§ 164.05 — Administration
Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 164.05
Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/1a427604-4d57-4638-9f7f-8206d561d3c4
Sec. 164.05. - Administration.
(A) Drainage permit exclusions: The following actions shall not be considered a land alteration for the purpose of this chapter nor shall a drainage permit be required: (1) Excavation of cemetery graves; (2) Refuse disposal sites where storm drainage is controlled by other regulations; (3) Excavation for wells, excavation and backfills for poles, conduits and wires of utility companies; (4) Exploratory excavation or soil testing under the direction and control of professional engineers, soil engineers, geologists, civil engineers, architects or land surveyors, which are backfilled and which are restored to original contours; (5) Ordinary cultivation of agricultural land including tilling, terracing, construction of minor open ditches and crop irrigation; (6) The planting and tilling of gardens, flower beds, shrubs, trees and other common uses and minor landscaping of land appurtenant to residences; (7) Fill and grading of former basement site after the demolition of a structure, to conform to adjacent terrain; (8) Fill of small holes caused by erosion, settling of earth or the removal of such materials as dead trees, posts or concrete; (9) A fill less than one foot in depth, which has no impact on adjacent properties; (10) Maintenance of drainage facilities; (11) Installation of septic systems, when proper permit has been obtained; (12) Construction of a driveway, when a proper permit has been obtained; (13) Installation of individual building sewers, when a proper tap permit has been obtained; (14) A land alteration upon a lot in an approved subdivision plat, provided proper permits are obtained. (B) Drainage permits application: No person shall undertake or accomplish any land alteration without having in force a written drainage permit obtained from the city engineer. The drainage permit must be obtained before any work is initiated with the exception of testing to determine procedures or materials. In order to obtain a drainage permit, the applicant for same must be the person or entity that will in fact be responsible for accomplishing the land alteration for which the permit was issued. Applications for a drainage permit shall be filed in the office of the city engineer on forms prescribed by the board of public works and safety of the city. Within seven working days from the date of filing for a drainage permit, the city engineer shall either issue the permit or forward a written statement to the applicant indicating cause for non-issuance. The statement shall set forth all actions, information, and/or plan amendments necessary to allow issuance of a drainage permit. Approvals shall not be unduly withheld. A drainage permit shall be issued by the city engineer if: (1) The application and the drainage plan with supplemental information have been properly prepared and submitted and reflect compliance with the general drainage standards for the city. (2) A certificate of sufficiency of plan and a certificate of obligation to observe have been filed by a registered professional engineer, land surveyor or architect engaged in storm drainage design; (3) If required by the city engineer or another entity authorized to establish or enforce drainage requirements, a bond has been posted pursuant to the requirements of this chapter; (4) If required by the city engineer or another entity authorized to establish or enforce drainage requirements, a covenant has been executed pursuant to the requirements of this chapter; (5) If required by the city engineer or another entity authorized to establish or enforce drainage requirements, an easement has been dedicated pursuant to the requirements of this chapter; (6) The applicable fee has been paid. No drainage facility intended for public dedication shall be constructed until a drainage permit has been obtained from the city engineer. A drainage facility or system intended to be dedicated to the public, in whole or in part, must be accepted by the city by action of the board of public works and safety of the city, as applicable, and no such drainage facility or system shall be accepted unless it is found to be in conformance with this chapter.
(Ord. No. 21-02, § 6, 6-3-02)
Ask a question about Muncie law
Corpus searches the Muncie sections it holds and shows the ones that match, with their citations. Free, no sign-in.
