§ 8.08.630 — Review of individual lots within a permitted project
Municipal Code of the City of Lafayette, Indiana (Codified through Ordinance of May 20, 2026. (Supp. No. 61, 11-26)) · Lafayette Municipal Code § 8.08.630
Corpus is an independent public-information project, not the official City of Lafayette website. Stable reference: corpuslaw.us/code/269560c0-2c68-4e92-8bb5-3481a7957080
8.08.630 - Review of individual lots within a permitted project.
Although no permit is required for individual lots that disturb less than one-half acre in residential subdivisions, a formal stormwater review will be required before a building permit can be issued. All stormwater management measures necessary to comply with this chapter must be implemented in accordance with the permitted plan for the larger project. The following information must be submitted for review and approval, to the City of Lafayette, by the individual lot operator, whether owning the property or acting as the agent of the property owner, prior to the issuance of a building permit. A. A site layout for the subject lot and all adjacent lots showing building pad location, dimensions, and elevations, and the drainage patterns and swales. B. Erosion and sediment control plan that, at a minimum, includes the following measures: 1. Installation and maintenance of a stable construction site access. 2. Installation and maintenance of appropriate perimeter erosion and sediment control measures prior to land disturbance. 3. Minimization of sediment discharge and tracking from the lot. 4. Clean-up of sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules. 5. Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization. 6. Self-monitoring program including plan and procedures. C. Certification stating that the individual lot plan is consistent with the stormwater management permit, as approved by the City of Lafayette, for the larger project. The individual lot operator is responsible for installation and maintenance of all erosion and sediment control measures until the site is stabilized. A typical erosion and sediment control plan for individual lots can be found in the City of Lafayette standard drawings. The form for certifying compliance with the stormwater management plan for the larger project can be found in Appendix B of the Technical Standards.
(Ord. 2008-03 § 2 (part), 2-4-08; Ord. No. 2011-27, § 14, 12-5-11)
Ask a question about Lafayette law
Corpus searches the Lafayette sections it holds and shows the ones that match, with their citations. Free, no sign-in.
