Sec. 117-40. - Content of post-construction stormwater pollution prevention plan.

The post-construction stormwater pollution prevention plan (SWPPP) must include, but not be limited to the following information, in accordance with IDEM's CSGP: (1) A description of potential pollutant generating sources and a list of pollutants from the proposed land use that may reasonably be expected to contribute pollutants to stormwater discharges. (2) A description of stormwater quality and stormwater management measures that will be installed to address post-construction sources that are expected to generate pollutants in stormwater discharges after construction activities have been completed. The measures selected should achieve, at a minimum, the following objectives: a. Stormwater quality measures that target pollutants of concern and are designed to remove or minimize pollutants from stormwater run-off that is associated with the final land use. b. Stormwater quality measures that will be implemented to prevent or minimize adverse impacts to aquatic resources including, but not limited to, wetlands, streams, karst features, and riparian habitats. c. Stormwater management measures that will address the potential impacts of increased run-off from the project. Measures must be designed and approved according to the CSGP and this chapter. A trained individual must approve that the design meets the applicable requirement(s). d. Measures, including structural and those based on low impact development principles, selected to address the pollutant(s) of concern, reduction of peak flows, and ability to infiltrate. e. Protective measures that will be implemented during active construction when the type of post-construction measure(s) planned are susceptible to pollutants, specifically sediment that may be generated during land-disturbing activities. (3) The location, dimensions, detailed specifications, and construction details of all post-construction stormwater quality and stormwater management measures. (4) A sequence describing when each post-construction stormwater measure will be installed in relation to project construction. (5) An operation and maintenance manual that includes a description of the maintenance guidelines for all post-construction stormwater measures to facilitate their proper long-term function. This operation and maintenance manual must be provided to city and any additional future parties who will assume responsibility for the operation and long-term maintenance of the post-construction stormwater measures. (6) When known at the time of plan submittal, the entity that will be responsible for operation and maintenance of the post-construction system. Additionally, the post construction stormwater pollution prevention plan must also include a long-term operation and maintenance agreement containing maintenance guidelines for all post-construction stormwater quality measures to facilitate their proper long-term function.

(Ord. No. 5902, § 1, 8-19-2024)