§ 35-303 — Project work standards
Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 35-303
Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/cade7280-77ab-434d-bf1f-222657f61d9d
Sec. 35-303. - Project work standards.
(a) All project work shall comply with the requirements of this article and the terms and conditions of any right-of-way permit issued in connection with such project work. (b) Prior to the commencement of any excavation, a ROW-user shall: (1) Identify and locate any underground facilities to be spray painted according to the Uniform Color Code required by the Kansas One Call system, and notice shall also be provided directly to the city's utilities department; and (2) At the discretion of the director of public works, stake the route(s) to confirm the horizontal location and vertical elevation of any water, sanitary sewer and storm sewer lines along the route, and obtain the city's approval of such horizontal and vertical locations prior to beginning excavation or installation of any facilities. (c) The ROW-user shall not at any one time excavate more of the right-of-way than shall be reasonably necessary to enable the ROW-user to complete the project work in the most expeditious manner. Except in cases of an emergency or with approval of the director of public works, no right-of-way work may be done when conditions are unreasonable for such work. (d) The ROW-user shall not disrupt a right-of-way in any manner which causes interference with the natural free and clear passage of water through the gutters or other waterways. (e) The ROW-user shall notify the city no less than three (3) working days in advance of any construction, reconstruction, repair, location or relocation of facilities which would require any street closure or which reduces traffic flow to less than two (2) lanes of moving traffic for more than four (4) hours. Except in the event of an emergency, no such closure shall take place without notice and prior authorization from the city. (f) To minimize disruption to traffic, non-emergency work on arterial streets shall not be performed during the hours of 7:00 a.m. to 8:30 a.m. and 4:00 p.m. to 6:00 p.m., or on holidays or weekends, unless prior approval is received from the director of public works. In any event, the ROW-user shall perform work on the right-of-way at such times that will allow the least interference with the normal flow of traffic and the peace and quiet of the neighborhood. (g) All work performed in the right-of-way or which in any way impacts vehicular or pedestrian traffic shall be properly signed, barricaded, and otherwise protected at the ROW-user's expense. The ROW-user shall also be responsible for providing adequate traffic control and passage to the surrounding area as determined by the director of public works. Such signage, barriers, and traffic control shall be in conformance with the latest edition of the Manual on Uniform Traffic Control Devices, as applicable. (h) The ROW-user shall use excavatable, low-strength flowable fill as backfill on any street cut. This requirement may be waived or changed when appropriate in the discretion of the director of public works. In such event, the director of public works may require the ROW-user to employ an approved testing laboratory, which shall certify the proper back-filling on any street cut. The ROW-user shall pay all costs associated with such testing. (i) If an excavation cannot be back-filled immediately and is left unattended, the ROW-user shall secure the unfilled excavation. The ROW-user has sole responsibility for maintaining proper barricades, safety fencing and lights as required, from the time of opening of the excavation until the excavation is surfaced and opened for travel. (j) Upon completion of an excavation to install new underground facilities, the ROW-user shall insert a metal marker or other approved marking device into the excavation of the restored pavement, which shall identify the ROW-user's presence in the right-of-way. (k) The director of public works shall, from time to time, prepare standard plans and specifications for the making of excavations in the right-of-way, for the making of pavement cuts and for refilling and tamping the same, and for repairing and restoring pavement, which shall be filed in the offices of the city clerk and the city engineer, and it shall be a condition of any permit issued under this article that the ROW-user shall comply in all respects with all such standard plans and specifications. (l) All facilities and other appurtenances laid, constructed and maintained by the ROW-user shall be laid, constructed and maintained in accordance with acceptable engineering practice and in full accord with any and all applicable engineering codes and in accordance with applicable all applicable rules and regulations of the KCC and any other local, state or federal agency having jurisdiction over the parties. (m) Except as otherwise specifically requested by an applicant and approved by the city in the issued right-of-way permit, all technical standards governing construction, reconstruction, installation, operation, testing, use, maintenance, and dismantling of a ROW-user's facilities in the right-of-way shall be in accordance with applicable federal, state and local law and regulations, including those promulgated by national trade associations commonly associated with the utility service provided by the ROW-user. It is understood that the standards established in this paragraph are minimum standards and the requirements established or referenced in this article may be in addition to or stricter than such minimum standards. The director of public works may require that any drawings, plans and/or specifications submitted be certified by a Kansas registered professional engineer stating that such drawings, plans and/or specifications comply with all applicable technical codes, rules and regulations, unless such plans are based directly on nationally recognized codes, which are appropriately cited, and attested to on the plans by the signature of an authorized official of the organization applying for the permit.
(Ord. No. 14-10740, § 1, 7-28-14)
Ask a question about Salina law
Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.
