20.06.070 - Plan and ordinance amendments.
(a) Comprehensive Plan Amendment. The following procedure is established for review and amendment of the Comprehensive Plan. (1) The Plan Commission may recommend, and the Common Council may determine the appropriate interval for a review, but such review should be conducted once every four years. (2) Amendments to the Comprehensive Plan shall proceed pursuant to Indiana Code § 36-7-4, Series 500. (b) Zoning Map Amendment. (1) Purpose. The zoning map amendment procedure is intended to provide a mechanism for the City to consider a petition for the rezoning of real property within the jurisdictional area of the Plan Commission and to ensure that the statutory requirements established in the Indiana Code for the zoning of real property are met. (2) Applicability. The zoning map amendment procedure applies to all proposals requesting to change the zoning district classification of a parcel of real property to a different zoning district classification. This procedure does not include changing the zoning classification of a parcel to a Planned Unit Development, which is governed by Section 20.06.070(c) (Rezoning to Planned Unit Development). (3) Zoning Map Amendment Review Process. Figure 06.07-1 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to zoning map amendment review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.07-1: Summary of Zoning Map Amendment Procedure (A) Pre-Submittal Activities. i. A pre-submittal meeting shall be held in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). ii. A development review committee meeting shall be held in accordance with Section 20.06.040(b)(2) (Development Review Committee (DRC) Meeting). iii. A pre-submittal neighborhood meeting shall be held in accordance with Section 20.06.040(b)(3) (Pre-Submittal Neighborhood Meeting). (B) Petition Submittal and Processing. The zoning map amendment petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing). (C) Staff Review and Action. The planning and transportation staff shall review the petition and prepare a staff report and recommendation in accordance with Section 20.06.040(d) (Staff Review and Action). (D) Scheduling and Notice of Public Hearings. i. The zoning map amendment petition shall be scheduled for a public hearing before the Plan Commission and Common Council, and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings). ii. Mailed notice shall not be required if the Plan Commission or Common Council initiate a petition to repeal and replace the zone maps for all or substantially all of the City. (E) Review and Decision. i. Plan Commission Review and Recommendation. 1. The Plan Commission shall review the zoning map amendment petition and shall forward its recommendation to the Common Council in accordance with Section 20.06.040(g) (Review and Decision), based on the approval criteria in Section 20.06.040(d)(6) (Approval Criteria) and the following specific approval criteria: a. The recommendations of the Comprehensive Plan; b. Current conditions and character of structures and uses in each zoning district; c. The most desirable use for which the land in each zoning district is adapted; d. The conservation of sensitive environmental features; e. The conservation of property values throughout the jurisdiction; and f. Responsible development and growth. 2. The Plan Commission shall forward the petition to the Common Council with: a. A favorable recommendation; b. A favorable recommendation with conditions and/or commitments; c. A negative recommendation; d. No recommendation; or e. Continue the petition to a definite future meeting date. 3. If the petition has not been continued, the Plan Commission shall certify and forward the petition to the Common Council. ii. Common Council Review and Decision. 1. The Common Council shall act on the petition within ninety days of certification by the Plan Commission in accordance with Indiana Code § 36-7-4-608. 2. Commitments may be allowed or required as part of a proposal to amend the zoning map under Indiana Code § 36-7-4-608 and this UDO. (F) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Effect of Approval of the Amendment. 1. When an amendment of the Official Zoning Map is approved, such amendment shall be incorporated into the Official Zoning Map in the geographic information system maintained by the City. 2. For zoning map amendments located adjacent to public streets, all required right-of-way shall be dedicated in compliance with the Transportation Plan. Such dedication shall take place within one hundred eighty days of approval of the zoning map amendment. The one-hundred-eighty-day time limit may be extended by the Planning and Transportation Director, but not unless the requirement is clearly specified in a recordable zoning commitment approved by the City. ii. Automatic Termination of Commitments. A commitment made in connection with a zoning map amendment approval terminates automatically if, after adoption of the petition, the zoning district applicable to the area involved in the proposal is changed. (c) Rezoning to Planned Unit Development (PUD). (1) Purpose. The rezoning to a Planned Unit Development (PUD) procedure is established to achieve the purposes of Section 20.02.050 (Planned Unit Development (PUD) District) and to ensure that the statutory requirements established in the Indiana Code § 36-7-4-1500 et seq. are met. The PUD procedure shall not be used when a Conditional Use permit, variance, minor modification, or rezoning to an existing base zoning district could achieve a similar result. (2) Applicability. (A) This procedure applies to new Planned Unit Development (PUD) proposals, and to any proposed amendment to an existing Planned Unit Development that would affect either the text of the PUD district ordinance or the general layout of any element of the preliminary plan, and that does not qualify for approval pursuant to Section 20.06.080(a) (Minor Modification). (B) Any property owner in a district other than the MD district may propose a PUD zoning district in accordance with these procedures. A parcel proposed for a PUD is not required to be under single ownership. However, if not under single ownership, the multiple owners must all consent to the development of their individual properties consistent with the requirements of the proposed PUD district ordinance. Any transfer of land within the development resulting in ownership within the development by two or more parties after an application has been filed shall not alter the applicability of the regulations contained in the UDO. An approved preliminary plan shall be binding upon the petitioner, their successors and assigns and shall limit and control the issuance and validity of all certificates of zoning compliance. (C) All applications that involve subdivision of a parcel shall also be subject to the subdivision procedures established by Chapter 20.06 (Administration and Procedures). (3) Rezoning to Planned Unit Development (PUD) Review Process. Figure 06.07-2 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to rezoning to Planned Unit Development (PUD) review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.07-2: Summary of Rezoning to Planned Unit Development (PUD) Procedure (A) Pre-Submittal Activities. i. A pre-submittal meeting shall be held in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). ii. A development review committee meeting shall be held in accordance with Section 20.06.040(b)(2) (Development Review Committee (DRC) Meeting). iii. A pre-submittal neighborhood meeting shall be held in accordance with Section 20.06.040(b)(3) (Pre-Submittal Neighborhood Meeting). (B) Petition Submittal and Processing. A petition for rezoning to a Planned Unit Development (PUD) petition shall be submitted, accepted, and revised, and may be withdrawn, in accordance with Section 20.06.040(c) (Petition Submittal and Processing), with the following modifications: i. PUD Plan Required. 1. A petition for rezoning to a PUD shall include all submittal requirements as specified by the Planning and Transportation Director or required by the administrative manual. 2. A preliminary PUD plan and then a final PUD plan is required, unless the Planning and Transportation Director determines that the proposed divergence from UDO standards is so minor that only a final PUD plan is needed. 3. The preliminary plan shall include the conceptual location of all required improvements. Approval of the PUD plan is required prior to approval of a development permit in a PUD district. ii. PUD Plan Contents. The submittal requirements and specifications for the PUD plan shall be established in the administrative manual. iii. Petition. A petition for a Planned Unit Development shall not be considered complete until all information and documentation required by this subsection and the administrative manual has been submitted and all meetings required by Section 20.06.070(c)(3) (Rezoning to Planned Unit Development (PUD) Review Process) have been completed. (C) Staff Review and Action. i. PUD District Ordinance and Preliminary Plan. The Planning and Transportation Director shall review the petition and prepare a staff report and recommendation in accordance with Section 20.06.040(d) (Staff Review and Action). ii. Final Plan. 1. The Plan Commission may, by rule, delegate to staff authority to review final plans. If authority is delegated to staff, the Planning and Transportation Director shall review the petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6) (Approval Criteria) and the specific approval criteria in Section 20.06.070(c)(4) (Approval Criteria for Rezoning to a Planned Unit Development (PUD) District). 2. Staff may allow or require the owner to make a written commitment and shall have all powers and duties of the Plan Commission under this section except the power to approve modification or termination of a commitment. 3. Minor Deviations from Preliminary Plan. If the Planning and Transportation Director finds the final plan proposes minor deviations from the approved preliminary plan that do not require a PUD district ordinance amendment or a preliminary plan amendment pursuant to Section 20.06.070(c)(3)(E)i. (Preliminary Plan), and that do not change the concept or intent of the development, he or she may review and approve or deny the final plan without public notice or a public hearing, as authorized by rule of the Plan Commission. The Planning and Transportation Director's decision is subject to appeal under Section 20.06.070(c)(3)(E)ii.4. (Appeal to Plan Commission). 4. Determination that Amendment is Required. a. If the Planning and Transportation Director finds the final plan proposes changes to the approved PUD district ordinance, or deviations from the approved preliminary plan that require a preliminary plan amendment pursuant to Section 20.06.070(c)(3)(E)i. (Preliminary Plan), he or she shall not approve the final plan, but shall notify the petitioner that a PUD amendment is required pursuant to the procedures for approval of a new PUD district ordinance or preliminary plan. b. If the petitioner disagrees with the Planning and Transportation Director's determination, he or she may request that the Plan Commission review the final plan and determine whether such amendment is required. Such request shall be submitted in writing to the Planning and Transportation Department not later than fourteen days after the Planning and Transportation Director's determination is made. c. The Plan Commission procedure upon such review shall be the same as for an appeal under Section 20.06.070(c)(3)(E)ii.4. (Appeal to Plan Commission). If the Plan Commission determines that no amendment to the PUD district ordinance or preliminary plan is required, the Plan Commission shall review and act upon the final plan. In this case, the Plan Commission decision shall be final and appealable pursuant to Indiana Code § 36-7-4-1016. d. If the Plan Commission determines that an amendment is required pursuant to Section 20.06.070(c)(3)(E)ii.4. (Appeal to Plan Commission), the Plan Commission shall review the proposal as a PUD amendment petition and shall forward a recommendation to the Common Council, pursuant to the procedures for approval of a new PUD district ordinance or preliminary plan. iii. Scheduling and Notice of Public Hearings. 1. PUD District Ordinance and Preliminary Plan. The rezoning to a Planned Unit Development (PUD) petition shall be scheduled for a public hearing before the Plan Commission and Common Council, and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings). 2. Final Plan. The final plan petition shall be scheduled for a public hearing before the Plan Commission, and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings) when: a. The Plan Commission recommends denial of the PUD district ordinance and preliminary plan; or b. The Plan Commission provides no recommendation on the PUD district ordinance and preliminary plan and the Common Council approves the PUD district ordinance and preliminary plan. (D) Review and Decision. i. PUD District Ordinance and Preliminary Plan. 1. Plan Commission Review and Recommendation. The Plan Commission shall review the rezoning to a Planned Unit Development (PUD) petition and shall forward its recommendation to the Common Council in accordance with Section 20.06.040(g) (Review and Decision), based on the general approval criteria in Section 20.06.040(d)(6) (Approval Criteria) and the specific approval criteria in Section 20.06.070(c)(4) (Approval Criteria for Rezoning to a Planned Unit Development (PUD) District) below. a. The Plan Commission shall forward the petition to the Common Council with: i. A favorable recommendation; ii. A favorable recommendation with conditions and/or commitments; iii. A negative recommendation; iv. No recommendation; or v. Continue the petition to a definite future meeting date. b. If the petition has not been continued, the Plan Commission shall certify and forward the petition to the Common Council. 2. Changes by Plan Commission. a. The Plan Commission may vote to favorably recommend a proposal with changes to the PUD district ordinance or to the preliminary plan if the petitioner agrees in writing to the changes. If the petitioner is unable to respond to the proposed changes prior to the vote, then such motion and vote shall be: either for favorable recommendation, with the changes, contingent upon the petitioner's acceptance of the changes in writing within ten days of the Plan Commission's approval, or, in the alternative, if the petitioner fails to accept the changes in writing within said specified time, the Plan Commission's motion and vote shall be to continue the petition to the next Plan Commission meeting. b. The Plan Commission shall permit the petitioner to comment upon changes to the PUD district ordinance or to the preliminary plan made by the Plan Commission after a motion to approve with changes is made but prior to the vote, and the Plan Commission may amend its motion accordingly. 3. Revisions. Following Plan Commission approval, the petitioner shall submit revised copies of the PUD district ordinance and preliminary plan that address the comments, concerns, and conditions of approval of the Plan Commission. The petitioner shall refer to the petition form to determine the format and number of copies of the revised plans to deliver to the Planning and Transportation Department. 4. Common Council Review and Decision. a. The Common Council shall vote on the proposal within ninety days after the Plan Commission certifies the proposal in accordance with Indiana Code § 36-7-4-608. b. If the Plan Commission has given the proposal a favorable recommendation and the Common Council fails to act on the proposal within ninety days, the ordinance codified in this chapter takes effect as if it had been adopted (as certified) ninety days after certification. c. If the Plan Commission has failed to make a recommendation or has given the proposal an unfavorable recommendation and the Common Council fails to act on the proposal within ninety days, the proposal is defeated. d. The Common Council may adopt or reject the proposal and may also exercise powers set forth under the Indiana Code § 36-7-4-1500 Series and this section. Those powers include imposing reasonable conditions, conditioning the issuance of a certificate of zoning compliance on bonds or certain guarantees, and allowing or requiring the owner of real property to make written commitments under Indiana Code § 36-7-4-608. ii. Final Plan. When the Plan Commission is the final review authority for a final plan, the Plan Commission shall review the petition and approve, approve with conditions, or deny the petition in accordance with Section 20.06.040(d) (Staff Review and Action), based on the general approval criteria in Section 20.06.040(d)(6) (Approval Criteria) and the specific approval criteria in Section 20.06.070(c)(4) (Approval Criteria for Rezoning to a Planned Unit Development (PUD) District). (E) Post-Decision Actions and Limitations. Post-decision actions and limitations in Section 20.06.040(h) (Post-Decision Actions and Limitations) shall apply with the following modifications: i. Preliminary Plan. 1. Effect of Approval. a. When a PUD district ordinance and preliminary plan for a Planned Unit Development have been approved by the Common Council, the PUD district ordinance and preliminary plan shall become effective and its location shall be shown on the Official Zoning Map. The Official Zoning Map shall be amended to designate the site as a PUD zoning district. b. For PUDs located adjacent to existing public streets, all required right-of-way for such public streets shall be dedicated in compliance with the Transportation Plan. Such dedication shall take place within one hundred eighty days of approval of the PUD district ordinance. The one-hundred-eighty-day time limit may be extended by the Planning and Transportation Director, but not unless the requirement is clearly specified in a recordable zoning commitment approved by the City. c. Upon such amendment of the zoning map, the use and development of the site shall be governed by the PUD district ordinance and preliminary plan, subject to approval of a final plan. d. No permit of any kind shall be issued until the final plan has been approved. 2. Duration. a. Abandonment. The preliminary plan shall be considered abandoned if, three years after the approval of the preliminary plan by the Common Council, no final plan approval has been granted for any section of the Planned Unit Development. In such cases, the Plan Commission shall determine if the preliminary plan should be extended for a period up to a maximum of one hundred eighty days. If no extension is sought for the Planned Unit Development, and the three-year period since Common Council approval has elapsed, the Plan Commission may initiate a proposal to rezone the area designated as a Planned Unit Development to an appropriate zoning district. Any such rezoning shall follow the process provided in Section 20.06.070(b) (Zoning Map Amendment). The owner or owners of any property proposed to be rezoned by the Plan Commission under the provisions of this subsection shall be notified at least twenty-one days in advance of the Plan Commission public hearing on the proposed rezoning. b. Review. If, ten years after the approval of the preliminary plan by the Common Council, final plan approval has been granted for one or more sections of the Planned Unit Development, but sections of the Planned Unit Development remain without approved final plans, the Plan Commission may, on its own initiative, make a recommendation to the Common Council to rezone those portions of the Planned Unit Development that do not have approved final plans to an appropriate zoning district. 3. Changes or Amendments. a. PUD District Ordinance. Amendments to the PUD district ordinance shall follow the procedure for creating a new PUD district ordinance pursuant to this Section 20.06.070(c) (Rezoning to Planned Unit Development (PUD)). b. Preliminary Plan. To the extent that a preliminary plan is a conceptual and general rendering of a proposed development conforming to the PUD district ordinance, a final plan may deviate from the approved preliminary plan in some respects without necessitating an amendment to the preliminary plan. However, any deviation from an approved preliminary plan that alters the concept or intent of the Planned Unit Development shall be subject to the procedure for approval of a new preliminary plan. The Plan Commission may require that a petition for preliminary plan amendment encompass the entire Planned Unit Development. Deviations that require a preliminary plan amendment include, but are not limited to, the following: i. Changes in the location, proportion or allocation of uses, or changes to the types of uses allowed; ii. Increases in residential density; iii. More than a ten percent change to the proportion of housing types; iv. Substantial increase in the building envelope; v. More than a one percent reduction of proposed open space; vi. Changes in functional uses of open space, where such change constitutes an intensification of open space usage; vii. Substantial change in the ratio of off-street parking spaces to use; viii. Substantial changes in standards, continuity, or general location of roads, utilities, or stormwater management features; or ix. Substantive changes in the covenants, conditions and restrictions, or other governing agreements, that affect any matter regulated by this UDO. ii. Final Plan. 1. Effect of Approval. a. No permit of any kind shall be issued for any purpose within a Planned Unit Development zoning district except in accordance with the approved final plan. Any material deviation from the final plan is subject to appropriate enforcement action. b. No permit of any kind shall be issued until the final plan has been approved. 2. Duration. a. Abandonment. The final plan shall be considered abandoned if no site development permits or building permits have been obtained and are still valid for the area contained in the final plan within three years after final plan approval has been granted, or if such permits have been obtained but are no longer valid per the terms of this UDO. b. Extension. An extension, not to exceed twelve months, may be granted by the Plan Commission for good cause shown. The Plan Commission may grant one twelve-month extension. 3. Changes or Amendments. a. Minor Changes. The Planning and Transportation Director may approve minor changes to an approved final plan, if the changes do not change the concept or intent of the development, without a public hearing or public notice as authorized by rule of the Plan Commission. Such decisions shall be subject to appeal pursuant to Section 20.06.070(c)(3)(E)ii.4. (Appeal to the Plan Commission). This shall include the following: i. Minor changes in the location and siting of buildings and structures; ii. Changes in height of less than one story, but not over eight feet in any case; iii. Minor changes to an approved landscape plan that do not alter the general concept or screening effectiveness of the landscaping; iv. Minor changes to the internal street system and off-street parking areas; v. Changes in the exact type of use in any particular location within the development, as long as the type of use is allowed by the PUD district ordinance and preliminary plan in that general location; and vi. Changes of less than ten percent of the gross floor area of an approved building. b. Major Changes. The following changes shall require a new final plan, provided that this subsection b. shall not be interpreted to allow any change that would otherwise require an amendment to the PUD district ordinance and/or the preliminary plan: i. Changes in lot arrangement, or addition of buildable lots which do not change approved density of the development; ii. Changes in site design requirements, such as location or design of required landscaping, signage, building heights or footprints, setbacks, encroachment into areas slated for preservation under any of the sections of Section 20.04.030 (Environment), or other such development or design standards in the PUD district ordinance; iii. Changes in access to the development site, where such change amounts to an intensification of traffic patterns on roadways; and/or iv. Any reduction in aesthetic treatment. 4. Appeal to Plan Commission. Interested parties, as defined in Section 20.06.040(e)(2)(D) (Notice to Interested Parties), affected by the decision of the Planning and Transportation Director upon review of a final plan may within ten days of such decision request that the Plan Commission review the Planning and Transportation Director decision. Such request shall be in writing and shall specify the grounds of the appeal. A public hearing shall be required with notice pursuant to the Plan Commission rules of procedure. The Plan Commission may affirm, reverse, or modify the Planning and Transportation Director decision. 5. Revisions. Following final approval, the petitioner shall submit revised copies of the final plan that address the comments and concerns of the staff. The petitioner shall refer to the final plan petition form to determine the format and number of copies of the revised plans to deliver to the Planning and Transportation Department. iii. Automatic Termination of Commitments. A commitment made in connection with the adoption of a PUD district ordinance or PUD final plan approval terminates automatically if, after adoption of the petition, the zoning district applicable to the area involved in the proposal is changed. (4) Approval Criteria for Rezoning to a Planned Unit Development (PUD) District. The Plan Commission and Common Council shall only approve a petition for rezoning to a PUD district if they determine that the petition: (A) Is consistent with the purpose of this UDO and the purpose of Section 20.02.050 (Planned Unit Development (PUD) District); and (B) The petitioner has demonstrated that the proposed rezoning is compatible with surrounding development or can be made compatible with surrounding development through commitments or conditions; and (C) Any portion of the PUD zoning district to be occupied by multifamily, mixed-use, or industrial development shall provide a greater level of internal connectivity and connectivity to surrounding developments than would be required by this UDO if the project were not being developed in a PUD zoning district; and (D) Each multifamily, mixed-use, or nonresidential principal structure in the PUD zoning district shall provide a greater level of design quality than would be required by this UDO if the project were not being developed in a PUD zoning district; and (E) At least one of the following criteria are met: i. The proposed PUD zoning district will include construction of a substantial open space, recreational, entertainment, or cultural amenity that will be open to and usable by the general public, and that would not otherwise be required by this UDO. Reconfiguration of open space required by this UDO does not satisfy these criteria; ii. The proposed PUD zoning district will protect a significant ecological, natural, historical, architectural, or archeological resource that was not already protected from development by this UDO or by state or federal law. Avoidance of designated floodplains or wetland areas, or the provision of additional buffers around such areas, does not satisfy these criteria; or iii. The proposed PUD zoning district provides affordable housing beyond the amounts that the petitioner would have been required to provide in order to earn a tier 1 or tier 2 affordable housing incentive under Section 20.04.110(c)(5) (Affordable Housing Incentives) by either: 1. Income-restricting at least ten percent more of the dwelling units at or below the income levels required to earn a tier 1 or tier 2 incentive; or 2. Income restricting the same number of dwelling units required to earn a tier 1 or tier 2 affordable housing incentive, but limiting incomes to at least ten percent lower AMI level than would have been required to earn a tier 1 or tier 2 incentive under Section 20.04.110(c)(5) (Affordable Housing Incentives). (5) Changes to an Approved PUD District. (A) Changes to the UDO that directly affect public health and safety shall apply to any PUD even if such changes are adopted during the PUD build-out. (B) To the extent permitted by Section 20.01.040(b) (Effect of Change in the Law After Filing of Complete Petition), changes to the UDO that alter any development standards for which the PUD district ordinance is silent shall apply to portions of the PUD for which an approved site plan has not been approved before the date of the UDO change. (C) To the extent permitted by Section 20.01.040(b) (Effect of Change in the Law After Filing of Complete Petition), if a PUD is no longer proceeding in accordance with its PUD district ordinance, commitments, or time requirements imposed through the procedures in this Section 20.06.070(c) (Rezoning to Planned Unit Development (PUD)) or by agreement, amendments to the UDO may be applied to portions of the PUD for which an approved site plan has not been approved before the date of the UDO change. (D) After at least ninety-five percent of a PUD has been built-out, the PUD may be subject to being rezoned into an appropriate standard zoning district pursuant to Section 20.06.070(b) (Zoning Map Amendment). (d) Zoning Text Amendment. (1) Purpose. The zoning text amendment procedure is intended to provide a mechanism for the City to consider a petition for an amendment to the text of this UDO and to ensure that the statutory requirements established in the Indiana Code for amending the ordinance text are met. (2) Applicability. The zoning text amendment procedure applies to all proposals requesting to change the text of this UDO. (3) Zoning Text Amendment Review Process. Figure 06.07-3 identifies the applicable steps from Section 20.06.040 (Common Review Procedures) that apply to zoning text amendment review. Additions or modifications to the common review procedures are noted below. [image omitted; see the official code] Figure 06.07-3: Summary of Zoning Text Amendment Procedure (A) Pre-Submittal Activities. A pre-submittal meeting shall be held in accordance with Section 20.06.040(b)(1) (Pre-Submittal Meeting). (B) Petition Submittal and Processing. i. Only the members of the Common Council or the Plan Commission shall have standing to initiate a proposal to amend the text of this UDO. ii. The staff shall prepare the proposal upon the direction of either the Plan Commission or the Common Council. The staff shall prepare the proposal so that it is consistent with Indiana Code § 36-7-4-601. (C) Staff Review and Action. The Planning and Transportation Director shall review the petition and prepare a staff report and recommendation in accordance with Section 20.06.040(d) (Staff Review and Action). (D) Scheduling and Notice of Public Hearings. Within sixty days of initiating a proposal to amend the text of this UDO or of receiving a proposal from the Common Council, the zoning text amendment petition shall be scheduled for a public hearing before the Plan Commission and Common Council, and noticed in accordance with Section 20.06.040(e) (Scheduling and Notice of Public Hearings). (E) Review and Decision. i. Plan Commission Review and Recommendation. The Plan Commission shall review the zoning text amendment petition and shall forward its recommendation to the Common Council in accordance with Section 20.06.040(g) (Review and Decision), based on the specific approval criteria in Section 20.06.070(d)(4) (Approval Criteria for Zoning Text Amendment). 1. The Plan Commission shall certify and forward the proposal to the Common Council with: a. A favorable recommendation; b. A negative recommendation; c. No recommendation; or d. Continue the proposal to a definite future meeting date. ii. Common Council Review and Decision. The Common Council shall vote on the proposal within ninety days of certification by the Plan Commission in accordance with Indiana Code § 36-7-4-607.5, which governs whether the proposal is adopted or defeated. (F) Post-Decision Actions and Limitations. If the proposal is adopted by the Common Council pursuant to Indiana Code § 36-7-4-607, the Plan Commission shall arrange for the inclusion of the amended text in this UDO printed by the City. (4) Approval Criteria for Zoning Text Amendment. In reviewing the proposal, the Plan Commission and Common Council shall pay reasonable regard to: (A) The Comprehensive Plan; (B) Current conditions and the character of current structures and uses in each zoning district; (C) The most desirable use of land in each zoning district; (D) The conservation of sensitive environmental features; (E) The conservation of property values throughout the jurisdiction; and (F) Responsible development and growth.
(Amd. of 1-14-2020; Ord. No. 23-07, § 2(Att. A), 4-19-2023; Ord. No. 2024-17, § II(Att. A), 9-18-2024; Ord. No. 2026-08, § 2(Att. A), 5-20-2026; Ord. No. 2026-10, § 2(Att. A), 5-20-2026)
Ask a question about Bloomington law
Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.