§ 24-48 — Design requirements
Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 24-48
Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/a069828d-834d-4b46-9151-774f60fe0f28
Sec. 24-48. - Design requirements.
(a) Erosion and sediment control plan designs shall be based on, but not limited to, the following principles: (1) Erosion and sediment control plans shall incorporate the following elements: a. Soil stabilization shall be completed within five (5) days of clearing or inactivity in construction. b. Fit the development to existing site conditions. c. Stabilize disturbed areas. d. Minimize the extent of exposure. e. Minimize duration of exposure. f. Inspection and maintenance of control measures. g. Use of performance measures and outcomes. h. Timely employment and maintenance of all measures. i. Break work activities into phases when possible. j. If seeding or another vegetative erosion control method is used, it shall become established within two (2) weeks or the city engineer may require the site to be reseeded or a nonvegetative option employed. k. When possible, protect disturbed areas from any unnecessary run-on off stormwater from adjacent sites, at least during the construction period. l. Special techniques that meet the design criteria on steep slopes or in drainage ways shall be used to ensure stabilization. m. Soil stockpiles must be stabilized or covered at the end of each workday. n. The entire site must be stabilized, using a heavy mulch layer or another method that does not require germination to control erosion, at the close of the construction season. o. Techniques shall be employed to prevent the blowing of dust or sediment from the site. p. Techniques that divert upland runoff past disturbed slopes shall be employed. q. Keep runoff velocities low. r. Retain sediment on the site. (2) Sediment control techniques may include: a. Settling basins, sediment traps, or tanks and perimeter controls. b. Settling basins that are designed in a manner that allows adaptation to provide long term stormwater management, if required by the city engineer. c. Protection for adjacent properties by the use of a vegetated buffer strips in combination with perimeter controls. (3) Other pollutants. In addition to sediment, the erosion and sediment control plan shall provide for the control of other pollutants related to the land disturbance activity that might cause an adverse impact to water quality, including, but not limited to, discarded building materials, concrete truck washout, fuel, hydraulic fluids, chemicals, litter, and sanitary wastes. (4) Waterway and watercourse protection requirements. Waterway and watercourse protection requirements shall include: a. A temporary stream crossing installed and approved by the city engineer if a wet watercourse will be crossed regularly during construction. b. Stabilization of the watercourse channel before, during, and after any in-channel work. c. Appropriate design of all on-site stormwater conveyance channels. d. Stabilization adequate to prevent erosion located at the outlets of all pipes and paved channels. (5) Construction site access requirements shall include: a. A temporary access road provided at all sites. b. Other measures required by the city engineer in order to ensure that sediment is not tracked onto public streets by construction vehicles or washed into storm drains. (b) Erosion and sediment control standards. The city engineer may adopt and maintain erosion and sediment control standards to assist in the administration of this article.
(Ord. No. 10-10545, § 1, 5-24-10)
Ask a question about Salina law
Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.
