§ 14.18 — Mining
Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code, App. C, art. 14, § 14.18
Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/90a675ac-3206-4ec9-9b48-56f517ed872c
Section 14.18 - Mining
The following requirements shall be complied with for the specified use: (a) Mineral and Non-Mineral Extraction and General Mining Operations. (1) Application. The following additional information shall be included with the special exception and site plan applications: a. Report by a qualified soil scientist, soils engineer or geologist regarding the effect the proposed operation will have upon the watershed of the area, with particular attention being devoted to the water table, and, if water bodies are to be created, the anticipated permanence of such. b. A soil erosion control plan prepared in accordance with Article 22. c. A detailed description of the method of operation including an operations and restoration plan for the extraction of the natural resources deposits. The operations and restoration plan shall include the following: 1. A progressive cell unit mining plan that divides the mining area into sections and delineates the progressive mining proposal on the extractive resources available. 2. Description of how wetlands, surface and ground waters will be protected during mining operations in accordance with La Porte, Indiana Code of Ordinances Article VI — Protection of Wetlands and Lakes. A transportation plan showing access to the site, proposed truck traffic and planned on-site roads. The applicant shall submit these proposed routings for review relative to the physical and design capabilities of these routes to accommodate the potential traffic. 3. An overburden and stockpiling plan which shows how top soil will be stripped and stored on the site as well as the stockpiling of extracted sand or gravel. 4. A re-vegetation plan which shows the staging of restoration through the grading process as well as replacing the top soil and the planting of appropriate native grasses, trees and shrubs. 5. End use plan which shows the ultimate use of the property once restored to assure the county or city the site is being restored in accordance with the county land development plan. 6. A detailed explanation of how the applicant intends to comply with the operating requirements of this section. (2) Operations. The removal of sand, gravel, limestone, peat or similar materials by excavation, stripping, mining or otherwise taking, and including on-site operations appurtenant to the taking, including washing, grading, sorting, (excluding grinding operations) shall be carried on within the limits of an area approved for such activities. All extractions from new pits begun subsequent to the effective date of this Ordinance shall be washed, graded, and further processed and/or stored within the limits of the area approved, and no natural resource extracted outside the limits of this area shall be brought in for washing, grading, or further processing. Resource related industries including, but not limited to: gravel grinding operations, concrete mixing plants and asphalt batching plants shall not be permitted as a part of the operation unless the activity is located in a Zoning District which would permit such a use. (3) Setbacks. Excavation, washing and stockpiling of extracted material shall not be conducted closer than 150 feet to the outer boundary of the area approved for extractive operation. The setback area shall not be used for any activity in conjunction with the extractive operation, except access roads, public notice signs and signs identifying the operation. Greenbelt plantings and landscaping shall be provided in the setback area as required by the Board of Zoning Appeals. To reduce the effects of airborne dust, dirt, and noise, all equipment for loading, weighing, and other operations structures shall not be built closer than 300 feet from any public street right-of-way or from any adjoining residentially zoned district. (4) Access. All means of access to the property shall be from major thoroughfares. No access shall be allowed from residential streets. All private access roads shall be treated so as to create a dust-free surface for a distance of 300 feet from any public access road. Arrangements shall also be made to minimize dust on public access routes traveled in the county or city. (5) Fencing. Any excavation operation that results in standing water for a period of at least one month during the year or slopes as described below shall be subject to the following safety requirements: a. Where slopes steeper than 30 degrees exist for a period of one month or more, access to such slopes shall be barred by a cyclone fence or similarly effective barrier at least six feet high, at least 50 feet outside the edge of the excavation, with suitable gates controlling access to the excavation area. b. Where collections of water are one foot or more in depth for any period of at least one month, and occupying an area of 200 square feet or more, access to such collections shall be fenced, as required in subparagraph a above. c. In those instances where the extractive area is situated in marginal land areas consisting of swamp land, or is bounded by natural bodies of water, the fence shall be required only on those sides accessible to public rights-of-way or as the Board of Zoning Appeals may determine as requiring fencing so as to secure safety. The Board of Zoning Appeals may require the posting of signs "KEEP OUT — DANGER," as needed. (6) Slopes. Finished slopes of the excavation site shall not exceed a minimum of five feet to one foot (five feet horizontal to one foot vertical) and where ponded water results from the operations, this slope must be maintained and extended into the water to a depth of five feet. These slopes shall be established as the work in any one section of the excavation is completed and proceeds to the next section. Sufficient top soil shall be stockpiled on the site so the entire area may be covered with a minimum of six inches of top soil when excavating operations are completed. The replacement of top soil shall be made immediately following termination of excavating operations. In order to prevent erosion of slopes, all replaced top soil shall immediately be planted with native grasses or other native plant material acceptable to the enforcement official. (7) Hours of Operation. Extraction and material processing activities permitted in the plant area shall be limited to the hours of 7:00 a.m. to 7:00 p.m., except in the following situations: a. Where required by public authorities; b. Where work requires a continuous flow of materials; c. Where necessary due to public emergencies; d. Where any necessary and reasonable repairs to equipment are required.
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.