§ 109-30 — Erosion and sediment control and stormwater pollution prevention plan

Code of Ordinances of the City of Rockford, Illinois (Supp. No. 18: codified through Ordinance No. 2024-245-O, enacted December 2, 2024) · Rockford Code of Ordinances § 109-30

Corpus is an independent public-information project, not the official City of Rockford website. Stable reference: corpuslaw.us/code/f5ceb76c-7cb5-4441-8315-b71e114bc469

Sec. 109-30. - Erosion and sediment control and stormwater pollution prevention plan

(a) All projects within the City of Rockford limits shall follow the requirements as detailed in the Illinois Environmental Protection Agency's General Construction Permit (ILR10). (b) The City of Rockford reserves the right to be more restrictive than the general construction permit if the administrator, or their designee, considers it necessary. This may require erosion and sediment control plans be submitted for land disturbance less than one acre. (c) Erosion and sediment control planning shall be part of the initial site planning process. In planning the development of the site, the applicant shall consider the sensitivity of existing soils to erosion and topographical features such as steep slopes, stream corridors and special management areas which must be protected to reduce the amount of erosion and sediment which occurs. Where appropriate, existing vegetation shall be protected from disturbance during construction by fencing or other means. In the planning process the applicant shall also address the following: (1) For projects that involve phased construction, existing land cover for those areas not under current development shall be addressed. If existing land cover does not consist of appropriate dense vegetation then these phases shall be planted temporarily to reduce erosion from idle land. (2) In planning the erosion and sediment control strategy, preference shall be given to reducing erosion rather than controlling sediment. In order to accomplish this, the plan must carefully consider the construction sequence of the phases so that the amount of land area exposed to erosive forces is the minimum consistent with completing construction. (d) Erosion and sediment control planning, standards and specifications shall be in accordance with the latest edition of the Illinois Urban Manual, (http://www.aiswcd.org/illinois-urban-manual/) or similar document(s). (e) The runoff from disturbed areas shall not leave the site without first passing through sediment control measures or devices. This requirement shall apply to all phases of construction and shall include an ongoing process of implementation of measures and maintenance of those measures during both the construction season and any construction shutdown periods. (f) The condition of the construction site for winter shutdown shall be addressed early in the fall growing season so that slopes and other bare earth areas may be stabilized with temporary and/or permanent vegetative cover for proper erosion and sediment control. All open areas that are to remain idle throughout the winter shall receive temporary erosion control measures including temporary seeding, mulching and/or erosion control blanket prior to the end of the fall growing season. The areas to be worked beyond the end of the growing season must incorporate soil stabilization measures that do not rely on vegetative cover such as erosion control blanket and heavy mulching. (g) In the hydraulic and hydrologic design of major erosion control measures (those whose tributary drainage area is greater than three acres) such as sediment basins and traps, diversions and the like, the design frequency shall be commensurate with the risk of the design event being exceeded. The following design frequencies shall be regarded as minimum design frequencies for the construction period: (1) If development is estimated to be completed in less than six months, the storm event having a 50 percent chance (two-year event) of being exceeded in any year shall be used for design purposes. (2) If development is estimated to be completed in more than six months but less than one year, the design frequency for major sediment basins shall be a rainfall event with a 20 percent (five-year event) chance of been exceeded in any one year. (3) If development is estimated to take more than one year to complete, major sediment basins shall be designed for a rainfall event with a 10 percent (ten-year event) chance of been exceeded in any one year. (4) All sediment basins shall be designed for a minimum residence time of ten hours for detained runoff and shall include a volume for sediment storage reflective of the clean out schedule for the basin. (SDI) (h) The erosion and sediment control plan shall designate a series of practices which shall be implemented either at the direction of the applicant or the applicant's representative onsite or at the direction of the administrator should an inspection of the site indicate a deficiency in soil and sediment erosion control measures. (i) The area of disturbance onsite at any one time shall be limited to 20 acres. An additional 20 acres (a maximum of 40 acres of disturbance at any one time) may be stripped in order to balance cut and fill onsite. No additional area may be open without the permission of the administrator until the previously disturbed areas have been temporarily or permanently stabilized. (j) Erosion and sediment control plans shall be in accordance with article V and shall include the following: (1) Detailed construction phasing plan identifying erosion and sediment control measures to be in place for each phase shall be submitted. (2) Erosion and sediment control measures to be installed initially prior to stripping existing vegetation or mass grading shall be indicated on the plans. (3) Permanent stabilization measures shall be indicated on a separate plan. (4) The expected two-year and ten-year runoff rates from all offsite areas draining into the site shall be identified on the plan. (5) Methods for conveying flows through the site during construction shall be indicated. These methods must include the temporary and permanent stabilization measures to be used to reduce velocity and erosion from flow through the construction zone. (6) A maintenance schedule of each measure used shall be indicated on the plan. As a minimum, all erosion and sediment control measures onsite shall be inspected weekly or after a one-half inch or greater rainfall event and any required repairs shall be made to keep these measures functional as designed. (7) Special management areas and any required buffers shall be indicated on the erosion and sediment control plan. (k) To the extent practicable, proposed ditches and waterways which are to convey offsite flows through the site shall be stabilized upon construction. Where new waterways are constructed they shall be stabilized to the extent practicable prior to their use to convey flood flows. (l) Stockpiles of soil and other building materials (sand, limestone, etc.) shall not be located in special management areas or required buffers. If a stockpile is to remain in place for more than three days, erosion and sediment control shall be provided. (m) Storm sewer inlets shall be protected with sediment trapping and/or filter control devices during construction. (n) Water pumped or which is otherwise discharged from the site during construction dewatering shall be filtered and a means provided to reduce erosion. (o) Graveled roads, access drives, parking areas of sufficient width and length and vehicle wash-down facilities if necessary, shall be provided to prevent soil from being tracked onto public or private roadways. Any soil tracked onto a public or private roadway shall be removed before the end of each workday or sooner as directed by the authority maintaining the roadway. (p) Under no circumstances will construction waste be allowed to enter the city's storm system (inlets, curblines, drainageways, creeks, ditches etc.) nor can they be poured on the ground surface. An approved washout or waste receptacle must be available onsite. (q) Temporary stream crossings of intermittent and perennial streams used only for and during construction shall be designed to convey a two-year flood (minimum), without overtopping unless a more frequent design event is allowed by the administrator and will not obstruct the portion of the channel carrying the base flow. The entire crossing shall be designed to withstand hydrodynamic and erosive forces up to the base flood event without washing out. Ephemeral streams may be crossed at temporary at-grade crossings provided that the crossing point is stabilized with materials resistant to the erosive forces produced by runoff from the upstream drainage area and the design is approved by the administrator. All temporary stream crossings shall be completely removed and the stream restored to its preconstruction condition upon completion of construction. Restoration shall incorporate appropriate native vegetation. (USFWS)

(Ord. No. 2015-093-O, 5-4-2015)