§ 13.10.150 — Soil absorption trench requirements

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 13.10.150

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/71646f47-5179-4abd-a1ac-1be2f74f2eb6

§ 13.10.150: Soil absorption trench requirements.

(A) Location of the disposal field should be in an unobstructed and unshaded area, and the following distances shall be the minimum distance at which the disposal field can be located from the following areas: (1) Any private water supply, 50 feet. (2) Streams, 25 feet. (3) Dwellings, 10 feet. (4) Property lines, 10 feet. (B) When existing wells are involved or exceptionally coarse soil formations are encountered, the 50-foot distance from any water supply shall be increased in accordance with the recommendations of the Evansville-Vanderburgh County Health Department. The 10-foot distance from property lines may be reduced to five feet where proper drainage conditions exist or where the Health Department deems it necessary. (C) The minimum absorption area (the total flat area bottom of trenches) of the disposal field shall be determined from the results of actual percolation tests, as described in EMC § 13.10.030(C), conducted on the site, with the required area determined from Table I in EMC § 13.10.030(C). All systems shall be designed to handle the sewage waste from automatic clothes washers. In no case will less than 300 lineal feet of absorption system per single-family residence be provided. (D) Construction of disposal trenches in filled ground is not acceptable. All trenches in the disposal field shall be the same width and the following standards shall be required: (1) Minimum number of lines per field, two. (2) Maximum length of individual lines, 100 feet. (3) Preferred maximum length of individual lines, 50 feet. (4) Minimum bottom width of trench, 18 inches. (5) Maximum bottom width of trench, 24 inches. (6) A 36-inch trench may be permitted on lots where the space is limited, but approval must be granted by the Health Department before construction takes place. The minimum space between trenches must be nine feet on center. (7) Maximum depth of cover of tile lines, 18 inches. (8) Minimum depth of aggregate in trench, 15 inches. (9) Maximum grade of tile lines, two inches per 50 feet. (10) Minimum space of trenches, six feet on center. (11) Minimum aggregate under tile, eight inches. (12) Minimum aggregate over tile, two inches. (13) Minimum size of tile, four inches inside diameter. (E) Pipe used for the line between the septic tank and distribution box, on all lines within 10 feet of the dwelling, under paved areas, and on all main laterals from the distribution box, shall be of vitrified clay or cast iron with watertight joints. Pipe used under driveways or other areas subject to heavy loads shall be bell and spigot cast iron with leaded joints. The sections laid in the disposal field shall not be considered in determining the effective absorptive area. Pipe used in the disposal field shall be not less than four inches in diameter. It shall be laid with one-fourth-inch open joints. (F) Filter material shall be gravel or similar material having sufficient voids. The material may vary from one-half to two and one-half inches in size and shall be free of dust, sand, or clay. The filter material must be covered with a six-inch layer of uncompacted straw, and it shall completely encase the tile in accordance with subsection (D) of this section.

( 1962 Code § 1731.16 ; Ord. G-64-8 , passed 7-6-1964 ; 1982 Code § 51.15 ; 1983 Code § 5.51.15 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.