For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.20.400 — Enforcement system

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 13.20.400

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/50ae8b61-c491-40d4-bf80-99d85d87ab7c

§ 13.20.400: Enforcement system.

Industries found to be in violation of any pretreatment requirements will receive notice of such instances. Notification and appropriate action may be in the form of the following types based upon the enforcement response plan (ERP) the control authority has developed: (A) Notification of Violation. Whenever the control authority finds that an industrial user has violated or is violating this chapter, or a wastewater discharge permit or order issued hereunder, the control authority may serve upon said user notice of the violation. Upon receipt of this notice, a plan for the satisfactory correction and prevention thereof, to include specific required actions, shall be submitted to the control authority. Submission of this plan in no way relieves the user of liability for any violations occurring before or after receipt of the notice of violation. (B) Consent Orders. The control authority is hereby empowered to enter into consent orders, assurances of compliance, or other similar documents establishing agreement with the industrial user responsible for the noncompliance. Such orders will include specific actions to be taken by the user to correct the noncompliance within a time period also specified by the order. (C) Show Cause Hearing. The control authority may order any industrial user which causes or contributes to violation of this chapter or wastewater discharge permit or order issued hereunder to show cause why a proposed enforcement action should not be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action and the reasons for such action, and a request that the user show cause why this proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least 10 days prior to the hearing. Such notice may be served on any principal executive, general partner or corporate officer. Whether or not a duly notified industrial user appears as notified, immediate enforcement action may be pursued. (D) Compliance Orders. When the control authority finds that an industrial user has violated or continues to violate this chapter or a permit or order issued hereunder, it may issue an order to the user responsible for the discharge, directing that, following a specified time period, sewer service shall be disconnected unless adequate treatment facilities, devices, or other related appurtenances have been installed and are properly operated. Orders may also contain such other requirements as might be reasonably necessary and appropriate to address the noncompliance, including the installment of pretreatment technology, additional self-monitoring, and management practices. (E) Cease and Desist Orders. When the control authority finds that an industrial user has violated or continues to violate this chapter or any permit or order hereunder, the control authority may issue an order to cease and desist all such violations and direct those persons in noncompliance to: (1) Comply forthwith; (2) Take such appropriate remedial or preventative action as is needed to properly address continuing or threatened violation, including halting operations and terminating the discharge. (F) Administrative Fines. Notwithstanding any other section of this chapter, any user who is found to have violated any provision of this chapter, or permits or orders issued hereunder, may at the discretion of the control authority be fined an amount not to exceed $2,500 per violation. Each day on which noncompliance occurs or continues to occur shall be deemed a separate and distinct violation. Such assessments may be added to the user's next scheduled sewer service charge and the control authority shall have such collection remedies as are available to collect other service charges. Unpaid charges, fines, and penalties shall continue to be a lien against the user's property. Industrial users desiring to dispute such fines must file a request for the control authority to reconsider the fine within 10 days of being notified of the fine. When the control authority believes a request has merit, it shall convene a hearing on the matter within 15 days of receiving the request from the industrial user. (G) Emergency Suspensions. (1) The control authority may suspend the industrial user's wastewater service and/or his permit whenever necessary in order to stop an actual or threatened discharge presenting or causing an imminent or substantial endangerment to the health or welfare of persons, the POTW, or the environment. (2) Any user notified of a suspension of the wastewater service and/or the discharge permit shall immediately stop or eliminate its contribution. In the event of the user's failure to immediately comply voluntarily with the suspension order, the control authority shall take such steps as deemed necessary, including immediate severance of the sewer connection, to prevent or minimize damage to the POTW, its receiving stream, or endangerment to any individuals. The control authority shall allow the user to recommence its discharge when the endangerment has passed. (3) An industrial user which is responsible, in whole or in part, for imminent endangerment shall submit a detailed written statement to the control authority within five days of such emergency, describing the cause of the harmful contribution and the measures taken to prevent any further occurrence. (H) Termination of Permit. Significant industrial users proposing to discharge into the POTW must first obtain a wastewater discharge permit from the control authority. Any user who violates any of the following conditions of this chapter, or a wastewater discharge permit, or order, or any applicable State or Federal law, is subject to permit termination: (1) Violation of permit conditions; (2) Failure to accurately report the wastewater constituents and characteristics of its discharge; (3) Failure to report significant changes in operations or wastewater constituents and characteristics; (4) Refusal of reasonable access to the user's premises for the purpose of inspection, monitoring or sampling. Noncompliant industrial users will be notified of the proposed termination of their wastewater discharge permit and be offered an opportunity to show cause why the proposed action should not be taken. (I) Water Supply Severance. Whenever an industrial user has violated or continues to violate the provisions of this chapter, or an order or permit issued hereunder, water service to the industrial user may be severed and will only recommence at the user's expense, after ability to comply has been satisfactorily demonstrated. (J) Judicial Remedies. If any person violates any of the provisions of this chapter or discharges sewage, industrial wastes, or other wastes into the wastewater disposal system contrary to the provisions of this chapter or any order or permit issued hereunder, the control authority through legal counsel may commence an action for appropriate legal and/or equitable relief. (K) Injunctive Relief. Whenever an industrial user has violated or continues to violate the provisions of this chapter or a permit or order issued hereunder, the control authority through counsel may petition the court for the issuance of a preliminary or permanent injunction or both (as may be appropriate) which restrains or compels the activities on the part of the industrial user. The control authority shall have such remedies to collect these fees as it has to collect other sewer service charges. (L) Civil Penalties. (1) Any user who has violated or continues to violate this chapter, or any order or permit issued hereunder, shall be liable to the control authority who has legal authority to seek or assess civil penalties in the amount of $2,500 a day for each violation, plus actual damages incurred by the POTW. The penalties shall be assessed per violation per day for as long as the violation continues. In addition to the above described penalties and damages, the control authority may recover reasonable attorneys' fees, court costs, and other expenses associated with the enforcement activities, including, but not limited to, sampling and monitoring expenses, as allowed by law. (2) The control authority shall petition the court to impose, assess and recover such sums. In determining the amount of liability, the court shall take into account all relevant circumstances, including, but not limited to, the extent of harm caused by the violation, the magnitude and duration, any economic benefit gained by the violation, corrective actions taken by the industrial user, the compliance history of the user, and any other factors as justice requires. (M) Criminal Prosecution. Any industrial user who knowingly makes any false statements, representations, or certifications in any application, record, report, plan, or other document filed or required to be maintained pursuant to this chapter, or wastewater discharge permit, or who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required under this chapter, shall be referred to the Vanderburgh County Prosecutor for possible criminal prosecution. (N) Publication. In order to comply with 40 CFR 403.8(f)(2)(viii), the control authority shall publish annually, in the largest daily newspaper in the municipality where the POTW is located, a list of industrial users which were in significant noncompliance (SNC) with applicable pretreatment standards and requirements during the previous 12 months. SNC will be any of the following: (1) Chronic violations of wastewater discharge limits, defined here as those in which 66 percent or more of all the measurements for the same pollutant parameter taken during a six-month period exceed (by any magnitude) a numeric pretreatment standards requirement, including instantaneous limits, as defined by 40 CFR 403.3(l); (2) A technical review criteria (TRC) violation, defined here as those in which 33 percent or more of wastewater measurements taken for each pollutant parameter during a six-month period equal or exceed the product of a numeric pretreatment standards requirement, including instantaneous limits, as defined by 40 CFR 403.3(l) multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other violation of a pretreatment standards requirement as defined in 40 CFR 403.3(l) that the control authority determines has caused, alone or in combination with other discharges, interference, passthrough or including endangering the health of POTW personnel or the general public; (4) Any discharge that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTW’s exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within 90 days after the schedule date, a compliance schedule milestone contained in an individual discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide, within 45 days after the due date, any reports required by this chapter; (7) Failure to accurately report noncompliance; (8) Any other violation, which may include a violation of best management practices, which the control authority determines will adversely affect the operation or implementation of the pretreatment program.

( 1982 Code § 53.100 ; 1983 Code § 5.53.100. Formerly 13.20.390 ; Ord. F-84-35 , passed 6-25-1984 ; Ord. G-96-9 , passed 7-8-1996 ; Ord. G-2012-12 , passed 7-25-2012 ; amended by City 5-14-2013 ; Ord. G-2019-9 , passed 7-10-2019 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.