§ 24-43 — Building permits and land disturbance permits—Closure
Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 24-43
Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/5b4c3966-0512-4f65-ae61-afd4bf53ca5c
Sec. 24-43. - Building permits and land disturbance permits—Closure.
(a) Closure of a building permit shall be completed in accordance with the provisions of this article. In cases where there is not a separate land disturbance permit issued for a particular site, a final certificate of occupancy shall not be issued until the site has been permanently stabilized and all temporary BMPs removed and all drainage and grading is found to be in compliance with this Code. (b) Closure of a land disturbance permit is independent of closure of other permits. If a site has been partially stabilized, a land disturbance permit can be closed upon issuance of a subsequent land disturbance permit covering remaining unstabilized areas. Closure of a land disturbance permit shall be completed by obtaining a satisfactory final inspection and issuance of a certificate of compliance. Timing of final inspections for land disturbance permits shall conform to the following: (1) For single-family or two-family construction only, where the permit holder seeks closure of the entire site subject to the permit, a final inspection can be completed after eighty (80) percent of the housing units in the associated final plat have received final certificates of occupancy, or a minimum of three (3) years after issuance of the first building permit for a housing unit. Additionally, no final inspection can be made before any temporary BMPs serving more than one (1) lot are no longer needed and are removed. (2) For development other than single-family or two-family residential development, a final inspection can occur when all temporary BMPs serving more than one (1) lot are no longer needed and are removed. (3) For single-family or two-family construction only, the holder of a land disturbance permit that includes multiple lots shall no longer be responsible for activities that occur on an individual lot for which all dwellings have received certificates of occupancy. In that event there shall be a final inspection of that lot and partial closure of the land disturbance permit prior to or at the time of issuance of a certificate of occupancy.
(Ord. No. 10-10545, § 1, 5-24-10)
Ask a question about Salina law
Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.
