Sec. 117-38. - Content of construction stormwater pollution prevention plan (SWPPP)—Significant land disturbing activity.
All applications for an improvement location permit for significant land disturbing activity shall include, but not be limited to, the following content and construction SWPPP in accordance with IDEM's CSGP: (1) An index indicating the location, in the construction plan, of all information required by this section. (2) A vicinity map depicting the project site location in relationship to recognizable local landmarks, towns, and major roads. (3) A project narrative and supporting plan documents (documentation may be included on the plan sheets or in a separate document), which must include: a. A description of the nature and purpose of the project. b. A legal description of the project site. The description must include the legal section(s), or alternative land division(s), township and range. c. The latitude and longitude in decimal representation at: i. The approximate entrance to the project site that is obtaining permit coverage if the project is not linear. ii. The beginning of the project site for linear projects. d. The size of the project area expressed in acres. e. The total expected land disturbance expressed in acres. f. Construction support activities that are expected to be part of the project. g. The soil properties, characteristics, limitations, and hazards associated with the project site and the measures that will be integrated into the project to overcome or minimize adverse soil conditions. h. The general construction sequence related to phasing of the project. i. A reduced plat or project site map that is submitted on a sheet or sheets no larger than 11 inches by 17 inches for all phases or sections of the project site (multiple sheets may be submitted to meet this requirement) and includes: i. The boundaries of the project site as represented in the full construction plans and for which the notice of intent (NOI) will be submitted. ii. The boundaries of each phase, section, or other divisions of the project site associated with the construction activity. iii. When applicable, the lot numbers, lot boundaries, road layout, and road names. iv. A legend. j. The identification and location of all wetlands, lakes and water courses on or adjacent to the project site. k. The location of any in-stream activities that are planned for the project including, but not limited to stream crossings and pump arounds. l. The identification and status of any other state or federal water quality permits or authorizations that are required for construction activities associated with the project site. If the permit or authorization has not been obtained, provide the expected timeline for obtaining the permit or authorization. m. The identification of a U.S. EPA approved or established TMDL, including the name of the TMDL and the pollutant(s) for which there is a TMDL. n. The identification of discharges to a water on the current 303(d) list of impaired waters and the pollutant(s) for which it is impaired. (4) An existing project site layout which must include: a. The identification of all wetlands, lakes, and water courses on, or adjacent to, the project site. b. The location of all existing structures on the project site. c. The boundaries of the 100-year flood plains, floodway fringes, and floodways. d. A soil map of the predominant soil types, as determined by the United States Department of Agriculture, Natural Resources Conservation Service (USDA, NRCS) Soil Survey, an equivalent publication, or as determined by a soil scientist. A soil legend must be included with the soil map. e. The identification and delineation of natural buffers and existing vegetative cover, such as crop or crop residue, grass, weeds, brush, and trees. f. The land use of all adjacent properties. g. The existing topography at a contour interval appropriate to indicate drainage patterns. h. The location(s) of where run-off enters the project site. i. The location(s) of where run-off discharges from the project site. (5) The final project site layout which must include: a. The location of all proposed site improvements, including roads, utilities, lot delineation and identification, proposed structures, and common areas. b. The boundaries of 100-year floodplains, floodway fringes, and floodways. c. The proposed final topography at a contour interval appropriate to indicate drainage patterns. d. The boundaries of natural features or unique resource areas that will be left undisturbed or preserved including, but not limited to, wetlands, steep slopes, riparian corridors, and natural buffers (6) A grading plan which must include: a. A delineation of all proposed land-disturbing activities, including known off-site activities that will provide services to the project site. b. The location of all on-site soil stockpiles and borrow areas and, when known at the time of submittal, the location of all off-site borrow, soil stockpiles, and disposal areas. c. The existing and proposed topography. (7) A drainage plan which must include: a. The location, size, and dimensions of all stormwater drainage systems, such as culverts, storm sewers, and conveyance channels. b. The locations of specific points where concentrated stormwater and non-stormwater discharges will leave the project site. c. The locations where stormwater may be directly discharged into ground water, such as abandoned wells, sinkholes, or karst features. d. The name(s) of the receiving water(s) and, when the discharge is to a system (storm sewer, stormwater management measure, etc.) owned/or operated by a municipality, city, town, or county, the name of the system operator and the ultimate receiving water. e. The location, size, and dimensions of features, such as existing permanent retention or detention facilities, including manmade wetlands, designed for the purpose of stormwater management. (8) A SWPPP associated with construction activities. The plan must be designed and implemented to achieve the minimum performance requirements of Section 3.0 of the IDEM CSGP and must include: a. A description of the potential pollutant generating sources and pollutants, including all potential non-stormwater discharges that are associated with the construction activities, which may reasonably be expected to contribute pollutants to stormwater discharges. b. The location, dimensions, detailed specifications, and construction details of all temporary and permanent stormwater quality measures, including, but not limited to: i. Erosion control measures; ii. Sediment control measures; iii. Perimeter control measures; iv. Run-off control measures; v. Dewatering applications and management methods; vi. Measures utilized to cross water resources for the accessibility needed to perform construction; vii. Measures utilized to isolate or separate construction activities from work within waterbodies; and viii. Concrete and cementitious washout areas and management measures. c. Temporary stabilization and permanent stabilization plans, including the sequence of implementation planned to minimize the footprint of disturbed, unstable soil and the following information: i. Specifications and application rates for soil amendments and seed mixtures. ii. The type and application rate for anchored mulch, erosion control blanket, and other appropriate stabilization options. d. For each temporary stormwater measure, a maintenance standard, including a threshold of when each requires corrective action and/or replacement with alternative measures. e. The planned construction sequence describing the relationship between implementation of stormwater quality measures, including temporary and permanent stabilization and stages of construction activities. The sequence must include the measures that will be implemented prior to land disturbance in a specific drainage area and those that will be implemented as construction progresses throughout the life of the project. f. The provisions for erosion and sediment control on individual building lots regulated under the permit. g. A material handling and spill prevention and spill response plan meeting the requirements in 327 IAC 2-6. 1, including contact information for local emergency personnel and the IDEM Emergency Spill Line (888)233-7745 or (317)233-7745 h. The material handling and storage procedures associated with construction activity describing the management and disposal of construction products and waste. (9) Additional information as deemed necessary. Any additional information deemed necessary by the department of engineering where specific or unique site conditions warrant clarification identifying that the performance requirements of section 117-10, pertaining to nonagricultural land disturbing activity performance requirements, are met. (10) Signature of a "trained individual". The construction SWPPP must be signed by a trained individual as defined in section 117-2.
(Ord. No. 5902, § 1, 8-19-2024)