For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 109-74 — Plan set submittal

Code of Ordinances of the City of Rockford, Illinois (Supp. No. 18: codified through Ordinance No. 2024-245-O, enacted December 2, 2024) · Rockford Code of Ordinances § 109-74

Corpus is an independent public-information project, not the official City of Rockford website. Stable reference: corpuslaw.us/code/9714b52f-0f23-4c81-af58-3cfe0129fe71

Sec. 109-74. - Plan set submittal.

All applicants for a stormwater permit shall provide the following basic plan exhibits: site topographical map, general plan view drawing, sediment/erosion control plan, SWPPP (if applicable) and a vicinity topographical map. Each exhibit may be on more than one drawing for clarity. The specific information to be included on each exhibit shall be as noted below. (a) Site topographical map: (1) Map scales as one inch = 100 feet (or less) and accurate to one-half foot; (2) Existing and proposed contours onsite (one foot maximum contour interval) and within 100 feet of the site; (3) Existing and proposed drainage patterns and watershed boundaries; (4) The location and dimensions of all buildings and additions to buildings; (5) Delineation of pre-development regulatory floodplain and floodway limits; (6) Delineation of post-development regulatory floodplain and floodway limits; (7) Location of cross-sections and any other hydrologic or hydraulic computer modeled features; (8) Location of all onsite drain tiles; (9) Boundaries of all wetlands, lakes, ponds, etc., with normal water elevation noted; (show areas of wetlands to be impacted either under permit or otherwise if a permit is not required); (10) Nearest base flood elevations; (11) The elevation of the lowest floor (including basement) of all proposed buildings subject to the requirements of article IV of this chapter; (12) FEMA and reference benchmarks used; and (13) All contours used in the calculation of depressional storage highlighted. (b) General plan view drawing: (1) Drawing at the same scale as the site topographical map; (2) Existing major and minor stormwater systems; (3) Proposed major and minor stormwater systems; (4) Design details for stormwater facilities (i.e., structure and outlet work detail drawings, etc.); (5) Scheduled maintenance program for permanent stormwater facilities including BMP; (6) Planned maintenance tasks and schedule; (7) Identification of persons responsible for maintenance; (8) Permanent public access maintenance easements granted or dedicated to, and accepted by, a government entity; (9) Proposed regulatory floodplain and floodway location (with the base flood and flood protection elevations noted); (10) Existing waters of the U.S. including wetlands, a certified wetland determination obtained from NRCS and required buffers; (11) Areas of directly connected impervious areas and any off-setting landscaped areas as de fined in subsection 109-23(g) indicated; (12) All plan areas at elevations below the 100-year high water elevation of site runoff storage facilities highlighted; and (13) Where a 500-year regulatory flood profile is available, the plan limit of the 500-year floodplain. (c) Sediment and erosion control plan or SWPPP in accordance with article III: (1) Drawings at the same scale as the site topographical map; (2) Sediment and erosion control installation measures and schedule; (3) Existing and proposed roadways, structures, parking lots, driveways, sidewalks and other impervious surfaces; (4) Limits of clearing and grading; (5) Special management areas located; (6) Proposed buffer locations, existing soil types, vegetation and land cover conditions; (7) List of maintenance tasks and schedule for sediment and erosion control measures; (8) Locations where Stormwater discharges from the site; and (9) The name, address and phone number at which the person responsible for erosion and sediment control may be reached on a 24-hour basis. (d) Vicinity topographical map. (1) Vicinity topographical map identifying all offsite areas draining to the development and down-stream to the receiving intermittent or perennial stream; (a two-foot contour map is preferred at a scale readable by the reviewer but a USGS quadrangle map is acceptable); (2) Watershed boundaries for areas draining through or from the development; (3) Soil types related to hydrologic soils group, vegetation and land cover affecting runoff upstream of the site for any area draining through the site; (4) Location of site within the major watershed(s); and (5) Shows the overland flow path from the downstream end of the development to the receiving intermittent or perennial stream.

(Ord. No. 2015-093-O, 5-4-2015)

Ask a question about Rockford law

Corpus searches the Rockford sections it holds and shows the ones that match, with their citations. Free, no sign-in.