For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 53.43 — Baseline monitoring reports

Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 53.43

Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/e9f36b57-b930-47c2-818f-82cce84c4052

Sec. 53.43. - Baseline monitoring reports.

(A) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6 (a)(4), whichever is later, existing SIUs subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the bureau a report which contains the information listed in paragraph (B) below. At least 90 days prior to commencement of their discharge, new sources, and sources that become IUs subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the bureau a report which contains the information listed in paragraph (B) below A new source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. (B) The IU shall submit the information required by this section including: (1) Identifying information. The name and address of the facility including the name of the operator and owners. (2) Wastewater discharge permits. A list of any environmental control wastewater discharge permits held by or for the facility. (3) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such IU. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. (4) Flow measurement. Information showing the measured average, or estimated, if approved by the director, daily and maximum flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). (5) Measurement of pollutants. (a) Identify the categorical pretreatment standards applicable to each regulated process. (b) Submit the results of sampling and analysis identifying the nature and concentration (and/or mass), where required by the standard or by the bureau, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long term average concentrations (or mass, where required) shall be reported. Samples shall be representative of daily operations, taken immediately downstream from the pretreatment facilities; or if no pretreatment facilities exist, immediately downstream from the regulated process. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the IU shall measure the flows and concentrations necessary to allow use of the combined wastestream formula 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternative concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the bureau. (c) Analysis shall be performed in accordance with section 53.52. (d) Sampling shall be performed in accordance with section 53.53. (e) The director may allow the submission of a baseline report which utilizes only historical data as long as the data provide sufficient information to determine the need for the industrial pretreatment measures. (f) The baseline report shall indicate the time, date and place of sampling, methods of analysis, and shall certify that such sampling and analysis is representative of the normal working cycles and expected pollutant discharges to the POTW. (6) Certification. A statement reviewed by the IU's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. (7) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standard; the shortest schedule by which the IU will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 53.44. (8) All baseline monitoring reports must be signed and certified in accordance with section 53.33.

(Ord. No. 1-11, § 1(Exh. A), 2-7-11)

Ask a question about Muncie law

Corpus searches the Muncie sections it holds and shows the ones that match, with their citations. Free, no sign-in.