Sec. 109-23. - Site runoff storage requirements (detention).
(a) The area of hydrological disturbance on the site shall be used to calculate the required site runoff storage volume. The tributary area of the site at the point of discharge shall be used to calculate the allowable release rate of the primary restrictor for the site runoff storage facility. (b) Absent any applicable watershed plan or interim watershed plan, sufficient storage shall be provided such that the probability of the post-development release rate exceeding 0.2 cfs/acre of development shall be less than one percent per year. Design runoff volumes shall be calculated using event hydrograph methods. (c) Event hydrograph routing methods such as HEC-1, HEC-HMS, TR-20 or TR-55 tabular method using SCS curve number methodology shall be used to calculate design runoff volumes. Other hydrograph methods may be used if reviewed and approved by the administrator. Event methods shall incorporate the following assumptions: (1) Antecedent moisture condition equals two; (2) Appropriate Huff rainfall distribution except that SCS Type II distribution is acceptable with TR-55 tabular method only; and (3) Twenty-four-hour duration storm with a one percent probability (100-year) of occurrence in any one year as specified by Bulletin 70/71 northwest sectional rainfall statistics. (d) For sites where the undeveloped release rate is less than the maximum release rate in subsection 109-23(b), the developed release rate and corresponding site runoff storage volume shall be based on the existing undeveloped release rate for the development site. (e) Hydraulic computations for the release structure must assume appropriate backwater conditions considering the likelihood of concurrent flood events on the site and receiving stream. (f) Reserved. (g) Storage facilities shall be designed and constructed with the following characteristics: (1) Water surface depths two feet above the base flood elevation will not damage the storage facility. (2) The storage facilities shall be accessible and easily maintained. (3) All design site runoff storage volume shall be provided above the seasonal high groundwater table or the invert elevation of the groundwater control system. (4) Storage facilities shall facilitate sedimentation and catchment of floating material. Unless specifically approved by the administrator, concrete lined low flow ditches shall not be used in site runoff storage basins. (5) Storage facilities shall minimize impacts of stormwater runoff on water quality by incorporating best management practices. (6) Storage facilities shall maximize the distance between site runoff storage inlets and outlets to the extent possible. (7) Storage facilities shall be designed such that the existing conditions pre-development peak run-off rate of the 100-year, critical duration rainfall will not be exceeded assuming the primary restrictor is blocked. (8) Storage facilities with single pipe outlets shall have a minimum inside diameter of 12 inches. If design release rates necessitate a smaller outlet, structures such as perforated risers or removable flow control orifices not less than four inches shall be used. (9) A mechanically opened outlet to draw down the permanent pool or retention area for maintenance purposes to the lowest available invert at the site boundary shall be provided. (10) Storage facilities shall be designed for gravity flow discharge. A pump system will not be permitted. (11) For sites that do not meet the minimum four inch orifice requirement, stormwater best management practices shall be incorporated into the parking lot and site design. (h) Storage facilities located within the regulatory floodplain shall (a) comply with article IV; and (b) store the required amount of site runoff to meet the release rate requirement under all streamflow and backwater conditions up to the ten-year flood elevation on the adjacent receiving watercourse. The administrator may approve designs which can be shown by detailed hydrologic and hydraulic analysis to provide a net watershed benefit not otherwise realized by strict application of the requirements set forth in (a) and (b) of this subsection. (j) Storage facilities located within the regulatory floodway shall (a) meet the requirements for locating storage facilities in the regulatory floodplain; (b) be evaluated by performing hydrologic and hydraulic analysis consistent with the standards and requirements for watershed plans; and (c) provide a net watershed benefit. (k) Site runoff storage facilities may be located offsite if (a) the offsite storage facility meets all of the requirements of this article; (b) adequate storage capacity in the offsite facility is dedicated to the development; and (c) the development includes means to convey stormwater to the offsite storage facility. (l) Site runoff storage volume provided by enlarging existing regulatory floodplain storage (onstream site runoff storage) will be allowed only as a variance. The applicant must demonstrate that flood damage will not be increased and the development will not increase flood flows for both the two-year and 100-year floods. (m) Structures built across the channel to impound water to meet site runoff storage requirements shall be prohibited on any perennial stream unless part of a public flood control project with a net watershed benefit. Those streams appearing as blue on a USGS Quadrangle Map shall be assumed to be perennial unless better data is provided by the developer. In all cases it must be demonstrated that all such structures will not cause short-term or long-term stream instability. Where such facilities are approved the applicant must also comply with subsection 109-23(g).
(Ord. No. 2015-093-O, 5-4-2015)