For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20.06.050 — Development permits and procedures

Code of Ordinances, City of Bloomington, Indiana (Supp. No. 51, Update 1: codified through Ordinance No. 2026-15, passed July 17, 2026) · Bloomington Municipal Code § 20.06.050

Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/2a05c285-9562-45d4-90c4-7a673854658b

20.06.050 - Development permits and procedures.

(a) Site Plan Review. (1) Purpose. The site plan review procedure is intended to ensure that potential impacts of development are considered before submittal of a petition for construction or issuance of a building permit and to: (A) Promote well-planned and well-designed use of property; (B) Promote a high character of community development; (C) Review site plans relative to site layout, improvements and engineering in the interest of public health, safety, convenience, and welfare; (D) Promote new development that has a positive impact on the community as a whole, does not negatively impact neighbors, protects sensitive natural resources, is well-designed to maximize efficient use of the land and surrounding transportation system, and provides for adequate stormwater management; (E) Determine compliance with the standards of this UDO; (F) Protect environmental quality; and (G) Ensure that the statutory requirements established in the Indiana Code for development plan review and approval are met. (2) Applicability. (A) Activities Subject to Site Plan Review. Site plan review is required prior to the issuance of a building permit and/or construction of physical site improvements. Site plan review is required for all development and changes in use subject to this UDO, including the following, unless exempted by subsection (B) below: i. New building construction; ii. Newly established uses of land; iii. Expansions, alterations, or modifications of existing structures or sites for commercial, public, institutional, civic, employment, utilities and communication, group living, and multifamily residential uses of property within the City that result in increased occupancy or intensity of use; and iv. Creation or expansion of any vehicular parking area. (B) Activities Exempt from Site Plan Review. Site plan review is not required for the following activities, but such activities shall be subject to the standards of this UDO and building permit review: i. Construction of a single-family detached, duplex, triplex, or fourplex dwelling on a single lot, additions to such dwellings, an accessory dwelling unit, and structures accessory to such dwellings; and ii. Construction or erection of accessory buildings, fences, hedges, or walls; and iii. Interior tenant alterations or improvements that do not increase parking requirements or alter exterior building appearances. iv. Projects that fall below the thresholds for minor site plan review in Section 20.06.050(a)(2)(C)i. (C) Thresholds for Minor and Major Site Plan Review. Site plan review is conducted by the Planning and Transportation Director or the Plan Commission, based on the thresholds below: i. Minor Site Plan Review. Minor site plan review is required for any of the following activities unless that activity is exempt from the site plan process under Section 20.06.050(a)(2)(B) (Activities Exempt from Site Plan Review), or the project meets or exceeds the thresholds requiring major site plan review under Section 20.06.050(a)(2)(C)ii. (Major Site Plan Review). 1. A change in use that involves or requires site improvements; 2. Any expansion, alteration, or modification of a lawful nonconforming site feature or building that meets or exceeds the thresholds established in Section 20.06.090(f)(2) (Limited Compliance), and falls below the thresholds for major site plan review in Section 20.06.050(a)(2)(C)ii.; 3. Development that contains twenty thousand square feet or less of new non-residential gross floor area; 4. Development that contains fifty dwelling units or less; 5. The alteration of any vehicular parking area; 6. Petitions for a site development permit; or 7. Projects that qualify for affordable housing incentives and/or sustainable development incentives established in Section 20.04.110 (Incentives), provided that, if located adjacent to one or more lots in an R1, R2, R3, or R4 district such project does not contain more than seventy-five dwelling units. ii. Major Site Plan Review. Major site plan approval is required for any project that meets or exceeds the following criteria, unless otherwise exempted from site plan review under Section 20.06.050(a)(2)(B) (Activities Exempt from Site Plan Review): 1. Any minor site plan determined by the Planning and Transportation Director to require major site plan review due to unusual size, complexity, or the creation of potential significant unanticipated impacts on the City or surrounding neighborhoods; or 2. Any project that would individually qualify for minor site plan review but that, when considered collectively with prior minor site plan approvals for adjacent lots or sites under common or related ownership within the last three years, would have required major site plan review, if the Planning and Transportation Director concludes that the combined impact of any such adjacent projects creates impacts similar to those requiring major site plan review. 3. Anything that exceeds minor site plan review thresholds. (3) Minor Site Plan Review Process. Figure 06.05-1 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to minor site plan review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-1: Summary of Minor Site Plan Review Procedure (A) Pre-Submittal Activities. A pre-submittal meeting is required in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). (B) Petition Submittal and Processing. The minor site plan petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (C) Staff Review and Action. i. Generally. 1. The Planning and Transportation Director shall review the minor site plan petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria). 2. Alternatively, the Planning and Transportation Director may refer the petition to the Plan Commission pursuant to Section 20.06.040(d)(2) (Petition Routing). ii. Commitments. The Planning and Transportation Director may allow or require the owner of a parcel of real property to make a written commitment concerning use and/or development of that parcel in connection with approval of a site plan pursuant to Section 20.06.040(d)(8) (Commitments). iii. Additional Review for Drainage and Floodplain. Any projects that are determined by the Planning and Transportation Department to be located within an identified floodway, flood fringe, or within the floodplain shall also meet the criteria in Section 20.04.040 (Floodplain). (D) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Notification of Findings. The Planning and Transportation Director shall make and sign written findings concerning each decision to approve or disapprove a minor site plan, and such written findings shall be made available to the petitioner. ii. Expiration of Approval. Approval of a minor site plan shall be effective for a maximum period of one year unless, upon petition by the petitioner, the Planning and Transportation Director grants an extension during that one year period and pursuant to Section 20.06.040(h)(1) (Expiration of Approval). A site plan approval will be considered expired if no Site Development Permit has been approved related to the site plan within the one year period or the approved extended time period. Or, in the case where no Site Development Permit is required, no Certificate of Zoning Compliance for a building permit on the site plan has been approved related to the approval within the one year period, or the approved extended time period. iii. Modification or Amendment of Approval. An approved minor site plan may be modified or amended in accordance with Section 20.06.040(h)(3) (Modification or Amendment of Approval). iv. Appeal. Any person, other than the petitioner, aggrieved by a minor site plan decision by the Planning and Transportation Director may appeal the decision to the Plan Commission. Such appeal shall be filed in the Planning and Transportation Department within ten days of the staff's decision. The appeal shall specify the grounds for the appeal and shall be filed in the form established by the Plan Commission rules of procedure. All appeals shall be accompanied by fees required by the Plan Commission rules of procedure. (4) Major Site Plan Review Process. Figure 06.05-2 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to major site plan review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-2: Summary of Major Site Plan Review Procedure (A) Pre-Submittal Activities. i. A pre-submittal meeting shall be held in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). ii. A development review committee meeting shall be held in accordance with Section 20.06.040(b)(2) (Development Review Committee (DRC) Meeting). iii. A pre-submittal neighborhood meeting shall be held in accordance with Section 20.06.040(b)(3) (Pre-Submittal Neighborhood Meeting). (B) Petition Submittal and Processing. The major site plan petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (C) Staff Review and Action. The planning and transportation staff shall review the petition and prepare a staff report and recommendation in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria). (D) Scheduling and Notice of Public Hearings. The major site plan petition shall be scheduled for a public hearing before the Plan Commission and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings). (E) Review and Decision. i. Generally. The Plan Commission shall review the major site plan petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(g) (Review and Decision), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria). ii. Commitments. The Plan Commission may allow or require the owner of a parcel of real property to make a written commitment concerning use and/or development of that parcel in connection with approval of a site plan pursuant to Section 20.06.040(d)(8) (Commitments). iii. Additional Review for Drainage and Floodplain. Any projects that are determined by the Planning and Transportation Department to be located within an identified floodway, flood fringe, or within the floodplain shall also meet the criteria in Section 20.04.040 (Floodplain). (F) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Notification of Findings. The Plan Commission shall make written findings concerning each decision to approve or disapprove a major site plan, and such findings shall be made available to the petitioner. ii. Expiration of Approval. Approval of a major site plan shall be effective for a maximum period of one year unless, upon petition by the petitioner, the Plan Commission grants an extension during that one year period and pursuant to Section 20.06.040(h)(1) (Expiration of Approval). A site plan approval will be considered expired if no Site Development Permit has been approved related to the site plan within the one year period or the approved extended time period. Or, in the case where no Site Development Permit is required, no Certificate of Zoning Compliance for a building permit on the site plan has been approved related to the approval within the one year period, or the approved extended time period. iii. Modification or Amendment of Approval. An approved major site plan may be modified or amended in accordance with Section 20.06.040(h)(3) (Modification or Amendment of Approval). (b) Conditional Use Permit. (1) Purpose. The Conditional Use permit procedure provides a mechanism for the City to evaluate proposed land uses in a particular zoning district and to establish certain conditions to address unique characteristics associated with the proposed land use. The use shall be permitted by the Board of Zoning Appeals or hearing officer if it is determined that the listed conditions are met. (2) Applicability. No use classified as conditional in Table 03-1 (Allowed Use Table), or any other standard in this UDO may be conducted without first obtaining a Conditional Use permit under this Section 20.06.050(b) (Conditional Use Permit). No Conditional Use shall be conducted except in compliance with all applicable provisions of this UDO and with any conditions upon such Conditional Use Approval. (3) Conditional Use Permit Review Process. Figure 06.05-3 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to Conditional Use permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-3: Summary of Conditional Use Permit Procedure (A) Pre-Submittal Activities. i. A pre-submittal meeting shall be held in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). ii. Petitions subject to review and decision by the hearing officer shall not require a development review committee meeting or a pre-submittal neighborhood meeting. iii. For petitions subject to review and decision by the Board of Appeals, a Development Review Committee meeting and pre-submittal neighborhood meeting may be required by the Planning and Transportation Director, in accordance with Section 20.06.040(b)(2) (Development Review Committee (DRC) Meeting) and Section 20.06.040(b)(3) (Pre-Submittal Neighborhood Meeting). The requirements of Sections 20.06.050(b)(3)(D) and 20.06.050(b)(3)(E)(v) apply to conditional use permit petitions for the "Dwelling, Duplex" use in the R1, R2, or R3 zoning districts. (B) Petition Submittal and Processing. The Conditional Use permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (C) Staff Review and Action. The Planning and Transportation Director shall review the petition and prepare a staff report and recommendation in accordance with Section 20.06.040(d) (Staff Review and Action). (D) Scheduling and Notice of Public Hearings. The conditional use permit petition shall be scheduled for a public hearing before the Board of Zoning Appeals or Hearing Officer and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings). Conditional use permit petitions for the "Dwelling, Duplex" use in the R1, R2 or R3 zoning districts shall be scheduled for a public hearing before the Board of Zoning Appeals and noticed in accordance with Section 20.06.040(e). (E) Review and Decision. i. Generally. The hearing officer or Board of Zoning Appeals shall review the Conditional Use permit petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d)(7) (Conditions of Approval), based on the general approval criteria in Section 20.06.040(d)(6) (Approval Criteria), and the following specific approval criteria: ii. Floodway and Floodway Fringe Development. 1. No Conditional Use shall be approved until a permit citing the one hundred year flood elevation and the recommended flood protection grade, or a letter stating that no permit is required, has been obtained from the Indiana Department of Natural Resources (DNR) and all conditions and specifications of that permit and other applicable DNR regulations are met. 2. Development shall not increase the elevation of the regulatory flood beyond the limits allowed by state and federal regulations. 3. On-site waste disposal systems such as sewage treatment plants shall be located so as to avoid their impairment and to avoid contamination during the occurrence of the regulatory flood. No septic systems shall be installed within either floodway or floodway fringe areas. 4. New and replacement sanitary sewer lines and on-site waste disposal systems may be permitted provided that all manholes or other above ground openings are located at or above the flood protection grade, or those which are located below the flood protection grade are watertight. iii. Historic Adaptive Re-Use. The following shall apply to any adaptive use, protection, or restoration of a historic resource for a land use not specifically permitted in the zoning district pursuant to Table 03-1 (Allowed Use Table). 1. The property shall have been designated historic at the local level, or have had a petition filed for such designation, at the time of petition for Conditional Use Approval. 2. The proposed use shall not diminish the historic character of the property or, if it is located within an historic district, the historic character of said historic district. 3. The proposed use shall enhance the ability to restore and/or preserve the property. 4. The granting of the Conditional Use Approval shall be contingent upon any required certificate of appropriateness and upon the granting of a local historic designation or the presence of such designation being in place. iv. Quarry Adaptive Re-Use. 1. The petitioner shall provide documentation that limestone or other stone processing operations are no longer feasible due to environmental and/or physical site characteristics. Market economic conditions may be considered, but the purpose is to protect these natural resources from encroachment of other land uses that may inhibit or prevent quarry or stone processing activities. 2. The proposed adaptive re-use shall retain, to the greatest extent possible, the existing quarry features to preserve the region's quarry heritage. 3. Land use decisions shall be made in consideration of the dominant land use patterns that surround each site. 4. The proposed adaptive re-use shall be a less intense land use than quarry uses in regard to environmental regulatory standards and general nuisance in regard to noise, vibration, and dust. 5. An environmental mitigation plan shall be submitted with the Conditional Use petition. The environmental mitigation plan shall include, but not be limited to cleanup measures, water quality protection, and long-term monitoring standards. All environmental mitigation plans shall meet the standards of the City utilities department, as well as any applicable state and federal requirements. v. Dwelling, Duplex in R1, R2, or R3 Zoning Districts. Conditional use permit petitions for the "Dwelling, Duplex" use in the R1, R2, or R3 zoning districts shall require a pre-submittal neighborhood meeting in accordance with Section 20.06.040(b)(3) (Pre-Submittal Neighborhood Meeting). vi. Commitments. 1. The board of zoning appeals or hearing officer may allow or require the owner of a parcel of real property to make a written commitment concerning use and/or development of that parcel in connection with approval of a Conditional Use permit in accordance with Section 20.06.040(d)(8) (Commitments). 2. If the owner of a parcel of real estate fails to accept a condition imposed, or to make a commitment allowed or required, by the hearing officer, then the owner's petition shall be considered withdrawn or, if requested by the owner, shall be transferred to the Board of Zoning Appeals. (F) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Effect of Approval of a Conditional Use. The granting of a Conditional Use authorizes the use and establishes the terms of use. Conditional Uses are also subject to site plan requirements, all necessary permits and approvals, and other applicable requirements. All required permits and approvals shall be obtained before any grading, construction, or use commences. ii. Duration. A Conditional Use permit granted by the Board of Zoning Appeals or the hearing officer shall expire: 1. Two years after the date granted by the Board of Zoning Appeals or hearing officer, unless: a. A building permit has been obtained and construction of the structure or structures has commenced; or b. An occupancy permit has been obtained and the use has commenced; or 2. At the date of termination established by the Board of Zoning Appeals or hearing officer as a condition or commitment if different from subsection (1) above. iii. Modification or Amendment of Approval. 1. Any modification or intensification of a Conditional Use that alters the essential character or operation of the use in a way not intended by the Board of Zoning Appeals or hearing officer at the time the Conditional Use was granted shall require a new Conditional Use Approval. 2. The Planning and Transportation Director shall determine in writing whether the proposed modification or intensification represents an alteration in the essential character of the original Conditional Use as approved. The operator of the Conditional Use shall provide the Planning and Transportation Director with all the necessary information to render this determination. 3. In the case where the Planning and Transportation Director determines a new Conditional Use permit is required, a petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing) and this Section 20.06.050(b) (Conditional Use Permit). 4. The hearing officer may hear requests for amendments to a Conditional Use, if authorized by the Plan Commission. (c) Demolition Delay Permit. (1) Purpose. The demolition delay permit procedure is intended to ensure that potentially historic structures are protected from demolition or alteration. (2) Applicability. (A) This Section 20.06.050(c) shall not apply to any structure that is within a property or group of properties locally designated as a historic district or a conservation district pursuant to Title 8 (Historic Preservation and Protection) of the Bloomington Municipal Code. (B) No certificate of zoning compliance authorizing release of a permit allowing the demolition, substantial demolition, or partial demolition of a structure that is listed as "Outstanding" or "Notable," or demolition or substantial demolition of a structure listed as "Contributing" on the City of Bloomington Survey of Historic Sites and Structures, or any accessory structure of the same era of construction as the principal structure that is so listed, shall be issued prior to review pursuant to this Subsection (c). (3) Demolition Delay Permit Review Process. Figure 06.05-4 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to demolition delay permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-4: Summary of Demolition Delay Permit Procedure (A) Pre-Submittal Activities. A pre-submittal meeting is required in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). (B) Petition Submittal and Processing. i. The demolition delay permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). ii. If a petition for demolition or partial demolition that is subject to the demolition delay procedures of this UDO is withdrawn by the petitioner, the demolition delay period shall be terminated and no certificate of zoning compliance for the withdrawn petition shall be issued. (C) Staff Review and Action. i. Notice to Property Owner and Housing and Neighborhood Development Director. 1. Upon receiving a petition for a demolition or partial demolition covered by this Section 20.06.050(c) (Demolition Delay Permit), the Planning and Transportation Director shall give notice to the housing and neighborhood development director and to the property owner, or his/her representative. Such notice shall advise the property owner that the permit petition may need to be amended to include materials required by Section 20.06.050(a) (Site Plan Review) and the rules and regulations of the Historic Preservation Commission, in order for the petition to be considered complete. 2. Not later than thirty days after such notice is given by the Planning and Transportation Director, the housing and neighborhood development director shall give notice to the chairperson of the Historic Preservation Commission and to the property owner, if the one-hundred-twenty-day waiting period is to be imposed pursuant to section 20.06.050(c)(3)(C)ii. (Waiting Period). ii. Waiting Period. 1. Determination of Waiting Period. The ninety-day period shall apply in all cases unless the housing and neighborhood development director, or his/her designee, finds that an additional thirty-day delay period is needed in order for the Historic Preservation Commission to responsibly consider and determine whether to recommend designation of the property. The housing and neighborhood development director shall make such finding only where: a. There are multiple demolition permits and/or historic designation proposals pending or expected to come before the Historic Preservation Commission during the ninety-day period; or b. The demolition request presents unusually complex public policy issues due to the location or survey classification of the structure; or c. The structure is located within an area that contains multiple surveyed properties, it is located within an area designated on the National Register of Historic Places, or the survey classification of the structure proposed for demolition or partial demolition is "notable" or "outstanding." 2. Early Termination of Waiting Period. The remainder of the waiting period shall be considered waived and the certificate of zoning compliance shall be issued if within the ninety- or one-hundred-twenty-day period one of the following occurs and all other requirements of this UDO are satisfied: a. The Historic Preservation Commission votes affirmatively not to recommend local historic designation to the Common Council; or b. The Historic Preservation Commission votes on a motion to recommend local designation and the motion fails; or c. In cases of contributing structures in a single family district, staff for the Historic Preservation Commission decides not to recommend local historic designation to the Historic Preservation Commission and Common Council based on the same review criteria used by the Historic Preservation Commission when determining if a property should be recommended for local historic designation; or d. The Common Council disapproves a recommended local historic designation of the subject property. 3. Waiting Period Limited to Once per Year. a. No structure that has been subjected to the waiting period under this section shall be subject to a second waiting period until one year has passed from the date of expiration of the first waiting period. b. During this one-year period, no action of the Historic Preservation Commission or the Common Council may prevent issuance or effect revocation of a certificate of zoning compliance or demolition permit that is otherwise properly issued or petition that meets all requirements of the Bloomington Municipal Code and this UDO. c. This provision shall not apply except to the extent that the work covered by the certificate of zoning compliance or demolition or partial demolition permit, or petition for such a certificate or permit, is substantially identical to the work shown in the submission that occasioned the first waiting period. d. For purposes of this Section 20.06.050(c)(3)(C)ii. (Waiting Period). i. "Work" includes the proposed demolition, partial demolition and any proposed construction, reconstruction, or alteration associated therewith; ii. "Substantially identical" means without significant deviation in any detail of any elevation or in the type, design, or location of materials that will be subject to public view; and iii. "Submission" shall mean the submission that is authorized to receive approval pursuant to Section 20.06.040(c) (Petition Submittal and Processing) of this Chapter 20.06 (Administration and Procedures). 4. Emergency Waiver of Waiting Period. The waiting period may be waived upon a written determination by the City's housing and neighborhood development department that there is an emergency condition dangerous to life, health, or property that requires demolition prior to the expiration of the waiting period. (D) Scheduling and Notice of Hearings. i. Discretionary Hearing. The Historic Preservation Commission may conduct a hearing, at its sole discretion, during the waiting period, to determine if any structure described below should be recommended for local designation by the Common Council: 1. A "Contributing" structure located in any of multifamily or mixed-use zoning district. 2. A "Contributing" structure located in the R1, R2, R3, or R4 zoning districts if the staff for the HPC determines that a review of the petition necessitates full HPC review. 3. A "notable" structure located in any zoning district of the City. 4. An "outstanding" structure located in any zoning district of the City. ii. Posted Notice Required. 1. Generally. a. Within three business days of receiving notice by the Planning and Transportation Director that his/her property is subject to the waiting period provisions of this section, the owner shall place upon the property where the structure is located, in plain public view, a notice to the public of the proposed demolition or partial demolition of the structure. b. The notice shall be in such form as approved by the staff and shall remain in place until termination of the waiting period. c. Noncompliance with this provision shall result in the delay period being extended by an amount of time equal to the amount of time, as reasonably determined or estimated by the Planning and Transportation Director, during which the notice was not properly in place. 2. Exemption to Posted Notice. a. This section shall not apply to a petition for partial demolition of a property classified as "contributing" in any single-family district if staff for the Historic Preservation Commission reviews and releases the petition. i. Staff, for purposes of this subsection, shall be those persons who have the same or equivalent technical expertise as the members of the Historic Preservation Commission as outlined in Section 2.16.010(c) (Composition) of the Bloomington Municipal Code. ii. If within seven business days of the receipt of a petition the staff has not taken steps to forward the matter to the Historic Preservation Commission for further review, the petition shall be released automatically and the provisions of Section 20.06.050(c) (Demolition Delay Permit) shall apply. iii. Staff's decision shall be based on the same criteria used by the Historic Preservation Commission when it renders a determination about whether or not a property should be recommended for local historic designation. b. If staff for the Historic Preservation Commission determines that full Historic Preservation Commission review of a petition for a partial demolition of a property classified as "contributing" in a single-family district is necessary, then the owner shall post the notice described in subsection D.ii.1. above on the property. (E) Review and Decision. i. After expiration of the waiting period, which shall include early termination of the waiting period, a certificate of zoning compliance authorizing demolition shall be issued if the property owner has submitted a complete petition and all other requirements of the Bloomington Municipal Code and this UDO are met. ii. For any structure that is exempt from the waiting period of this section, a certificate of zoning compliance authorizing release of a demolition or partial demolition permit shall be issued within a reasonable time following receipt by the Planning and Transportation Department of a complete petition, provided all other requirements of the Bloomington Municipal Code and this UDO are met. iii. If within the ninety- or one-hundred-twenty-day waiting period the property is placed under interim protection or is locally designated as a historic or conservation district pursuant to Chapter 8.08 (Historic Districts and Standards) of the Bloomington Municipal Code, then no certificate of zoning compliance authorizing demolition or partial demolition may be issued except: 1. Upon termination of interim protection without historic or conservation district designation being placed upon the property; or 2. Where historic or conservation district designation is placed upon the property, in accordance with and after all approvals required by Chapter 8.08 (Historic Districts and Standards) of the Bloomington Municipal Code. (F) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. The recipient of a permit or other approval subject to this section shall be bound to the details of the elevations, and the design, type, and location of materials depicted in the submission and may not deviate from such depiction, except as modified and approved at one or more public meetings of the Historic Preservation Commission, without applying for a new certificate of zoning compliance, petition for which shall commence a new waiting period. ii. No action of the Historic Preservation Commission may prevent issuance or effect revocation of such certificate of zoning compliance, or a demolition permit issued in reliance upon such certificate of zoning compliance, for a period of one year from the end of the waiting period. The demolition delay approval by the Historic Preservation Commission shall expire one year after the approval is issued. (d) Floodplain Development Permit. (1) Purpose. The floodplain development permit procedure is intended to minimize public and private losses due to flood conditions in specific areas and to provide a mechanism to ensure compliance with this UDO by providing a thorough permitting and inspection process for all floodplain development activities. (2) Applicability. (A) No development shall occur in any special flood hazard area (SFHA) and known flood prone areas, unless a required stormwater management permit per Title 13 (Stormwater) of the Bloomington Municipal Code for such activity has been issued. (B) Compliance with the standards in this UDO shall not relieve any person of the independent obligation to comply with all applicable standards and practices established in federal and state law and all other applicable rules, regulations, standards and specifications of the City regarding development within a floodplain. (C) The following activities are exempt from requiring a floodplain development permit- installation of underground utilities that do not require any fill, construction of sidewalks or similar features at existing grade, and signs. (3) Floodplain Development Permit Review Process. Figure 06.05-5 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to floodplain development permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-5: Summary of Floodplain Development Permit Procedure (A) Petition Submittal and Processing. The floodplain development permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing) with the following modifications: i. Petition Submittal Requirements. The petition shall include, but not be limited to, the following documents: 1. A description of the proposed development; 2. Location of the proposed development sufficient to accurately locate property and structure(s) in relation to existing roads and streams; 3. A legal description of the property site; 4. A site development plan showing existing and proposed development locations and existing and proposed land grades; 5. Elevation of the top of the planned lowest floor (including basement) of all proposed buildings. Elevation should be in NAVD 88 or NGVD; 6. Elevation (in NAVD 88 or NGVD) to which any non-residential structure will be floodproofed; and 7. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. A hydrologic and hydraulic engineering study is required, and any watercourse changes submitted to DNR for approval and then to FEMA as a letter of map revision. ii. Submittal to the Indiana Department of Natural Resources. If the site is in an identified floodway pursuant to Section 20.04.040(c)(1) (Basis for Establishing Regulatory Flood Data), the floodplain administrator shall require the petitioner to forward the petition, along with all pertinent plans and specifications, to the Indiana Department of Natural Resources and apply for a permit for construction in a floodway. iii. Petitions Involving Channel Modifications or Fill. For all projects involving channel modifications or fill (including levees) the City shall submit the data and request that the Federal Emergency Management Agency revise the regulatory flood data per mapping standard regulations found at 44 CFR § 65.12. (B) Staff Review and Action. The floodplain administrator shall review the floodplain development permit petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria) and the following specific approval criteria: i. Ensure that all necessary federal or state permits have been received prior to issuance of the floodplain development permit; ii. Under the provisions of Indiana Code § 14-28-1 a permit for construction in a floodway from the Indiana Department of Natural Resources is required prior to the issuance of a local building permit for any excavation, deposit, construction, or obstruction activity located in the floodway. This includes land preparation activities such as filling, grading, clearing and paving, etc., undertaken before the actual start of construction of the structure. However, it does exclude non-substantial additions/improvements to existing (lawful) residences in a non-boundary river floodway. (Indiana Code § 14-28-1-26 allows construction of a non-substantial addition/improvement to a residence in a non-boundary river floodway without obtaining a permit for construction in the floodway from the Indiana Department of Natural Resources. Please note that if fill is needed to elevate an addition above the existing grade, prior approval for the fill is required from the Indiana Department of Natural Resources.) iii. No action shall be taken by the floodplain administrator until a permit or letter of authorization (when applicable) has been issued by the Indiana Department of Natural Resources granting approval for construction in the floodway. Once a permit for construction in a floodway or letter of authorization has been issued by the Indiana Department of Natural Resources, the floodplain administrator may issue the local floodplain development permit, provided the provisions contained in this UDO have been met. The floodplain development permit cannot be less restrictive than the permit for construction in a floodway issued by the Indiana Department of Natural Resources. iv. No development shall be allowed, which acting alone or in combination with existing or future development, will adversely affect the efficiency of, or unduly restrict the capacity of the floodway. This adverse effect is defined as an increase in the elevation of the regulatory flood of at least 0.15 of a foot as determined by comparing the regulatory flood elevation under the project condition to that under the natural or pre-floodway condition as proven with hydraulic analyses. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Duration. 1. Floodplain development permits shall be valid for a period of one hundred eighty days, as measured from the date on the certificate of zoning compliance or run concurrently with the building permit or other construction authorizations, whichever is longer. 2. At the written request of the petitioner, the City may extend the period one or more times for up to a maximum of an additional one hundred eighty days. The City may require additional erosion control measures as a condition of the extension if they are necessary to meet the requirements of this UDO. ii. Changes or Amendments. 1. The petitioner may submit revisions or amendments to an approved floodplain development permit for consideration by the local, state, and federal authorities having jurisdiction. A revision or amendment to an approved floodplain development permit shall only be authorized upon review and approval by all the local, state, and federal authorities having jurisdiction. 2. Changes to the floodplain development permit shall be approved in writing. iii. Construction Stage 1. Inspections Required. The floodplain administrator shall perform a minimum of three inspections to ensure that all applicable floodplain development requirements have been satisfied: a. The first upon the establishment of the flood protection grade reference mark at the development site; b. The second upon the establishment of the structure's footprint/establishment of the lowest floor; and c. The final inspection upon completion and submission of the required finished construction elevation certificate. Authorized City officials shall have the right to enter and inspect properties located in the SFHA. 2. Certification. a. Upon establishment of the lowest floor of an elevated structure or structure constructed on fill, it shall be the duty of the petitioner to submit to the floodplain administrator a certification of the NAVD 88 or NGVD elevation of the lowest floor, as built. Said certification shall be prepared by or under the direct supervision of a registered land surveyor, professional engineer or architect and certified by the same. The floodplain administrator shall review the lowest floor elevation survey data submitted. The petitioner shall correct deficiencies detected by such review before any further work is allowed to proceed. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. Any work undertaken prior to submission of the elevation certification shall be at the petitioner's risk. b. Upon establishment of the floodproofed elevation of a floodproofed structure, it shall be the duty of the petitioner to submit to the floodplain administrator a floodproofing certificate. Certification shall be prepared by or under the direct supervision of a registered professional engineer or architect and certified by same. The floodplain administrator shall review the floodproofing certification submitted. The applicant shall correct any deficiencies detected by such review before any further work is allowed to proceed. Failure to submit the floodproofing certification or failure to make correction required shall be cause to issue a stop-work order for the project. c. Upon completion of construction, an elevation certification (FEMA elevation certificate form 81-31 or any future updates) which depicts the "as-built" lowest floor elevation is required to be submitted to the floodplain administrator. If the project includes a floodproofing measure, floodproofing certification (FEMA floodproofing certificate form 81-65 or any future updates) is required to be submitted by the applicant to the floodplain administrator. 3. Stop Work Orders. a. Upon notice from the floodplain administrator, work on any building, structure or premises that is being done contrary to the provisions of this UDO shall immediately cease. b. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. iv. Revocation of Permits. 1. The floodplain administrator may revoke a permit or approval, issued under the provisions of this UDO, in cases where there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based. 2. The floodplain administrator may revoke a permit upon determination that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the structure for which the permit was issued is in violation of, or not in conformity with, the provisions of this UDO. (e) Site Development Permit. (1) Purpose. The site development permit procedure is intended to provide a mechanism to ensure compliance with this UDO by providing a thorough permitting and inspection process for all site development activities. (2) Applicability. No site development activity shall occur on platted or unplatted lands in any zoning district, unless a site development permit for such activity has been issued. (A) Exemptions. i. Site development activity on lots containing the uses: dwelling, single-family (attached); dwelling, single-family (detached); dwelling, duplex; dwelling, triplex; or dwelling, fourplex. ii. Site development activity containing only new buildings or changes, alterations, or additions to an existing building or site with no additional improvements required. iii. Site development activity containing only new signs, or changes, alterations, or additions to a sign. iv. Site development activity containing related to an approved temporary use. (3) Site Development Permit Review Process. Figure 06.05-6 identifies the applicable steps from 20.06.040 (Common Review Procedures) that apply to site development permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-6: Summary of Site Development Permit Procedure (A) Petition Submittal and Processing. The site development permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing) with the following modifications: i. Petition Submittal Requirements. The petition shall include, but not be limited to, the following documents: 1. Verification of site plan approval when such approval is required; 2. Construction plan including all proposed site improvements; 3. Topography of the site - proposed and existing two-foot contours; 4. Identification of environmental features, including but not limited to karst, water, trees, and steep slopes. (B) Staff Review and Action. The planning and transportation staff shall review the site development permit petition and approve, approve with conditions, or deny the petition within twenty working days of the receipt of a complete petition and all supportive documents in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in 20.06.040(d)(6)(B) (General Compliance Criteria) and the following specific approval criteria. i. Construction Plan. The construction plans shall include all required and proposed environmental protections including but not limited to: tree protection zones, easements and setbacks from environmental features and conservation areas; as well as all required and proposed site improvements. The requirements are further detailed in the Administrative Manual. ii. Planned Unit Development Approval. An approved final plan shall be in place prior to the issuance of a site development permit. iii. Stormwater Permit. If required by Title 13 (Stormwater) in the Bloomington Municipal Code, petitioner must submit an application for a stormwater management permit to the City of Bloomington Utilities Department at the time of application for the site development permit. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) shall apply with the following modifications: i. Duration. 1. Site development permits shall be valid for a period of one hundred eighty days, as measured from the date on the certificate of zoning compliance or run concurrently with the building permit or other construction authorizations, whichever is longer. 2. At the written request of the petitioner, the city may extend the period one or more times for up to a maximum of an additional one hundred eighty days. ii. Changes or Amendments. 1. The petitioner may submit revisions or amendments to an approved site development permit for consideration by the local, state, and federal authorities having jurisdiction. A revision or amendment to an approved site development permit shall only be authorized upon review and approval by all the local, state, and federal authorities having jurisdiction. 2. Changes to the site development permit shall be approved in writing. (f) Certificate of Zoning Compliance. (1) Purpose. The Certificate of Zoning Compliance procedure is intended to provide a mechanism for City staff to ensure that the establishment of and alterations to uses, sites, and structures conform to the standards of this UDO. (2) Applicability. (A) Generally. i. A Certificate of Zoning Compliance shall be required for any of the following activities: 1. Alteration, erection, construction, reconstruction, division, enlargement, demolition, partial demolition or moving of any building, structure, sign, or mobile home; 2. Establishment of a use or change in use to another use (see Section 20.06.090(c)(2) (Change in Use); 3. Enlargement in the area used for any use or relocation of a use to another portion of a lot, site, or building; 4. Site development, improvement, or other alteration of land, including paving or the establishment of drives or parking areas, or any other land distributing activity. 5. Tree removal requests that decrease the baseline canopy cover shall follow the procedures outlined in Section 20.06.050(a) (Site Plan Review), and shall comply with the requirements of Section 20.04.030(h) (Tree and Forest Preservation). 6. Any action that would result in partial or complete demolition of any exterior portion of a building or structure that is listed as "Outstanding," "Notable," or "Contributing" on the City of Bloomington Survey of Historic Sites and Structures as the same may be amended or replaced ("Historic Survey"). Such action shall be subject to the procedures outlined in Section 20.06.050(c) (Demolition Delay Permit). An accessory building or structure not attached to the principal building or structure upon the listed parcel shall not be considered "listed" within the meaning of this UDO unless the accessory building or structure is of the same era of construction as the principal building or structure, as determined by the staff. Such determination shall be based upon resources that may include but shall not be limited to Sanborn Company Fire Insurance maps, visual inspection of the accessory building or structure, and records and expertise of Historic Preservation Commission or its staff. ii. A single certificate of zoning compliance may be issued for a combination of such actions if they occur together. Any petition for a certificate of zoning compliance, permit, or other approval for an action described in subsection (A)i.6. above shall be subject to the procedures outlined in Section 20.06.050(c) (Demolition Delay Permit). (B) Exemptions. Activities involving the removal of dead, dying, or hazardous trees, or exotic, invasive vegetation, as verified by the Planning and Transportation Department, are exempt from receiving a certificate of zoning compliance, unless such removal decreases the baseline canopy cover. (3) Certificate of Zoning Compliance Review Process. Figure 06.05-7 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to certificate of zoning compliance review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-7: Summary of Certificate of Zoning Compliance Procedure (A) Petition Submittal and Processing. The certificate of zoning compliance petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (B) Staff Review and Action. The Planning and Transportation Director shall review the certificate of zoning compliance petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria). (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Expiration of Approval. Approval of a certificate of zoning compliance shall be effective for a maximum period of one year unless: 1. Construction under a valid site development permit or building permit has commenced and is ongoing; or 2. Upon petition, the Planning and Transportation Director grants an extension pursuant to Section 20.06.040(h)(1) (Expiration of Approval). (g) Certificate of Occupancy. (1) Purpose. The certificate of occupancy procedure is intended to provide a mechanism for City staff to ensure that the establishment of and alterations to uses, sites, and structures conform to the standards of this UDO. (2) Applicability. (A) Generally. A certificate of occupancy shall be obtained prior to a building or structure being occupied or used in each of the following situations, except for detached single-family dwellings: i. Occupancy or use of any new building or structure; ii. Re-use or re-occupancy of any existing building or structure that requires either a permit from the county building department or a certificate of zoning compliance from the Planning and Transportation Department; iii. Addition to any existing building or structure. Parts of the existing building or structure not included in the addition may continue to be occupied or used. (B) Certificate of Occupancy Required. If a certificate of occupancy is required pursuant to subsection (A) above, it is unlawful and a violation of this UDO for anyone to occupy or use a building or structure, or to cause, suffer or permit another to occupy or use a building or structure, until a temporary or final certificate of occupancy has been granted. Any violation of this provision shall be subject to a stop work order, mitigation, and/or fines and penalties as specified in Section 20.06.100 (Enforcement and Penalties). (3) Certificate of Occupancy Review Process. Figure 06.05-8 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to certificate of occupancy review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-8: Summary of Certificate of Occupancy Procedure (A) Petition Submittal and Processing. The certificate of occupancy petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (B) Staff Review and Action. i. Temporary Certificate of Occupancy. 1. For a recommendation for a temporary certificate of occupancy to be issued each of the following shall be successfully completed: a. Installation of required public and internal sidewalk improvements; b. Installation of required parking areas surfaced and striped, including installation of upright ADA signage; and c. Safe ingress and egress from all principal buildings. 2. All recommendations for a temporary certificate of occupancy are contingent upon approvals from the Monroe County Building Department, Monroe County Health Department, City of Bloomington Fire Department, City of Bloomington Housing and Neighborhood Development Department, City of Bloomington Engineering Department, and City utilities department, if applicable. 3. A recommendation for a final certificate of occupancy shall be obtained within six months of the date of the recommendation for the temporary certificate of occupancy. Due to weather or other circumstances, this period may be extended once for a period of up to six months at the discretion of the Planning and Transportation Director or designee. ii. Final Certificate of Occupancy. 1. For a recommendation for a final certificate of occupancy to be issued, the installation of all required site lighting, landscaping, and elevations as approved by the certificate of zoning compliance(s) shall be successfully completed. 2. All recommendations for a final certificate of occupancy are contingent upon approvals from the Monroe County Building Department, Monroe County Health Department, City of Bloomington Fire Department, City of Bloomington Housing and Neighborhood Development Department, City of Bloomington Engineering Department, and City utilities department, if applicable. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations shall be pursuant to Monroe County standards and procedures. (h) Certificate of Nonconforming Use. (1) Purpose and Applicability. A person who owns or operates a nonconforming use that has not been deemed abandoned pursuant to Section 20.06.090(c)(3) (Abandonment of a Nonconforming Use), may request a certificate of nonconforming use to protect the lawful nonconforming status. (2) Certificate of Nonconforming Use Review Process. Figure 06.05-10 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to certificate of nonconforming use review. Additions or modifications to the common review procedures are noted below. Figure 06.05-10: Summary of Certificate of Nonconforming Use Review Procedure [image omitted; see the official code] (A) Petition Submittal and Processing. The certificate of nonconforming use petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (B) Staff Review and Action. The Planning and Transportation Director shall review the certificate of nonconforming use petition, and shall approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria) and the following criteria: i. The petitioner shall demonstrate that the use is a lawful nonconforming use prior to the issuance of the certificate. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Effect of Approval. 1. A certificate of nonconforming use authorizes the continuation of an existing use of a property or building with any additional terms and conditions of the certificate and shall be valid as long as the use of the building or land remains in effect and is not abandoned. 2. The certificate of nonconforming use shall clearly state that the existing use of the building or property was legally established prior to the effective date of the current UDO. ii. Revocation of a Certificate of Nonconforming Use. 1. A certificate of nonconforming use may be revoked by the Planning and Transportation Director if the use of the property or building is inconsistent with the authorized use of the certificate of nonconforming use. 2. The Planning and Transportation Director shall notify the certificate holder in writing and provide thirty days from the date of the letter for the certificate holder to bring the use of the property into compliance with the certificate of nonconforming use, or the certificate shall be revoked. (i) Sign Permit. (1) Purpose. The sign permit procedure is intended to provide a mechanism for enforcement of the sign regulations of this UDO in order to: (A) Establish for all signs located on any premises a reasonable and impartial means to permit adequate communication; (B) Control confusing sign displays that present a hazard to pedestrians and motorists along streets; (C) Ensure light, air, and open space; (D) Protect the natural beauty and environment of the City; (E) Safeguard and enhance property values; (F) Protect public and private investment in buildings and open spaces; (G) Protect the public health, safety, and general welfare; and (H) Comply with all state and federal laws and case decisions of courts applicable to the City concerning freedom of expression. (2) Applicability. (A) Generally. i. Except as otherwise provided, no person shall erect any sign as defined in this UDO without first obtaining a sign permit from the Planning and Transportation Department. ii. The use requesting the sign permit shall be legally established on the property for which the signage is being requested. (B) Exemptions. Signs that are exempt from the sign permit requirement are specified in Section 20.04.100 (Signs). (3) Sign Permit Review Process. Figure 06.05-11 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to sign permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-11: Summary of Sign Permit Review Procedure (A) Petition Submittal and Processing. The sign permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (B) Staff Review and Action. i. The planning and transportation staff shall review the sign permit petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B) (General Compliance Criteria). ii. A staff decision on the petition shall be made within thirty days of receipt of a complete petition. iii. If a petition for a sign permit is denied, and the denial is appealed to the Board of Zoning Appeals pursuant to Section 20.06.080(d) (Administrative Appeal), the Board of Zoning Appeals shall make a decision on the appeal at the next regularly scheduled hearing. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Duration. The sign authorized by a sign permit shall be completed and erected within six months of the date of issuance; otherwise, the sign permit shall lapse and become null and void, unless good cause for an extension of time for completion is approved by the Planning and Transportation Director. ii. Extension. One extension of up to six months may be authorized by the Planning and Transportation Director for reason/cause. The petitioner shall submit the request for extension in writing to the Planning and Transportation Director, and the Planning and Transportation Director shall make a written determination regarding his or her decision to extend or deny extension. Both the request and the determination shall be made part of the sign permit record. iii. Changes or Amendments. When a sign permit has been issued, it shall be unlawful to change, modify, alter, or otherwise deviate from the terms and conditions of the sign permit without prior approval of the Planning and Transportation Director. When granted, a written record of such amendment shall be entered upon the original sign permit petition and maintained in the files of the Planning and Transportation Department. (j) Temporary Use Permit. (1) Purpose. The temporary use procedure is intended to provide a mechanism for enforcement of the temporary use regulations of this UDO, in order to allow short-term and minor deviations for uses which are temporary in nature, which will not adversely impact surrounding properties and land uses, and which can be terminated and removed at will. (2) Applicability. (A) Generally. A temporary use permit shall be required prior to the establishment of any temporary use, unless otherwise exempted in subsection (B) below. (B) Exemptions. The following uses are permitted and shall not be regulated as temporary uses under this UDO. i. Garage or yard sales, tent meetings, nonprofit events and political rallies, provided they meet the following standards: 1. The event is allowed for a maximum of seven consecutive days; 2. No property shall hold more than three such events in a single calendar year; and 3. The hours of operation of such events shall be limited to between the hours of seven a.m. and eleven p.m. ii. Temporary structures used for collection of donation items by a non-profit organization, provided they are displayed for a maximum of ninety days. iii. Any business activity licensed by Title 4 (Business Licenses and Regulations), of the Bloomington Municipal Code. (3) Temporary Use Permit Review Process. Figure 06.05-12 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to temporary use permit review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-12: Summary of Temporary Use Permit Review Procedure (A) Petition Submittal and Processing. The temporary use permit petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (B) Staff Review and Action. The planning and transportation staff shall review the temporary use permit petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6)(B)i. (Compliance with this UDO), and Section 20.03.030(h) (Temporary Uses). (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Temporary uses shall be terminated and removed at the end of the event period unless otherwise specified in Section 20.03.030(h) (Temporary Uses). ii. A temporary use permit may be granted only one time per year on any individual zoning lot and is nonrenewable. For purposes of this standard, fireworks, Halloween pumpkin, and Christmas tree sales are considered separate uses. (k) Easements. (1) Purpose. The purpose of this section is to outline the procedures for obtaining and recording easements, modifying platted or unplatted easements, terminating unplatted easements, and vacating platted easements and to ensure that the statutory requirements of the Indiana Code are met. (2) Applicability. This Section 20.06.050(l) (Easements) governs easements that are: (A) Required and/or granted pursuant to a provision of this UDO; (B) Permitted or required as a commitment; (C) Permitted or required as a condition of approval; or (D) Shown on a recorded plat. (3) Easement Review Process. Figure 06.05-13 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to easement review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.05-13: Summary of Easement Review Procedure (A) Petition Submittal and Processing. i. The easement petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). ii. Either the grantor or the grantee of an easement may apply to the approving body for modification of an easement. iii. Persons who own or hold an interest in a lot or lots adjacent to a platted easement may petition the Common Council for vacation of the easement in the manner outlined in Indiana Code § 36-7-3-12. iv. Any easement required by this UDO that is not included in a plat subject to Section 20.06.060 (Subdivision Procedures) shall comply with the procedure outlined in this Section 20.06.050(l) (Easements). (B) Staff Review and Action. i. Easements Not Required by Conditions or Commitments. The Planning and Transportation Director shall review the easement petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), if the Planning and Transportation Director determines that the proposed action complies with Section 20.06.040(d)(6)(B)iii. (Compliance with Utility, Service, and Improvement Standards), and those general standards for easements in Section 20.05.040(b) (General Standards) as applicable, and will not create significant adverse impacts on surrounding properties. ii. Easements Required by Conditions or Commitments. If the easement to be vacated was established as a result of a permitted or required commitment or condition of approval by the Plan Commission or Board of Zoning Appeals, the body that required the commitment or condition of approval shall approve both the easement vacation petition and the termination of the commitment or condition. The decision of that body shall be based on a determination as to whether the proposed action complies with Section 20.06.040(d)(6)(B)iii. (Compliance with Utility, Service, and Improvement Standards), and those general standards for easements in Section 20.05.040(b) (General Standards) as applicable, and will not create significant adverse impacts on surrounding properties. (C) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Form. Easement instruments shall be prepared in a recordable form acceptable to the City Legal Department. ii. Recording. Approved easement instruments shall be recorded in the county recorder's office. The original recorded easement shall be delivered to the grantee and a copy shall be delivered to the Planning and Transportation Department. iii. Covenants, Conditions, and Restrictions. Inclusion of language defining easements in an instrument creating covenants, conditions, and restrictions shall not be sufficient to create, modify, terminate, or vacate an easement. Easement instruments shall be independently recorded documents that may be modified, terminated, or vacated only as provided in this UDO. iv. Removal of Improvements. When applicable, the petitioner shall remove any improvements associated with the use of the easement prior to the termination of the easement. v. Time Limitation. If an easement modification or termination petition has been denied, the petitioner shall not file a new petition with the same or substantially similar request for a period of six months.

(Amd. of 1-14-2020; Ord. No. 20-07, § I(Att. B), 4-15-2020; Ord. No. 21-15, § II (Att. A), 4-21-2021; Ord. No. 21-20, § II (Att. A), 4-21-2021; Ord. No. 21-23, § II(Att. B), 6-14-2021; Ord. No. 22-11, § II(Art. A), 5-18-2022; Ord. No. 22-08, § II(Att. A), 5-18-2022; Ord. No. 23-04, § 2(Att. A), 4-19-2023; Ord. No. 23-07, § 2(Att. A), 4-19-2023; Ord. No. 2024-03, § II(Att. A), 4-10-2024; Ord. No. 2024-06, § II(Att. A), 4-10-2024; Ord. No. 2024-17, § II(Att. A), 9-18-2024; Ord. No. 2025-14, § II(Att. A), 5-21-2025; Ord. No. 2026-08, § 2(Att. A), 5-20-2026; Ord. No. 2026-10, § 2(Att. A), 5-20-2026)

Ask a question about Bloomington law

Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.