Sec. 6-25. - Inspections.
(a) All electrical wiring and equipment installations and alterations requiring a permit shall be inspected by the Electrical Inspector. The permit holder shall notify the Electrical Inspector at least twenty-four (24) hours in advance of the time the work is ready for inspection. If the work does not pass inspection, a reinspection fee of sixty dollars ($60.00) shall be charged for each future inspection of that stage of work. (b) When any electrical wiring or equipment will be hidden from view by the permanent placement of parts of the building or structure, the permit holder shall notify the Electrical Inspector when that stage of work is completed and shall not conceal the work until it has been inspected and approved by the Electrical Inspector; provided, that on large installations where the concealment of wiring or equipment proceeds continuously, the permit holder shall give the Electrical Inspector twenty-four (24) hours' notice, excluding Saturdays, Sundays, and holidays, and the Electrical Inspector shall make inspections periodically during the progress of the work. (c) Upon finding the installation or alteration of electrical wiring or equipment to be in conformity with the provisions of the Indiana Electrical Code and of the Building Code, the Electrical Inspector shall issue to the permit holder an inspection report and release, with a duplicate copy for delivery to the owner, authorizing the use of the installation or alteration and connection to the supply of electricity. In addition, the Electrical Inspector shall send written notice of such release to the electric utility. (d) When the Electrical Inspector issues an inspection report and release authorizing the connection and use of a temporary installation, the release shall be issued to expire at a time to be stated therein. The Electrical Inspector may revoke temporary installation releases, in compliance with Section 6-21.
(Ord. No. 8243-92, § 1; Ord. No. 8566-94, § 2; Ord. No. 10137-11, § VI, 12-12-11; Ord. No. 10394-15, § VIII, 10-26-15; Ord. No. 11211-25, § I, 6-23-25)
Ask a question about South Bend law
Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.