For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50.05 — Temporary service

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 50.05

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/3225c0d3-a3d8-465c-9832-f4d6fbdac150

§ 50.05. - Temporary service.

(a) When service is required for short periods of time for uses of a temporary nature, such as for construction projects, exhibitions, and traveling shows, and the utility is required to install additional facilities on a temporary basis, such as line extensions, transformers, meters, and other items, the customer shall pay the cost of installing and removing all such facilities. (b) The utility will quote a charge for all temporary facilities depending on the particular requirements of each installation. Payment for all temporary facilities will be required in advance. (c) The charge for power and energy, billed monthly, for temporary installations, will be at the applicable rate with an advance deposit required of such amount as determined by the utility. (d) The cost of furnishing temporary service for home building when no line extension or pole setting is required shall be $150. The cost of furnishing temporary service for special events such as city approved street celebrations, park area celebrations and similar events for a period not to exceed one week when no line extension or pole setting is required shall be $100. (e) Listed below are the usual type of facilities required for temporary service. All prices are limited to a maximum 200 amp service and line extension of no more than two spans. The prices of each are based on labor, equipment, and overhead costs as of the date of this Code and are subject to revision when these costs change. For Single Phase Temporary Service | Costs Line extension per span (primary or secondary) | $250 Setting one tangent pole | 570 Setting dead-end pole | 610 Installing a single transformer | 935 Installing an anchor and guy | 300 Installing service drop and meter | 150 For Three Phase Temporary Service | Costs Line extension per span (primary or secondary) | $ 300 Setting one tangent pole | 705 Setting one dead-end pole | 970 Installing a transformer bank | 2,100 Installing an anchor and guy | 300 Installing service drop and meter | 200 (f) Any special service requirements of the customer other than those outlined above shall be estimated by the utility's engineer. Payments shall be made in advance based on the above listed estimate. All of the above prices are subject to any applicable tax imposed on the utility as provided in section 50.25.

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.