§ 13.20.130: Permit application.

Industrial users shall complete and file with the City a permit application in the form which the City prescribed on the effective date of the ordinance codified in this chapter. Existing industrial users discharging wastewater into the POTW prior to the effective date of the ordinance codified in this chapter and who wish to continue such discharges in the future shall apply for a wastewater discharge permit within 120 days after the effective date of the ordinance codified in this chapter, and proposed new users shall apply at least 120 days prior to connection to the wastewater treatment plant. In order to be considered for a discharge permit, all industrial users required to have a permit must submit the following information on an application form: (A) Name and address of the facility including the names of the operator and owners. (B) Standard Industrial Classification (SIC) code of both the industry as a whole and any processes for which Federal categorical standards have been promulgated. (C) Expected, or actual if already discharging, wastewater constituents and characteristics including any pollutants in the discharge, which are limited by any Federal, State, or local standards. Sampling and analysis will be undertaken in accordance with 40 CFR Part 136. Where the pretreatment standards require compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard. (D) Time and duration of the discharges. (E) Daily maximum, daily average, and monthly average wastewater flow rates, including daily, monthly, and seasonal variations, if any. (F) Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemicals used at the facility which are or could accidentally or intentionally be discharged to the POTW. (G) The site plans, floor plans and mechanical and plumbing plans and details to show all sewers, floor drains, and appurtenances by size, location and elevation. A sampling sewer site meeting the requirements of EMC § 13.20.260 and representing 100 percent of the industrial user's regulated discharge shall be provided. (H) Each product produced by type, amount, process or processes and rate of production. (I) Type and amount of raw materials processed (average and maximum per day). (J) Number and type of employees, and hours of operation, proposed or actual hours of operation of the pretreatment system. (K) Whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet all applicable Federal, State, and local standards. If additional pretreatment and/or O&M will be required to meet the standards, then the industrial user shall indicate the shortest time schedule necessary to accomplish installation or adoption of such additional treatment and/or O&M. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standards. The following conditions apply to this schedule: (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include hiring an engineer, completing preliminary plans, completing final plans, executing contracts for major components, commencing construction, completing construction, beginning operation, and conducting routine operation). No increment shall exceed nine months, nor shall the total compliance period exceed 18 months. (2) No later than 14 days following each date in the schedule, the user shall submit a progress report to the control authority including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule. In no event shall more than nine months elapse between such progress reports. (3) All schedules are subject to review, revision, and approval of the control authority. (L) Any other information as may be deemed by the control authority to be necessary to evaluate the permit application. (M) All wastewater discharge permit applications, user reports and certification statements must be signed by a responsible corporate officer or a duly authorized representative of the user and contain the following certification statement in accordance with subsection (M)(1), (2), (3), (4) or (5) of this section: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations. (1) By a responsible corporate officer, if the industrial user submitting the reports is a corporation. For the purpose of this subsection, a “responsible corporate officer” means: (a) A president, treasurer, or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or (b) The manager of one or more manufacturing, production, or operation facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25,000,000 (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) By a general partner or proprietor if the industrial user submitting the reports is a partnership or sole proprietorship respectively. (3) The principal executive officer or director having responsibility for the overall operation of the discharging facility if the industrial user submitting the reports is a Federal, State, or local governmental entity. (4) The principal executive officer or director of a limited liability company or any other business entity not listed therein. (5) By a duly authorized representative of the individual designated in subsection (M)(1), (2), (3) or (4) of this section if: (a) The authorization is made in writing by the individual described in subsection (M)(1), (2), (3) or (4) of this section; (b) The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and (c) The written authorization is submitted to the control authority. (6) If an authorization under subsection (M)(5) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of subsection (M)(5) of this section must be submitted to the control authority prior to or together with any reports to be signed by an authorized representative. The control authority will evaluate the data furnished by the industrial user and may require additional information. Within 30 days after full evaluation of the data furnished, the control authority may issue an industrial user's discharge permit subject to terms and conditions provided herein.

( 1982 Code § 53.047 ; 1983 Code § 5.53.047 ; Ord. F-84-35 , passed 6-25-1984 ; Ord. G-96-9 , passed 7-8-1996 ; Ord. G-2012-12 , passed 7-25-2012 ; Ord. G-2019-9 , passed 7-10-2019 )