For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50.47 — Schedule of tap-in and inspection fees

Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 50.47

Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/ffea1316-1277-4ead-91dd-286303d0c8c3

Sec. 50.47. - Schedule of tap-in and inspection fees.

(A) Owners of each lot, parcel of real estate, or buildings located in any territory, addition, platted subdivision, or unplatted lands lying within the limits of the sanitary district shall be charged as follows for connecting into an existing sanitary sewer. Connection Size | Tap-in Fee (per tap) | Inspection Fee 6-inch diameter or less | $400.00 | $25.00 8-inch diameter | 700.00 | 25.00 10-inch diameter | 1,100.00 | 25.00 12-inch diameter | 1,600.00 | 25.00 15-inch diameter or larger | 2,500.00 | 25.00 (B) Owners of each lot, parcel of real estate, or buildings located in any territory, addition, platted subdivision, or unplatted lands lying outside the limits of the sanitary district shall be charged as follows for connecting into an existing sanitary sewer which is a part of the sanitary district's sewage system. Connection Size | Tap-in Fee (per tap) | Inspection Fee 6-inch diameter or less | $1,000.00 | $25.00 8-inch diameter | 1,750.0 | 25.00 10-inch diameter | 2,750.00 | 25.00 12-inch diameter | 4,000.00 | 25.00 15-inch diameter or larger | 6,250.00 | 25.00 (C) Owners of each lot, parcel of real estate, or buildings located in any territory, addition, platted subdivision, or unplatted lands lying inside or outside the limits of the sanitary district shall be charged as follows for connecting into an existing storm water sewer. Connection Size | Tap-in and Inspection Fee All connections | $25.00 (D) When property owners are assessed for benefits received from the new construction of local and/or trunk-line sewers, the applicable tap-in and inspection fees shall be waived if the subject connection is made within 90 days from the date of final project completion, inspected by the project representative and approved. Any and all revenue resulting from these charges shall be placed in the cumulative building and sinking fund to provide funds for the construction of new sanitary and storm sewers. (E) When property owners are charged a tap-in fee, a minimum of one-fourth of the total amount charged must be made at the time of issuance of the tap-in permit. The remaining balance shall be payable at six percent simple interest on the unpaid balance and three equal installments shall be made on the principal amount, all to be collected on the anniversary date of the initial issuance of the tap-in permit by the city controller or his authorized agents at the controller's office in city hall. Any failure of the property owner to pay said tap-in fee and/or interest shall result in a lien being placed against the real estate serviced by the tap-in.

(Ord. No. 145-76, 4-5-76)

Ask a question about Muncie law

Corpus searches the Muncie sections it holds and shows the ones that match, with their citations. Free, no sign-in.