For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-24 — Permits

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 6-24

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/d73c3800-92b7-418c-a3ed-ebb0ab6f34b4

Sec. 6-24. - Permits.

(a) Required in advance. No person shall perform or cause to be performed the installation or alteration of any electrical wiring or equipment, including fire alarm systems on or within any building, structure or premises within the City without obtaining, in advance, a permit from the Department. (b) Where a person shall unlawfully proceed to do any work or installation without a permit as required herein, the applicable permit fee shall be tripled as a penalty. The payment of such penalty shall not release the person in default from any other penalties provided herein, nor from compliance with any relevant provisions of the Municipal Code. (c) Fees. Each application for a permit for installation or alteration of electrical wiring or equipment shall be accompanied by fees in accordance with the schedule below; with a minimum permit fee of sixty dollars ($60.00): (1) Temporary service for construction: All amperage .....$7.00 (2) Switchboards and panel boards each, new and replaced: ..... 60-amp .....$7.00 100-amp .....$9.00 200-amp .....$12.00 400-amp .....$15.00 600-amp .....$20.00 Over 600-amp to 2,000-amp .....$25.00 Over 2,000-amp .....$50.00 (3) Circuits (new or replaced): ..... a. Each circuit .....$5.00 (4) Horsepower (machinery): ..... a. First hp .....$7.00 b. Each additional hp .....0.25 (5) Backup generator: ..... a. 10 Kv or less .....$60.00 b. Over 10 Kv .....$70.00 (6) Pool wiring and/or bonding .....$60.00 (7) Repair, extension, and/or maintenance of wiring .....$60.00 (8) Reset, relocation, reconnect fees, each .....$60.00 (9) Fire alarm systems (commercial) .....$60.00 (10) Each reinspection fee .....$60.00 (11) Each additional final inspection .....$60.00 If the exact number of circuits or horsepower is unknown at the time of the application for a permit, a permit may be taken for the minimum amount known with new permits issued as the extent of the work is known. (12) Solar array $60.00 + percentage of the construction cost of whole project, as established by the Department's fee schedule. (13) Electrical vehicle device $60.00 per device.

(Ord. No. 8243-92, § 1; Ord. No. 8931-98, § 5; Ord. No. 9528-04, § 9; Ord. No. 9779-07, § VII, 8-27-07; Ord. No. 9902-09, § VI, 2-9-09; Ord. No. 10137-11, § V, 12-12-11; Ord. No. 10394-15, § VII, 10-26-15; Ord. No. 11211-25, § I, 6-23-25)

Ask a question about South Bend law

Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.