly providing for public access or maintenance of such facilities. New facilities constructed offsite pursuant to subsection 109-22(d) need not comply with this requirement. (h) Maximum flow depths for new transverse stream crossings shall not exceed one foot at the crown of the road during the base flood condition. The maximum flow depth on a roadway shall not exceed six inches at the crown for flow parallel to the roadway. For flow over a roadway or parallel to a roadway the product of the flow depth (in feet) and velocity (in feet per second) shall not exceed four for the base flood condition. (i) Transfers of waters between watersheds (diversions) shall be prohibited except when such transfers will not violate the provisions of subsection 109-21(a) and are otherwise lawful. (j) Developments shall incorporate all best management practices required under the Clean Water Act (33 U.S.C. § 1251, et seq., as amended).
(Ord. No. 2015-093-O, 5-4-2015)
Ask a question about Rockford law
Corpus searches the Rockford sections it holds and shows the ones that match, with their citations. Free, no sign-in.