For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 121-9 — Required improvements

Code of Ordinances of the City of Rockford, Illinois (Supp. No. 18: codified through Ordinance No. 2024-245-O, enacted December 2, 2024) · Rockford Code of Ordinances § 121-9

Corpus is an independent public-information project, not the official City of Rockford website. Stable reference: corpuslaw.us/code/605a34e7-6ae4-4e7e-a0a0-d5b13c0b0a17

Sec. 121-9. - Required improvements.

(a) Street and utility improvements. (1) All subdivisions shall be served with city water and public sanitary sewer. (2) No improvements in a subdivision shall be accepted for public maintenance until all improvements to be dedicated to the city are complete in accordance with the public improvements completion agreement and two sets of record drawings (one bond copy and one copy in an appropriate digital format) approved by the department of public works. The requirements for the record drawings shall be those contained in the current version of the engineering design criteria for public works improvements. (3) No improvements of the stormwater system shall be accepted until a copy of the recorded post construction management plan is submitted to the department of public works. (4) Streetlights shall be provided by the developer as provided in the department of public works' current engineering design criteria for public works improvements as part of the required public improvements to the subdivision. The department of public works may require as a condition of a building permit on any lot which has an easement for underground cable for the purpose of street lighting that said cable has been installed or that a signed customer work agreement with Commonwealth Edison or other lighting contractor be submitted to the city. Streetlights shall be installed by the developer within each phase of a platted subdivision prior to the issuance of any temporary occupancy permits. (b) Placement of utilities. In all new subdivisions, all utilities shall be installed underground. The installation of such facilities shall be in compliance with the applicable orders, rules and regulations of the Illinois Commerce Commission now or hereafter effective. (c) Monuments. (1) Iron pins three-quarters of an inch in diameter and four feet long shall be placed at all block corners, angle points of streets and of exterior boundaries, points of tangency of curved lines, points at which street lines intersect the exterior lines of the subdivision. (2) Iron pins five-eighths inch in diameter and three feet long shall be placed at all other lot corners. (3) Monuments shall be placed at all lake or stream ends of lot lines. Such monuments shall be placed flush with the ground at the point of intersection of the lot line with a line, which is established along the shore not less than 20 feet back from the normal water elevation of such lake or banks of such stream.

(Code 1970, § 27-9; Ord. No. 1989-295-O, 11-6-1989; Ord. No. 1992-1-O, 1-13-1992; Ord. No. 2002-130-O, 5-28-2002; Ord. No. 2004-42-O, 3-15-2004; Ord. No. 2006-3-O, § 3, 1-3-2006; Ord. No. 2007-277-O, § 27-9, 12-17-2007; Ord. No. 2015-169-O, 8-17-2015)

Ask a question about Rockford law

Corpus searches the Rockford sections it holds and shows the ones that match, with their citations. Free, no sign-in.