The following requirements shall be complied with for the specified use: (a) Power Generation Plants. (1) The development and operation of the power plant shall meet all state, and federal requirements. All required permits shall be kept up-to-date. (2) All surface or sub-surface water intake and discharge must meet county, state and federal agency requirements. (3) Air emissions must meet all state and federal agency requirements. Odor, smoke, fumes and dust shall be controlled so as not to cause a public nuisance or hazard. The effects of air pollution, noise, and vibrations shall be minimized on adjacent properties. (4) Chimneys, cooling towers or stacks may exceed the height limits of the district; provided they are setback from any non-industrially zoned property a distance at least equal to their height and meet all requirements of Federal Aviation Administration and meet requirements of the Airport Overlay District if within the district. (5) On-site storage of all materials shall be indicated on the site plan and shall meet all setback requirements of the district. Outdoor storage areas shall be screened by a minimum six foot tall solid screening wall in accordance with Section 17.03. Any stockpiles of materials shall be contained to prevent dust erosion or other type of off-site discharge. (b) Wind Energy Conversion Systems (WECS). (1) Single Accessory WECS. A WECS to service the energy needs of the property where the structure is located may be allowed with special exception approval in all districts, subject to the following requirements: a. Only one WECS shall be permitted per parcel or lot. b. The tower shall not be higher than 45 feet. The height of the overall WECS with the blade in the vertical position shall not exceed 50 feet above ground level. The allowable height may be further limited in order to meet setbacks in paragraph c below. c. All towers shall be set back a distance at least equal to one and one-half times the WECS height from all property lines. The height shall be measured to the top of the blade at its highest point. d. The blade diameter (tip to tip) shall not exceed 15 feet. e. The minimum blade or rotor clearance from the ground shall be 20 feet for a horizontal-axis WECS and ten feet for a vertical-axis WECS. The minimum blade or rotor clearance from a building or utility line shall be 20 feet. f. All WECS shall be equipped with both a manual brake and automatic braking systems, or governing device capable of keeping the WECS operation in high winds within 80 percent of its survival wind speed. All WECS shall be adequately anchored to prevent their being knocked down by high winds. g. A WECS shall be constructed with a tubular tower. Lattice towers and guy wires shall be prohibited. h. Towers shall not have permanent attached tower climbing devices. i. A WECS shall be painted a non-obtrusive (light color such as white, beige or light gray) color that is non-reflective. No striping or color shall be visible on the blades or tower. j. All distribution lines from the WECS to the building and the electrical grid connection shall be underground. The generator and all other electrical equipment, and controls shall be enclosed within the nacelle, pole or within a building. k. Excess power may be sold back to the local electric utility provider. In the case of WECS to be interconnected with the power grid of the local electric utility, the applicant shall provide proof of written notice to the utility of the proposed interconnection and the utility's response. The resident shall comply with all requirements of the servicing utility if the WECS is interfaced with the utility grid. The utility will install appropriate electric metering (for sellback and non-sellback) and the customer will be required to install a disconnecting device adjacent to the electric meter(s). l. Noise emissions from the operation of a WECS shall not exceed 50 decibels on the DBA scale, as measured at the nearest property line or road. Manufacturer's specifications indicating the operating noise levels of the WECS at full RPM shall be provided with the application. The enforcement official may require the owner to pay for a sound evaluation by a qualified professional following installation to determine compliance with the requirements of this section. (2) Commercial WECS. WECS larger than those allowed in (1) above, wind farms and WECS Testing Facilities associated with the commercial application of a WECS may be allowed as a special exception within the A1, Agriculture and M1 and M2, Industrial Districts, subject to the following requirements: a. All applications for special exception approval shall be accompanied by the following information, in addition to the site plan required by Section 23.03: 1. Location and height of all proposed buildings, structures, electrical lines, towers, security fencing, and other above ground structures associated with the WECS. 2. Locations and height of all adjacent buildings, structures, and above ground utilities located within 300 feet of the exterior boundaries of the lot or parcel where the proposed WECS will be located. Specific distances to other on-site buildings, structures, and utilities shall also be provided. 3. The location of all existing and proposed overhead and underground electrical transmission or distribution lines shall be shown. 4. Existing and proposed setbacks for the WECS from all structures located on the property where the WECS will be located. 5. The site plan submittal shall contain a written description of the procedures to be used to maintain the WECS. The description shall include maintenance schedules, types of maintenance to be performed, and removal procedures and schedules in the event the WECS becomes obsolete or is abandoned. 6. A copy of the manufacturer's installation instructions and blueprints shall be provided to the county or city. 7. Drawings and engineering calculations shall be certified by a registered engineer licensed in the State of Indiana. 8. A noise modeling and analysis report showing noise levels at property lines at full RPM. 9. A shadow flicker analysis shall be prepared if there is any residential buildings, livestock areas or public roadways within 1,000 feet of the proposed system. b. The permitted maximum total height of a WECS shall be 200 feet (with the blade in the vertical position). 1. A WECS shall be designed at a height that will not require aviation hazard lighting by the FAA. A determination of no hazard letter issued by the FAA shall demonstrate that lighting is not required prior to approval of the special exception. If construction of the WECS requires FAA or Indiana Department of Aviation approval or review, then a final decision must be provided before the Board of Zoning Appeals may conduct any public hearing on a request for special exception. 2. The La Porte Airport Authority Board and the Michigan City Board of Aviation Commissioners shall be given written notice at least 60 days prior to the hearing that a permit has been filed requesting the approval of a special exception for a WECS. 3. Any new WECS within the Airport Overlay District shall comply with the height limits of the overlay district, measured relative to the airport elevation. c. A WECS shall be constructed with a tubular tower, not a lattice tower. d. The setback for placement of a WECS shall be equal to one and one-half times the height of the WECS from each property line and any public road right-of-way. This may be reduced from an adjacent property that also contains a WECS, provided the spacing requirement of paragraph f below is met. e. A commercial WECS shall be setback a minimum of 1,000 feet from any residential subdivision or school. f. The minimum distance between two WECS shall be equal to the combined height of both WECS. g. Blade arcs created by a WECS shall have a minimum of 75 feet of clearance over and from any structure, adjoining property or tree. The minimum blade or rotor clearance above ground level shall be at least 20 feet. h. Each WECS shall be equipped with both a manual and automatic braking device capable of stopping the WECS operation in high winds within 80 percent of design limits of the rotor. i. To prevent unauthorized climbing, WECS must provide an anti-climb device. j. Each WECS shall have one sign, not to exceed two square feet in area, posted at the base of the tower. The sign shall contain high voltage warning, emergency numbers and emergency shutdown procedures. If the facility is fenced, signs shall be placed on the fence. k. A lighting plan for each WECS shall be approved by the county or city. The lighting plan must describe all lighting that will be utilized, including any lighting that may be required by the FAA. The plan shall include, but is not limited to, the number and location of lights, light color and whether any lights will be flashing. Strobe lights are discouraged and must be shielded from the ground if allowed. All efforts shall be made not to affect any resident with any strobe effect. l. A WECS shall be painted a non-obtrusive color (light environmental color such as white, beige or gray) that is non-reflective. The wind turbine base and blades shall be of a color consistent with all other turbines in the area. No striping of color or advertisement shall be visible on the blades or tower. m. All distribution lines from the WECS to the electrical grid connection shall be installed underground. n. WECS shall be designed, constructed and operated so as not to cause radio and television interference. In the event that electromagnetic interference is experienced, the applicant must provide alternate service to each individual resident or property owner affected. o. Noise emissions from the operation of a WECS shall not exceed 50 decibels on the dBA scale, as measured at the nearest property line or road. Equipment shall be placed so that the WECS will not exceed the maximum permitted sound pressure levels. After installation of the WECS, sound pressure level measurements shall be done by a third party, qualified professional according to the procedures in the most current version of ANSI S12.18. All sound pressure levels shall be measured with a sound meter that meets or exceeds the most current version of ANSI S1.4 specifications for a Type II sound meter. Documentation of the sound pressure level measurements shall be provided to enforcement official within 60 days of the commercial operation of the project. p. A shadow flicker analysis shall be prepared if there is any residential building, livestock area or public roadway within 1,000 feet of the proposed system. Shadow flicker caused by wind turbines is defined as alternating changes in light intensity due to the moving blade shadows cast on the ground and objects. The analysis shall identify the locations of shadow flicker that may be caused by the WECS blade rotation and the expected durations of the flicker at these locations from sun-rise to sun-set over the course of a year. The analysis shall identify problem areas where shadow flicker may affect residents livestock and traffic. The analysis shall also show measures that shall be taken to eliminate or mitigate the problems. q. WECS must be kept and maintained in good repair and condition at all times. If a WECS is not maintained in operational and reasonable condition or poses a potential safety hazard, the applicant shall take expeditious action to correct the situation. The applicant shall keep a maintenance log on each WECS, which the county or city can review on a monthly basis. r. Any WECS not used for six successive months or longer shall be deemed to be abandoned and shall be promptly dismantled and removed from the property. All above and below ground materials must be removed. The ground must be restored to its original condition within 60 days of removal. s. Any public roads that will be used for transporting WECS equipment shall be identified with the application. The county highway engineer and county sheriff shall approve the proposed routes on any county road and the city engineer and city police chief shall approve the proposed routes on any city street. Any road damage caused by the transportation of WECS equipment shall be repaired to the satisfaction of the county highway engineer or city engineer. A performance guarantee for road repair shall be required in accordance with the provisions of Section 26.03. t. If a special exception is approved pursuant to this section, a performance guarantee shall be required in accordance with the provisions of Section 26.03, which will be furnished by the applicant to the county or city in order to ensure full compliance with this subsection and any conditions of approval. At a minimum, the performance guarantee shall be in an amount determined by the county or city to be sufficient to have the WECS fully removed and the land returned to its original state should the structure or structures become abandoned, dangerous or obsolete, or not in compliance with this Ordinance or the special exception approval. The performance guarantee shall be kept in full force and effect during the entire time while a WECS exists. (c) Wireless Communication Facilities and Services. (1) Purpose and Intent. The regulations of this Section are intended to conform to federal laws and administrative rules governing facilities needed to operate wireless communication systems and to set forth procedures and standards for review and approval for the location of such facilities within the county or city. a. It is the intent to reasonably regulate the location and design of such facilities to retain the integrity of neighborhoods and the character, property values and aesthetic quality of the county or city. b. Given the increase in the number of wireless communication facilities requested as a result of the new technology and the Federal Telecommunications Act of 1996, it is the policy that all users should collocate attached wireless communication facilities and wireless communication towers, where practicable. Collocation is proposed in order to assure the most economic use of land and to prevent the proliferation of duplicative structures. c. In recognition of the concern that technological advances may render certain wireless communication facilities obsolete or unnecessary in the future, requirements are set forth for the removal of unused or unnecessary facilities in a timely manner and provide security for removal. (2) Zoning Districts and Approval Process for Wireless Communication Facilities. Wireless Communication Facilities may be located, as follows: Table 9.15 Wireless Communication Facilities Type/Location of Wireless Communication Facility | Districts Permitted | Approval Procedure Attached Wireless Communication Facilities on Existing Structures Attached to an existing building or structure that will not be materially altered or changed in appearance | All districts, except on lots occupied by a single family residential use | Approval by the enforcement official Attached to an existing utility structure that will not be modified or materially alter the pole or impair sight lines or compromise safety | All districts | Approval by the enforcement official Collocation upon an existing wireless communication facility | All districts | Approval by the enforcement official New Wireless Communication Tower Monopole up to 150 feet in height | A1 district or on civic, educational, public, and religious sites in all districts, except AP | Special exception and site plan by the board of zoning appeals Monopole up to 199 feet in height | B1, B2, B3, O1, MD, M1 and M2 | Special exception and site plan by the board of zoning appeals Lattice tower up to 199 feet in height where it can be demonstrated that a monopole is not feasible | M1 and M2 districts | Special exception and site plan by the board of zoning appeals (3) Application Requirements - Collocation. The following information shall be provided with the application, in addition to other site plan submittal requirements for an attached wireless communication facility collocated on an existing structure: a. The name, address and phone number of the person to contact for engineering, maintenance and other notice purposes. This information shall be continuously updated during all times the facility is on the premises. b. The owner and/or operator of the existing tower or structure. c. Legal description of the parent tract and leased parcel (if applicable). d. Elevation drawings and construction details of all existing and proposed wireless communication facilities, including accessory structures and equipment shelters. e. The reason or purpose for the wireless communication facility with specific reference to the provider's coverage, capacity and/or quality needs, goals and objectives. f. Identification of the entities providing the backhaul network for the tower described in the application and other cellular sites owned or operated by the applicant in the county or city. g. The structural capacity and whether it can accommodate the facility, as proposed or modified. h. Limits and type of fencing, the method of screening and location and type of illumination. i. A description of compliance with this section and all applicable federal, state or local laws. j. A description of performance guarantee to be posted upon issuance of a building permit to ensure removal of the facility if it is abandoned or is no longer needed. (4) Application Requirements for New Wireless Communication Tower. The following information shall be provided with the application to construct any new wireless communication tower, in addition to the submittal requirements in subsection (3) above: a. A description of performance guarantee to be posted at the time of receiving a permit for the facility to ensure removal of the facility when it is abandoned or is no longer needed. The applicant shall demonstrate that funds will be available to the county or city for removal of any structure used for wireless communication in an amount which reasonably reflects the cost of removal of the facility and restoration of the property or structure upon which the facility is located or placed. Adequate funds shall also be provided to cover the county or city's administrative costs in the event that the applicant or its successor does not remove the Wireless Communication Facility in a timely manner. b. Inventory all existing towers, antennas, or sites approved for towers that are within three miles of the proposed site, including specific information about the location, height, and design of each tower. c. In recognition of the policy to promote collocation, a written agreement, transferable to all successors and assigns, that the operator shall make space available on the facility for collocation. d. A description of the suitability of the use of existing towers, other structures or alternative technology not requiring the use of towers or structures to provide the services to be provided through the use of the proposed new tower. e. Prior to issuing an improvement location permit, a signed certification by a professional structural engineer licensed by the State of Indiana shall be provided to the county or city that describes the manner in which the proposed structure will fall in the event of damage, accident or injury (i.e. "fall zone"), and that the designated setback area shall accommodate the structure in the event it falls or breaks and will provide a reasonable buffer in the event the structure fails. f. The La Porte Airport Authority Board and the Michigan City Board of Aviation Commissioners shall be given written notice at least 60 days prior to the hearing that a permit has been filed requesting the approval of a new wireless communication tower. g. A determination of no hazard letter issued by the FAA shall demonstrate that lighting is not required prior to approval of the special exception. If construction, and or use of the telecommunications requires FAA or Indiana Department of Aviation approval or review, then a final decision must be provided before the Board of Zoning Appeals may conduct any public hearing on a request for special exception. (5) Design Standards Applicable to All Facilities. All wireless communication facilities shall be constructed and maintained in accordance with the following standards: a. Facilities shall be located and designed to be harmonious with the surrounding areas. b. Minimum six foot tall fencing shall be provided for protection of the tower and associated equipment and for security from children and other persons who may otherwise access the facilities. A brick wall may be substituted for the required fencing. c. Landscaping shall be provided to screen the structure base, accessory buildings and enclosure from adjacent uses and public rights-of-way. d. Accessory buildings shall be a maximum of 14 feet high and shall be set back in accordance with the requirements for principal buildings in the respective zoning district. e. All attached wireless communication facilities proposed on the roof of a building shall be designed, constructed and maintained to be architecturally compatible with the principal building. The height of the wireless communication facilities shall not exceed the maximum height of the district plus the allowable exceptions to the height limits contained in Section 15.02. The equipment enclosure may be located within the principal building or may be an accessory building. If proposed as an accessory building, it shall conform to all district requirements for principal buildings, including yard setbacks. f. The requirements of the Federal Aviation Administration, local airport and Federal Communication Commission shall be noted. g. If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. (6) Design Standards Applicable to New Towers. In addition to the design standards in subsection (5) above, all wireless communication towers shall be constructed and maintained in accordance with the following standards: a. Feasible Collocation. Siting or placement of new wireless communication facilities or towers shall be in accordance with the following hierarchy. The order of ranking shall be: (1) co-location first, (2) existing structure or building utilization, (3) new wireless communications facility tower location last. If a new tower is proposed, the applicant must have substantial evidence that a higher ranked alternative is not feasible or available. A permit for the construction and use of a new wireless communication facility shall not be granted until the applicant demonstrates a feasible collocation is not available for the coverage area and capacity needs. b. Tower in County. Any tower located in the unincorporated areas of the county outside of cities shall be separated a minimum of two miles from any existing tower. This separation requirement shall not apply to a tower that is proposed to be located in an M-1 or M-2 industrial district. c. Collocation Agreement. All new and modified wireless communication facilities shall be designed and constructed to accommodate collocation, with a written agreement in a format approved by the county or city attorney. Any tower that is 150 feet or taller shall be capable of co-location of at least four additional users. Any tower that is less than 150 feet shall be capable of co-location of at least two additional users. The tower owner shall make space available for collocation of emergency communication equipment if requested by the county or city. d. Height. 1. The maximum height for a new wireless communication tower shall be 199 feet. 2. A new wireless communication tower shall be designed at a height that will not require aviation hazard lighting by the FAA. 3. Any new tower within the Airport Overlay District shall comply with the height limits of the overlay district, measured relative to the airport elevation. 4. The applicant shall demonstrate that the requested height of the new or modified tower and antenna shall be the minimum height necessary for reasonable communication, including additional height to accommodate future collocation where appropriate. e. Tower Setbacks. The wireless communication tower shall be setback from all non-residential property lines a distance at least equal to one-half the height of the tower, from all residential property lines a distance at least equal to the height of the tower and from all street right-of-way lines a distance at least equal to the height of the tower. f. Guy Wires. All towers shall be self-supporting and guy wires shall be prohibited. g. Accessory Structure Setback. Accessory structures must satisfy the minimum zoning district building setback requirements. h. Access. There shall be unobstructed access to the tower, for operation, maintenance, repair and inspection purposes, which may be provided through or over an easement. This access shall have a width and location determined by such factors as: the location of adjacent thoroughfares and traffic and circulation within the site; utilities needed to service the tower and any attendant facilities; the location of buildings and parking facilities; proximity to residential districts and minimizing disturbance to the natural landscape; and the type of equipment which will need to access the site. i. Soils Report. The tower shall be constructed in accordance with all applicable building codes and shall include the submission of a soils report from a geotechnical engineer, licensed in the State of Indiana. This soils report shall include soil borings and statements confirming the suitability of soil conditions for the proposed use. j. Color. Towers shall be painted a neutral color so as to reduce visual obtrusiveness or be constructed of galvanized steel. k. Lighting. Towers shall not be artificially lighted and shall not exceed a height that requires aviation hazard lighting. (7) Collocation. a. Statement of Policy. It is the policy to minimize the overall number of newly established locations for wireless communication facilities and towers throughout the county by encouraging the use of existing structures. If a provider fails or refuses to permit collocation on a facility owned or controlled by it, where collocation is feasible, the result will be that a new and unnecessary additional structure will be required, in contradiction with policy. Collocation shall be required unless an applicant demonstrates that collocation is not feasible. b. Antennas on Existing Towers. An antenna which is attached to an existing tower may be approved by the enforcement official and, to minimize adverse visual impacts associated with the proliferation and clustering of towers, collocation of antennas by more than one carrier on existing towers shall take precedence over the construction of new towers, provided such collation is accomplished in a manner consistent with the following: 1. A tower which is modified or reconstructed to accommodate the collocation of an additional antenna shall be of the same tower type as the existing tower, unless the enforcement official allows reconstruction as a monopole. 2. An existing tower may be modified or rebuilt to a taller height, not to exceed 15 feet over the tower's existing height, to accommodate the collocation of an additional antenna with approval by the enforcement official. A height increase of more than 15 feet shall require approval by the Board of Zoning Appeals. c. Antennas Mounted on Structures or Rooftops. Wireless communication antennas placed on the roofs of buildings may be approved by the enforcement official, if the principal use is a conforming use and the building is a conforming structure. The antenna shall not exceed the height of its supporting structure by more than 12 feet. d. Antennas Mounted on Utility Structures. Wireless communication antennas attached to utility structures such as water towers or electrical transmission line towers may be approved by the enforcement official. The equipment cabinet or structure used in association with antennas shall be located in accordance with the Ordinance requirements for accessory structures. (8) Variances. The Board of Zoning Appeals may consider a variance from the standards of this Section, based upon a finding that one or more of the following factors exist, as appropriate for the type of variance requested: a. Location. The applicant must demonstrate that a location within a district or location in accordance with the standards of this Section cannot reasonably meet the coverage or capacity needs of the applicant. b. Tower Setback. The applicant has provided engineering information documenting that the tower is self-collapsing and that the setback designated area would accommodate the structure should it fall or break and would provide a reasonable buffer in the event the structure fails. c. Height. The height requested is due to signal interference due to topography, tall buildings, masses of trees, or other obstructions, or would reduce the number of towers to the benefit of the cities and county. The granting of the variance would not have a negative impact on any public use airport. d. Mitigation. The applicant has proposed means to mitigate any negative impacts through provision for future collocation, if found to be appropriate by the county or city and special design of the facility and site. e. Design. The wireless communication and accessory facilities shall be designed to be compatible with the existing character of the proposed site, neighborhood and general area such as a steeple, bell tower, or similar form. (9) Removal. Wireless communication facilities shall be removed by the owner if the facility is no longer in use. The facilities must be removed within a year of the end of use. A performance guarantee shall be provided to the county or city at the time of receiving an improvement location permit for the facility to ensure removal of the facility when it is abandoned or is no longer needed. The applicant shall demonstrate that funds will be available to the county or city for removal of any structure used for wireless communication in an amount which reasonably reflects the cost of removal of the facility and restoration of the property or structure upon which the facility is located or placed. Adequate funds shall also be provided to cover the county or city's administrative costs in the event that the applicant or its successor does not remove the Wireless Communication Facility in a timely manner.

Ask a question about Michigan City law

Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.