§ 109-70 — General requirements
Code of Ordinances of the City of Rockford, Illinois (Supp. No. 18: codified through Ordinance No. 2024-245-O, enacted December 2, 2024) · Rockford Code of Ordinances § 109-70
Corpus is an independent public-information project, not the official City of Rockford website. Stable reference: corpuslaw.us/code/31e5e83b-f829-48d7-bd9f-bbd020a43243
Sec. 109-70. - General requirements.
(a) A stormwater management permit is required if: (1) The development is located in the regulatory floodplain; (2) A substantial improvement is to be located in the regulatory floodplain; (3) There is any regulatory floodplain within the site; or (4) The development disturbs more than 1,000 square feet of ground (including the removal or placement of impervious surface material) or 250 cubic yards of soil, unless the development consists solely of: a. The installation, renovation or replacement of a septic system, potable water service line or other utility serving an existing structure; b. The maintenance, repair or at grade replacement of existing lawn areas not otherwise requiring a stormwater permit under this ordinance; (b) All appropriate stormwater management related approvals and permits, including, without limitation, an IDNR-OWR Floodway/Floodplain Construction Permit, a COE 404 Permit and an IDNR-OWR Dam Safety Permit, if required, shall be obtained from all federal, state and regional authorities prior to the issuance of a stormwater management permit. (c) All permit fees shall be paid at the time of application. Permit fees shall be established by separate ordinance. Fees may be established based upon all costs incurred by the permitting authority in the administration of the permit, including, without limitation, the costs of review and inspections both during and after construction within the period for the establishment of permanent cover. (d) (1) The design of stormwater facilities, calculations for the determination of the regulatory floodplain and calculations of the impacts of development shall meet the standards of this ordinance and shall be prepared, signed, and sealed by a professional engineer. The signature and seal of such professional engineer shall stand as his or her opinion that the submittals which accompany the permit application meet the requirements of this chapter. (2) a. For projects which include earth embankments which are subjected to a differential water pressure the submittal shall include evidence that the embankment design and construction specifications are adequate for the design conditions. This review shall include consideration of the existing foundation soils for the embankment, the materials from which the embankment is to be constructed, compaction requirements for the embankment and protection of the embankment from failure due to overtopping. Specifications for the construction and materials for all such embankments shall be included. When directed by the administrator, or when the impounded water pressure differential exceeds three feet or when appropriate considering the volume impounded and water surface elevation differential to which the embankment is subjected, these calculations may be required to be reviewed, signed and sealed by a qualified geotechnical or registered structural engineer. b. For structures (not including earth embankments) that are subject to a differential water pressure greater than three feet the submittal shall, at a minimum, be reviewed by a professional engineer. Such reviews shall include stability of the structure under design conditions considering the protection of downstream life and property in the event of a failure. When directed by the administrator the calculations submitted for such structures shall be reviewed, signed and sealed by a registered structural engineer. (3) A topographical map of the site, record drawings and other required drawings shall be pre-pared, signed, and sealed by a professional land surveyor or professional engineer and referenced to the National Geodetic Vertical Datum, 1929 adjustment, any FEMA benchmarks and, if the site is more than 20 acres, to the Winnebago County Survey Control Network. Plats for new subdivisions more than 20 acres in size shall be submitted to the director in one of the electronic formats designated by the city.
(Ord. No. 2015-093-O, 5-4-2015; Ord. No. 2015-266-O, 12-21-2015)
Ask a question about Rockford law
Corpus searches the Rockford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
