§ 13.05.040 — Erosion and pollution prevention and elimination requirements
Code of Ordinances, City of Bloomington, Indiana (Supp. No. 51, Update 1: codified through Ordinance No. 2026-15, passed July 17, 2026) · Bloomington Municipal Code § 13.05.040
Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/1d9e62ef-0043-4ed8-a2be-16ed8ba8a7cf
13.05.040 - Erosion and pollution prevention and elimination requirements.
(a) All project sites undergoing land disturbing activities, regardless of size, shall prevent the illicit discharge of pollutants off-site or conveyed into any stormwater drainage system, either by wind or water in accordance with the MS4GP and the CSGP. All land disturbing activities shall be protected by best management practices. Best management practices may include, but are not limited to, silt or erosion-control fences, filter socks, sedimentation basins, articulated concrete blocks, mechanically stabilized earth, storm grate filters, or erosion control mats. (b) For land-disturbing activities that include or occur adjacent to environmentally sensitive areas, including but not limited to steep slopes, karst features, floodplain, wetlands, and riparian buffers; redundant erosion control measures, such as additional barriers and reduced timelines for soil stabilization, may be required, as determined by the CBU director or their designee in accordance with the MS4GP and CSGP. (c) Existing natural buffers that are adjacent to waters of the state must be preserved to promote infiltration and provide protection of the water resource, unless infeasible. Activities performed by a county drainage board under Indiana Code, § 36-9-27 are excluded. (1) Natural buffers must be preserved, including the entire buffer bordering and/or surrounding the water resource. Existing buffers: (A) Fifty feet or more in width must be preserved to a minimum of fifty feet. (B) Less than fifty feet in width must be preserved in their entirety and may be enhanced with vegetation that is native and promotes ecological improvement and sustainability. (2) Runoff directed to the natural buffer must be: (A) treated with appropriate erosion and sediment control measures prior to discharging to the buffer; and (B) managed with appropriate runoff control measures to prevent erosion from occurring within the buffer area. (3) Further information regarding buffer requirements is contained in IDEM's "Implementation of Buffers" guidance document. (d) Waste and unused building materials (e.g. garbage, debris, cleaning wastes, concrete waste, wastewater, toxic materials, or hazardous materials) shall be properly disposed of in facilities labeled and designed for the containment of those materials while minimizing air, soil, and water pollution to the maximum degree practicable. (e) Proper storage and handling of materials, such as fuels or hazardous wastes, and spill prevention and clean-up measures shall be implemented to minimize the potential for pollutants to contaminate surface or groundwater or degrade soil quality. To meet this requirement: (1) Proper project management and the utilization of appropriate measures including, but not limited to, eliminating a source or the exposure of materials must be completed. (2) Manage the following activities: (A) Fueling and maintenance of equipment. (B) Washing of equipment and vehicles. (C) Storage, handling, and disposal of construction materials, products, and wastes. (D) Application of pesticides, herbicides, insecticides, and fertilizers. (E) Dispensing and utilization of diesel fuel, oil, hydraulic fluids, other petroleum products, and other chemicals. (F) Handling and disposal of hazardous wastes, including, but not limited to paints, solvents, petroleum-based products, wood preservatives, additives, curing compounds, and acids. (G) Washing of applicators and containers used for paint, grout, or other materials. (f) Appropriate measures must be implemented to eliminate wastes or unused building materials including, but not limited to garbage, debris, cleaning wastes, wastewater, concrete or cementitious washout water, mortar/masonry products, soil stabilizers, lime stabilization materials, and other substances from being carried from a project site by run-off or wind. (g) Construction and domestic waste must be managed to prevent the discharge of pollutants and windblown debris. Hardened concrete/cementitious materials are not required to be placed in trash receptacles and are considered clean fill that may be reused, disposed of on-site, or recycled in accordance with applicable state and federal regulations. Management of waste materials may include, but are not limited to: (1) Waste containers, when selected to manage waste, must be managed to reduce the discharge of pollutants and blowing of debris. Receptacles that are not appropriately managed will require alternatives that include but are not limited to: (A) A cover to minimize exposure of wastes to precipitation or (B) A similarly effective method designed to minimize the discharge of pollutants. (C) Waste that is not disposed of in trash receptacles must be protected from exposure to the weather and/or removed at the end of the day from the project site and disposed of properly. (h) Concrete or cementitious washout areas, where washout is permissible, must be identified for the project site and the locations clearly posted. Wash water must be directed into leak-proof containers or leak-proof containment areas which are located and designed to divert run-off away from the measure and sized to prevent the discharge and/or overflow of the wash water. (i) Public roadways and roadways not exclusive to construction traffic must be kept cleared of accumulated sediment that is a result of run-off or tracking. Any sediment that leaves the project site is a violation of this SMO. The following minimum conditions are applicable: (1) Clearing of sediment must not include the utilization of mechanical methods that will result in mobilization of dust off the project site or flushing the area with water unless the flushed water is directed to an appropriate sediment control measure. (2) Cleared sediment must be redistributed or disposed of in a manner that is in accordance with all applicable statutes and regulations. (3) Sediment discharged or tracked onto roadways that are open to traffic must be removed as directed by a regulatory authority or at a minimum, removed by the end of the same day. (j) Stable construction site access measures must be provided at all points of construction traffic ingress and egress to the project site. Where the selected measure is not effective, an alternative measure or additional controls must be utilized to minimize tracking. (k) Minimize the generation of dust through dust suppression techniques to prevent deposition into waters of the state and areas located beyond the permitted boundaries of the project site. (l) All storm inlets shall be protected with best management practices meeting accepted design criteria, standards and specifications in the stormwater design manual. (m) Sediment shall be controlled and contained on-site, and control measures shall prevent damage to existing vegetation, environmentally-sensitive areas, and/or pavement. (n) The project site owner shall post a notice near the main entrance of the project site. For linear project sites, such as a pipeline or highway, the notice must be placed in a publicly accessible location near the project field office. The notice must be maintained in a legible condition and contain the following information: (1) Copy of the completed NOI letter, public notification documentation, and the NPDES permit number, where applicable; (2) Name, company name, telephone number, e-mail address (if available), and address of the project site owner or a local contact person; (3) Location of the construction plan if the project site does not have an on-site location to store the plan. (o) Un-vegetated areas that are left idle or scheduled to be left inactive must be temporarily or permanently stabilized with measures appropriate for the season to minimize erosion potential. To meet this requirement, the following apply: (1) Stabilization must be initiated by the end of the seventh day the area is left idle. The stabilization activity must be completed within fourteen days after initiation. Initiation of stabilization includes, but is not limited to, the seeding and/or planting of the exposed area and applying mulch or other temporary surface stabilization methods where appropriate. Areas that are not accessible due to an unexpected and disruptive event that prevents construction activities are not considered idle. (2) Areas that have been compacted may be excluded from the stabilization requirement when the areas are intended to be impervious surfaces associated with the final land use, provided run-off from the area is directed to appropriate sediment control measures. (p) All soil stockpiles shall be protected by erosion control barriers and areas that remain inactive for seven days or more shall be seeded, covered, or protected. (q) Channelized runoff from off-site areas passing through a construction site shall be diverted around disturbed areas. Sheet flow runoff from off-site areas shall also be diverted around disturbed areas. Diverted runoff shall be conveyed in a manner that will not erode the conveyance and receiving channels. (r) Land-disturbing activity shall be performed in a construction sequence that minimizes the area of bare soil exposed at any one time. Construction sequencing associated with land disturbance shall be subject to the approval of the MS4 program coordinator or their designee. (s) Topsoil shall be preserved, unless infeasible. (t) During the period of construction activities, all stormwater quality measures necessary to meet the requirements of this rule shall be maintained in working order. Alternative measures must be selected and implemented, as necessary. (u) Fertilizer applications associated with the stabilization plan for the project must meet the following requirements: (1) Apply fertilizer at a rate and amount as determined by a soil analysis or in accordance with the Indiana Stormwater Quality Manual or similar guidance documents. (2) Apply fertilizer at an appropriate time of year for the project location, taking into consideration proximity to a waterbody, and preferably timed to coincide with the period of maximum vegetative uptake and growth. (3) Avoid applying fertilizer immediately prior to precipitation events that are anticipated to result in stormwater run-off from the application area. (v) Cationic polymers are not authorized for use in the State of Indiana. The use of anionic polymers on the project site for sediment control shall be in accordance with current State of Indiana standards and specifications and the use shall be approved by IDEM and CBU. (w) Discharge water from dewatering of ground water from excavations, trenches, foundations, etc. must not be discharged when: (1) Sediment-laden water is not first directed to an appropriate sediment control measure or a series of control measures that minimizes the discharge of the sediment. (2) A visible sheen and/or pollutants are present at a level that requires additional treatment and/or an alternate permit. (x) Sediment basins, where feasible, shall withdraw water from the surface of the water column unless equivalent sediment reduction can be achieved by use of alternative measures. (y) Personnel associated with the project must be informed of the terms and conditions of the CSGP and the requirements within the SWPPP. The permittee is required to document this process. Information must be provided through written notification, contracts, or other means that effectively communicates the provisions and requirements of the permit and SWPPP. Personnel may include, but are not limited to: (1) General contractors, construction management firms, grading or excavating contractors, and trade industry representatives associated with the overall project. (2) Contractors or individual lot operators that have primary oversight on individual building lots. (3) Those responsible for the implementation of the SWPPP, and the installation, repair, and maintenance of stormwater measures. (4) Those responsible for the application and storage of treatment chemicals. (5) Those responsible for administering the self-monitoring program.
(Ord. No. 2024-08, § 1, 5-8-2024; Ord. No. 2025-24, § XII, 7-30-2025)