For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-196 — Basic stormwater management design criteria

Code of Ordinances of the City of Garden City, Kansas (Codified through Ordinance No. 3053-2026, enacted August 4, 2026. (Supp. No. 36, 1-27, Update 1)) · Garden City Code of Ordinances § 38-196

Corpus is an independent public-information project, not the official City of Garden City website. Stable reference: corpuslaw.us/code/3ab0ed0c-286d-4f66-9a06-0ba89e95653d

Sec. 38-196. - Basic stormwater management design criteria.

(a) Minimum control requirements. All stormwater management practices will be designed so that the specific storm frequency storage volumes as identified in the post-construction stormwater manual are met, unless the governing body grants the applicant a waiver or the applicant is exempt from such requirements. In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the city engineer reserves the right to impose any and all additional requirements deemed necessary to control the volume, timing, and rate of runoff. (b) Site design feasibility. Stormwater management practices for a site shall be chosen based on the physical conditions of the site. Among the factors that should be considered: (1) Topography. (2) Maximum drainage area. (3) Depth to the water table. (4) Soils. (5) Slopes. (6) Terrain. Applicants shall consult the post-construction stormwater manual for guidance on the factors that determine site design feasibility when selecting a stormwater management practice. (c) Conveyance issues. All stormwater management practices shall be designed to convey stormwater to allow for the maximum removal of pollutants and reduction in flow velocities. This shall include, but not be limited to: (1) Maximizing of flow paths from inflow points to outflow points. (2) Protection of inlet and outfall structures. (3) Elimination of erosive flow velocities. (4) Providing of under-drain systems, where applicable. The post-construction stormwater manual shall provide detailed guidance on the requirements for conveyance for each of the approved stormwater management practices. (d) Geometry conditions. All stormwater management practices shall be designed to capture and manage stormwater runoff according to the specifications outlined in the post-construction stormwater manual. These specifications designate the water quantity and quality criteria that apply to an approved stormwater management practice. (e) Landscaping plans required. All stormwater management practices must have a landscaping plan detailing both the vegetation to be in the practice and how and who will manage and maintain this vegetation. (f) Maintenance agreements. All stormwater management practices shall have an enforceable operation and maintenance agreement to ensure the system functions as designed. This agreement will include any and all maintenance easements required to access and inspect the stormwater management practices, and to perform routine maintenance as necessary to ensure proper functioning of the stormwater management practice. In addition, a legally binding covenant specifying the parties responsible for the proper maintenance of all stormwater management practices shall be secured prior to issuance of any permits for land disturbance activities. (g) Nonstructural stormwater practices. The use of nonstructural stormwater management practices is encouraged in order to minimize the reliance on structural practices. Credit in the form of reductions in the amount of stormwater that must be managed can be earned through the use of nonstructural practices that reduce the generation of stormwater from the site. These nonstructural practices are explained in detail in the post-construction stormwater manual and applicants wishing to obtain credit for use of nonstructural practices must ensure that these practices are documented and remain unaltered by subsequent property owners.

(Ord. No. 2456-2009, § 1, 8-18-09)

Ask a question about Garden City law

Corpus searches the Garden City sections it holds and shows the ones that match, with their citations. Free, no sign-in.