§ 21.16 — Standards for SFHAS without Established Base Flood Elevation and/or Floodways/Fringes

Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code, App. C, art. 21, § 21.16

Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/77625a6f-8f09-4af9-9995-ba710ee0aa1b

Section 21.16 - Standards for SFHAS without Established Base Flood Elevation and/or Floodways/Fringes

(a) The following standards apply if the drainage area upstream of the proposed development site is greater than one square mile: (1) If the site is an identified floodplain where the limits of the floodway and fringe have not yet been determined, and the drainage area upstream of the site is greater than one square mile, the enforcement official shall require the applicant to forward the application, along with all pertinent plans and specifications, to the IDNR for review and comment. (2) No action shall be taken by the enforcement official until either a permit has been issued for construction in the floodway, or a floodplain analysis/regulatory assessment that cites the 100-year flood elevation and the recommended FPG has been received from the IDNR. (3) Once the enforcement official has received the proper permit for construction in a floodway, or a floodplain analysis/regulatory assessment approving the proposed development, a floodplain development permit may be issued, provided the conditions of the floodplain development permit are not less restrictive than the conditions received from the IDNR and the provisions contained in Section 21.10 through 21.16 have been met. (b) The following standards apply if the drainage area upstream of the proposed development site is less than one square mile. (1) If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined and the drainage area upstream of the site is less than one square mile, the enforcement official shall require the applicant to provide an engineering analysis showing the limits of the floodway, fringe and 100-year flood elevation for the site. (2) Upon receipt, the enforcement official may issue the local floodplain development permit, provided the provisions contained in Section 21.10 through 21.16 have been met. (c) The total cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the regulatory flood and will not increase flood damages or potential flood damages. (d) No structures intended for occupancy shall be constructed within the floodway.

Ask a question about Michigan City law

Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.