§ 13.20.280 — Inspection and sampling
Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 13.20.280
Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/e79e46e2-0360-497d-bc64-caede0006084
§ 13.20.280: Inspection and sampling.
(A) The control authority shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this chapter and any individual wastewater discharge permit or order issued hereunder. Users shall allow the control authority ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (1) Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the control authority shall be permitted to enter without delay for the purposes of performing specific responsibilities. (2) The control authority shall have the right to set up on the user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations. (3) The control authority may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated to ensure their accuracy. (4) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the control authority and shall not be replaced. The costs of clearing such access shall be borne by the user. (5) Unreasonable delays in allowing the control authority access to the user's premises shall be a violation of this chapter. (B) The inspection and sampling of the individual industries will entail the following: (1) Randomly select an industry for investigation. (2) Visit the plant site to verify the correctness of existing information. (3) Locate the sampling manhole. (4) Set up an automatic sampler or samplers along with flow measuring devices, if necessary. (5) Label samples and transport to laboratory for analysis. (6) If requested by the industrial user, the control authority shall provide the following: (a) A list of all analyses to be completed. (b) A written report of analytical results within 15 days of the sample collection if possible. (7) Where the control authority has performed the sampling and analysis in lieu of the industrial user, the control authority must perform the repeat sampling and analysis within 30 days of becoming aware of the violation unless it notifies the user of the violation and requires the user to perform the repeat analysis. (C) All permitted industries are to be randomly sampled and inspected. Sampling and inspection will usually be conducted once annually; however, this frequency may be increased at the discretion of the control authority. (D) Self-monitoring by all industries shall be determined by the control authority using applicable State and/or Federal guidelines. (E) All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or baseline monitoring, periodic report, compliance date report or reports for industrial users not subject to categorical pretreatment standards shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the control authority or other parties approved by EPA. (F) Samples collected to satisfy reports required in EMC § 13.20.320, 13.20.350, 13.20.370 and 13.20.380 must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. The industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. The control authority shall require that frequency of monitoring necessary to assess and assure compliance by industrial users with applicable pretreatment standards and pretreatment requirements. (1) Except as indicated below, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the control authority. Where time-proportional composite sampling or grab sampling is authorized by the control authority, the samples must be representative of the discharge and the decision to allow the alternative sampling must be documented in the industrial user file for that facility or facilities. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the control authority, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. (2) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (3) For sampling required in support of baseline monitoring and 90-day compliance reports required in EMC §§ 13.20.350 and 13.20.370, a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the control authority may authorize a lower minimum. (4) Reports required for baseline monitoring, 90-day compliance monitoring, and industrial users not subject to categorical pretreatment standards shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass where requested by the control authority, of pollutants contained therein which are limited by the applicable pretreatment standards. This sampling and analysis may be performed by the control authority in lieu of the industrial user. Where the POTW performs the required sampling and analysis in lieu of the industrial user, the user will not be required to submit the compliance certification. In addition, where the POTW itself collects all the information required for the report, including flow data, the industrial user will not be required to submit the report.
( 1982 Code § 53.073 ; 1983 Code § 5.53.073 ; Ord. F-84-35 , passed 6-25-1984 ; Ord. G-96-9 , passed 7-8-1996 ; Ord. G-2014-17 § 2, passed 7-30-2014 ; Ord. G-2019-9 , passed 7-10-2019 )
Ask a question about Evansville law
Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
