For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.08.620 — Information requirements

Municipal Code of the City of Lafayette, Indiana (Codified through Ordinance of May 20, 2026. (Supp. No. 61, 11-26)) · Lafayette Municipal Code § 8.08.620

Corpus is an independent public-information project, not the official City of Lafayette website. Stable reference: corpuslaw.us/code/73379924-b429-4349-921b-0294b6345271

8.08.620 - Information requirements.

Specific projects or activities may be exempt from all or part of the informational requirements listed below. Exemptions are detailed in the "Applicability and Exemptions" sections of Articles II through V. If a project or activity is exempt from any or all requirements of this chapter, an application should be filed listing the exemption criteria met, in lieu of the information requirements listed below. This level of detailed information is not required from individual lots in residential subdivisions with land disturbance less than one-half acre of land, which are developed within a larger permitted project site. Review and approval of such lots is covered under Section 8.08.630. The different elements of a permit submittal include an application checklist, construction plans, a stormwater drainage technical report, a stormwater pollution prevention plan for active construction sites, a post-construction stormwater pollution prevention plan, and any other necessary supporting information. The application checklist can be found in Appendix B of the Technical Standards. All plans, reports, calculations, and narratives shall be signed and sealed by a professional engineer or a licensed surveyor, registered in the State of Indiana who also meets the definition of a Trained Individual. A. Application Checklist. As part of the permit application package, the application checklist provide in the Technical Standards must be completed by the applicant and provided along with other supporting material. B. Construction Plans. Construction plan sheets (larger than eleven (11) inches x seventeen (17) inches, but not to exceed twenty-four (24) inches x thirty-five (35) inches) and an accompanying narrative report shall describe and depict the existing and proposed conditions. Note that in order to gain an understanding of and to evaluate the relationship between the proposed improvements for a specific project section/phase and the proposed improvements for an overall multi-section (phased) project, the detailed information requested herein for the first section/phase being permitted must be accompanied by an overall project plan that includes the location, dimensions, and supporting analyses of all detention/retention facilities, primary conveyance facilities, and outlet conditions. Construction plans need to include items listed in the application checklist provided in the Technical Standards. C. Stormwater Drainage Technical Report. A written stormwater drainage technical report must contain a discussion of the steps taken in the design of the stormwater drainage system. Note that in order to gain an understanding of and to evaluate the relationship between the proposed improvements for a specific project section/phase and the proposed improvements for an overall multi-section (phased) project, the detailed information requested herein for the first section/phase being permitted must be accompanied by an overall project plan that includes the location, dimensions, and supporting analyses of all detention/retention facilities, primary conveyance facilities, and outlet conditions. The technical report needs to include items listed in the application checklist provided in the Technical Standards. D. Stormwater Pollution Prevention Plan for Construction Sites. A stormwater pollution prevention plan (SWPPP) associated with construction activities must be designed to, at least, meet the requirements of this chapter and Technical Standards. The SWPPP must include items listed in the application checklist provided in the Technical Standards. E. Post-Construction Storm Water Pollution Prevention Plan. The post-construction storm water pollution prevention plan must be designed to, at least, meet the requirements of this Chapter and must include information provided in the Technical Standards. The post-construction SWPPP must include items listed in the application checklist provided in the Technical Standards. F. Operation and Maintenance Manual. 1. This Operation and Maintenance Manual will be kept on file by the City of Lafayette for use during inspections. A copy will also be provided to the landowner for inspection and maintenance purposes. 2. Suggested inspection and maintenance guidelines to be used in the manual for various post-construction stormwater quality measures can be found in the Technical Standards appendices. G. Maintenance Agreement. A formal BMP maintenance agreement will need to be prepared and notarized consistent with the sample agreement provided in the Technical Standards Manual, providing for the long-term maintenance of BMPs. This maintenance agreement shall be recorded for the property on which the project is located.

(Ord. 2008-03 § 2 (part), 2-4-08; Ord. No. 2011-27, § 13, 12-5-11; Ord. No. 2023-06, § 17, 3-6-23)

Ask a question about Lafayette law

Corpus searches the Lafayette sections it holds and shows the ones that match, with their citations. Free, no sign-in.