§ 164.13 — Professionally prepared and certified drainage plans

Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 164.13

Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/1196fd6d-c340-41ec-8aa9-bac4c79300ff

Sec. 164.13. - Professionally prepared and certified drainage plans.

A drainage plan fulfilling the requirements of this chapter shall be submitted to the office of the city engineer for approval before a drainage permit can be obtained to accomplish a land alteration. The drainage plan must be submitted in duplicate, and shall indicate in a precise manner the work to be accomplished, and said plans shall in all respects be consistent with the drainage plan submitted. One copy of the drainage plan will remain on file in the city engineer's office. The following information must be submitted for approval: (A) Construction features: The drainage plan shall demonstrate and describe surface and subsurface drainage and include the following: (1) The drainage plan shall be drawn to a commonly used scale, and an arrow indicating north shall appear as needed for clarity. Existing land contours shall be shown at an interval necessary for clarity. A bench mark, which is easily accessible and locatable, shall be shown. The bench mark shall be determined by USGS datum. (2) A map which indicates the location and vicinity of the proposed land alteration shall be included in the drainage plan. (3) The drainage plan shall show the locations of all existing and proposed drainage facilities. Storm drains and manholes and other structures shall be located in the plans by dimensions from traverse lines, property markers or road center lines. However, for areas where physical features are not available, coordinates of manholes and bearings of storm drains shall be based on the State of Indiana's coordinate system or other acceptable horizontal and vertical datum. If applicable, the drainage plan should show the direction of flow, elevation of inverts, gradient, size and capacity of existing and proposed storm drains. When using storm drains, the capacity shall be indicated. Profiles of the on-site construction shall be provided which show existing and proposed ground information and any proposed piping and structures. (4) Plan and profile information shall be provided for any constructed flow lines. The plan shall show appropriate right-of-way and easement limits. The profile shall be shown under the plan and shall extend a sufficient distance downstream of the outlet to allow any pertinent information concerning the outfall channel to be shown. The storm drain and inlet profile shall generally be drawn on a commonly used scale. Where a storm drain is located in an existing or proposed pavement or shoulder, the center line grade of the road shall be shown. Where a storm drain is located outside pavement or shoulder, the existing ground over the storm drain with proposed grading shall be shown. If the storm drain is to be constructed on fill, the profile of the undisturbed earth, at drain location, shall be shown. (B) Design calculations: Design calculations are required as part of the drainage plan and shall specifically include: (1) Estimation of existing and proposed storm water runoff conditions, with a drainage area map for the site and tributary area, shall be calculated utilizing storm conditions contained in the General Drainage Standards for the City of Muncie, Indiana. The drainage area map shall indicate contours at two-foot intervals and limits of the 100-year flood (USGS quad maps, or the Delaware County Watershed maps, or other contour maps where applicable). Weighted runoff coefficient computations and time of concentration computations indicating overland flow time and travel time in manmade structures shall be indicated. (2) Closed conduit and open channel design computations shall include the size of pipe or channel cross section, pipe or channel slope in percent, roughness coefficient, flowing velocities in feet per second, and design capacity in cubic feet per second. (3) Head loss computations in manholes and junction chambers. (4) Hydraulic gradient computations, wherever applicable. (5) Erosion control methods. Such design calculations shall conform with the standards of this chapter and all regulations promulgated thereunder. The city engineer shall be empowered to require additional information to be included in a drainage plan as is necessary to evaluate and determine the adequacy of the proposed drainage facility. (C) Certificates: All drainage plans submitted under this section to the city engineer's office for approval must be certified by a registered professional engineer, land surveyor or architect engaged in storm drainage design, under whose supervision the plans were prepared. The certificate shall be in the following form: _____ CERTIFICATE OF SUFFICIENCY OF PLAN Permit Number _______ Address where land alteration is occurring _____ _____ Plan Date _______ I hereby certify that to the best of my knowledge and belief: (1) The drainage plan for this project is in compliance with drainage requirements (as set forth in the Storm Drainage and Sediment Control chapter for the City of Muncie, Indiana) pertaining to this class of work. (2) The calculations, designs, reproducible drawings, masters and original ideas reproduced in this drainage plan are under my dominion and control and they were prepared by me and my employees. Signature___________ Date _______ Typed/Printed Name___________ (SEAL) Business Address___________ Surveyor _______ Engineer _______ Architect _______ Indiana Registration Number _______ All drainage plans submitted under this section to the city engineer's office must include a certificate of obligation to observe by a registered professional engineer, land surveyor or architect engaged in storm drainage design. The certificate shall be in the following form: CERTIFICATE OF OBLIGATION TO OBSERVE Permit Number _______ Address where land alteration is occurring _____ _____ Plan Date ___________ I will perform periodic observations of this project during construction to determine that such land alteration is in accordance with both the applicable drainage requirements and the drainage plan for this project submitted for a drainage permit to the Office of the City Engineer of the City of Muncie, Indiana. Signature ___________ Date _______ Typed/Printed Name ___________ Phone ___________ (SEAL) Business Address ___________ Surveyor _______ Engineer _______ Architect _______ Indiana Registration Number _______ Within ten (10) days after the completion of a land alteration for which a drainage permit was required and relative to which a certified plan was required to be filed pursuant to this section, a registered professional engineer, surveyor or architect engaged in storm drainage design, shall execute and file with the city engineer's office a certificate of completion and compliance. Such certificate shall be in the following form: CERTIFICATE OF COMPLETION AND COMPLIANCE Address of premises on which land alteration was accomplished _____ _____ Inspection Date(s) ___________ Permit Number ___________ Relative to plans prepared by ___________ On Date ___________ I hereby certify that: (1) I am familiar with drainage requirements applicable to such land alteration (as set forth in the Storm Drainage and Sediment Control Ordinance of the City of Muncie, Indiana); and (2) I have personally observed the land alteration accomplished pursuant to the above-referenced drainage permit; and (3) To the best of my knowledge, information and belief such land alteration has been performed and completed in conformity with all such drainage requirements, except _____ Signature ___________ Date _______ Type/Printed Name ___________ Phone _______ (SEAL) Business Address ___________ Surveyor _______ Engineer _______ Architect _______ Indiana Registration Number ___________ _____

(Ord. No. 21-02, § 13, 6-3-02)

Ask a question about Muncie law