For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-1-2-AF103 — AF103. - Amendment to Section AF103 of the IRC

Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 8-1-2-AF103

Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/6dd03aea-0486-4bdf-bd57-410f6f8f2068

Sec. 8-1-2-AF103. - Amendment to Section AF103 of the IRC.

Section AF103 of the IRC is amended to read as follows: Section AF103 - REQUIREMENTS AF103.1 General. The following construction techniques are intended to resist radon entry and prepare the building for post-construction radon mitigation. AF103.2 Subfloor preparation. A layer of gas-permeable material shall be placed under all concrete slabs and other floor systems that directly contact the ground and are within the walls of the living spaces of the building, to facilitate future installation of a sub-slab depressurization system, if needed. The gas-permeable layer shall consist of one of the following: 1. A uniform layer of clean aggregate, a minimum of 4 inches (102mm) thick. The aggregate shall consist of material that will pass through a 2-inch (51mm) sieve and be retained by a 1/4-inch (6.4 mm) sieve. 2. A uniform layer of sand (native or fill), a minimum of 4 inches (102 mm) thick, overlain by a layer or strips of geotextile drainage matting designed to allow the lateral flow of soil gases. As an alternative to the geotextile material, interior perimeter drain tile connected to the sealed sump pit may be used. 3. Other materials, systems or floor designs with demonstrated capability to permit depressurization across the entire sub-floor area. AF103.4.8 Ducts. Ductwork passing through or beneath a slab shall be of seamless material unless the air-handling system is designed to maintain continuous positive pressure within such ducting. Joints in such ductwork shall be sealed to prevent air leakage. Ductwork located in crawl spaces shall have all seams and joints sealed by closure systems in accordance with Section 603.12 of the UMC.

(Ord. No. 25-11267, § 1, 12-8-25)

Ask a question about Salina law

Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.