For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-195 — General performance criteria for stormwater management

Code of Ordinances of the City of Garden City, Kansas (Codified through Ordinance No. 3053-2026, enacted August 4, 2026. (Supp. No. 36, 1-27, Update 1)) · Garden City Code of Ordinances § 38-195

Corpus is an independent public-information project, not the official City of Garden City website. Stable reference: corpuslaw.us/code/902debc9-bd93-4ba6-8627-674eaa2fc8a4

Sec. 38-195. - General performance criteria for stormwater management.

The following performance criteria shall be addressed for stormwater management at all sites, unless a waiver has been granted as provided by the governing body: (1) All site designs shall establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. (2) All stormwater runoff generated from new development shall not discharge stormwater directly into a jurisdictional body of water without adequate stormwater management practices. Where such discharges are proposed, the impact of the proposal on wetland functional values shall be assessed using a method acceptable to the city engineer. In no case shall the impact on functional values be any less than allowed by the Army Corps of Engineers (ACE) or the Kansas Department of Health and Environment (KDHE) responsible for natural resources. (3) Annual groundwater recharge rates shall be maintained, by promoting infiltration through the use of structural and nonstructural methods. At a minimum, annual recharge from the post-development site shall mimic the annual recharge from pre-development site conditions. (4) For new development, structural stormwater treatment practices shall be designed to remove 85 percent of the average annual post-development total suspended solids load (TSS). It is presumed that a SMP complies with this performance standard if it is: A. Sized to capture the prescribed water quality volume (WQv), B. Designed according to the specific performance criteria outlined in the Post-Construction Stormwater Best Management Practices Manual, City of Garden City, 2009, C. Constructed properly, and D. Maintained regularly. (5) To protect stream channels from degradation, specific channel protection criteria shall be provided as prescribed in the post-construction stormwater manual. (6) Stormwater discharges to critical areas with sensitive resources may be subject to additional performance criteria or may need to utilize or restrict certain stormwater management practices. (7) Certain industrial sites are required to prepare and implement a stormwater pollution prevention plan, and shall file a notice of intent (NOI) under the provisions of the National Pollutant Discharge Elimination System (NPDES) general permit. The stormwater pollution prevention plan requirement applies to both existing and new industrial sites. (8) Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as hot spots, may require the use of specific structural SMPs and pollution prevention practices. (9) Prior to design, applicants are required to consult with the city engineer to determine if they are subject to additional stormwater design requirements. (10) The calculations for determining peak flows as found in the post-construction stormwater manual shall be used for sizing all stormwater management practices.

(Ord. No. 2456-2009, § 1, 8-18-09)

Ask a question about Garden City law

Corpus searches the Garden City sections it holds and shows the ones that match, with their citations. Free, no sign-in.