For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-4 — Administration

Municipal Code of the City of Owensboro, Kentucky (Codified through Ordinance No. 13-2026, adopted June 16, 2026. (Supp. No. 54, Update 2)) · Owensboro Municipal Code, App. F, art. XVIII, § 18-4

Corpus is an independent public-information project, not the official City of Owensboro website. Stable reference: corpuslaw.us/code/4f37b0c6-2029-415d-b92e-e647237ccde4

18-4. - Administration.

18-4(a) Designation of Building Inspector as Local Administrator. The building inspector is hereby appointed as the Floodplain Administrator to administer and implement the provisions of this article. 18-4(b) Permit Procedures. Application for a development or construction permit for any development within any area of special flood hazard or along any watercourse shall be made to the Floodplain Administrator on forms furnished by him or her prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities, and the location of the foregoing. Specifically, the following information is required: (1) Application Stage. (a) Proposed elevation in relation to mean sea level (MSL) of the proposed lowest floor (including basement) of all structures in all Zone A's and elevation of highest adjacent grade; or. (b) Proposed elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed. (c) All appropriate certifications from a licensed professional engineer, surveyor or architect that the nonresidential flood-proofed structure will meet the flood-proofing criteria in Subsection 18-5(b)(2). (d) Description of the extent to which any watercourse and/or it associated flood plain will be altered (filled or excavated) or relocated as a result of the proposed development. (e) The Floodplain Administrator may require the applicant to secure a permit from the Kentucky Division of Water (under KRS 151.250), prior to issuance of a local development permit or building permit. Subdivision plats, development plans, or site plans that have received local approval prior to issuance of a permit by the Division of Water may require local reapproval if substantial changes to those plans are required by the Division of Water. (2) Construction Stage. (a) Upon placement of the lowest floor, and before construction continues, or flood proofing by whatever construction means, it shall be the duty of the permit holder to submit to the Floodplain Administrator and to the state a certification of the elevation of the lowest floor or flood-proofed elevation, as built, in relation to mean sea level. In AE, A1-30, AH, and A Zones where the community has adopted a regulatory base flood elevation, said certification shall be prepared by or under the direct supervision of a registered land surveyor, licensed professional engineer, or architect and certified by same. (b) When flood proofing is utilized for a particular structure, said certification shall be prepared by or under the direct supervision of a licensed professional engineer, surveyor or architect. (c) Any continued work undertaken prior to the submission of the certification shall be at the permit holder's risk. The Floodplain Administrator shall review the lowest floor and flood proofing elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. (d) Failure to submit the survey or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project. (3) Conditional Uses Permitted in the FW District. Conditional uses permitted in the FW District (floodway) by Subsection 18-6(b)(2) shall require the issuance of a conditional use permit by the Owensboro Metropolitan Board of Adjustment prior to the issuance of any development or construction permits, and shall be subject to the following requirements: (a) Required Findings. The Board of Adjustment in its review of a proposed conditional use must find that all flood hazard reduction provisions of Subsection 18-5(b) (4) can be met. (b) Storage of Material or Equipment. The storage or processing of material is prohibited if, in time of flooding, it is buoyant, flammable, explosive, or could otherwise be injurious to human, animal, or plant life. Storage of other material or equipment may be allowed if not subject to major damage by floods and firmly anchored to prevent flotation, or if readily removable from the area within the time available after flood warning. (c) Other Required Permits. All other permits as may be required by the Army Corps of Engineers or the Kentucky Division of Water must be obtained prior to the board of adjustment's issuance of a conditional use permit. 18-4(c) Duties and Responsibilities of the Floodplain Administrator. The Floodplain Administrator and/or staff is hereby appointed, authorized and directed to administer, implement and enforce the provisions of this ordinance. The Floodplain Administrator is further authorized to render interpretations of this ordinance, which are consistent with its spirit and purpose by granting or denying development permits in accordance with its provisions. Duties of the Floodplain Administrator shall include, but not be limited to: (1) Review all development permits to assure that the permit requirements of this article have been satisfied. (2) Advise permittee that additional federal or state permits may be required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained on file with the development permit. (3) Notify adjacent communities and the Kentucky Division of Water prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency and the Federal Insurance Administration. (4) Assure that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished. (5) Verify and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, in accordance with Subsection 18-4(b)(2). (6) Verify and record the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been flood-proofed, in accordance with Subsection 18-4(b)(2). (7) When flood-proofing is utilized for a particular structure, the Floodplain Administrator shall obtain certification from a licensed professional engineer, surveyor or architect, in accordance with Subsection 18-5(b)(2). (8) Where interpretation is needed as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the Floodplain Administrator shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (9) When base flood elevation data have not been provided in accordance with Subsection 18-3(b), then the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer the provisions of Section 18-5. (10) All records pertaining to the provisions of this Article shall be maintained in the office of the Floodplain Administrator and shall be open for public inspection. (11) Right of Entry. (a) Whenever necessary to make an inspection to enforce any of the provisions of this ordinance, or whenever the Floodplain Administrator has reasonable cause to believe that there exists in any structure or upon any premises any condition or ordinance violation which makes such building, structure or premises unsafe, dangerous or hazardous, the Floodplain Administrator may enter such building, structure or premises at all reasonable times to inspect the same or perform any duty imposed upon the Floodplain Administrator by this ordinance. (b) If such structure or premises are occupied, he/she shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he shall first make a reasonable effort to locate the owner or other persons having charge or control of such request entry. (c) If entry is refused, the Floodplain Administrator shall have recourse to every remedy provided by law to secure entry. (d) When the Floodplain Administrator shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the administrator for the purpose of inspection and examination pursuant to this ordinance. (12) Stop Work Orders. (a) Upon notice from the Floodplain Administrator, work on any building, structure or premises that is being done contrary to the provisions of this ordinance shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. (13) Revocation of Permits (a) The Floodplain Administrator may revoke a permit or approval, issued under the provisions of this ordinance, in case there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based. (b) The Floodplain Administrator may revoke a permit upon determination by the administrator that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the structure for which the permit was issued is in violation of, or not in conformity with, the provisions of this ordinance. (14) Liability. (a) Any officer, employee, or member of the Floodplain Administrator's staff, charged with the enforcement of this ordinance, acting for the applicable governing authority in the discharge of his duties, shall not thereby render himself personally liable, and is hereby relieved from all personal liability, for any damage that may accrue to persons or property as a result of any act required or permitted in the discharge of his duties. Any suit brought against any officer, employee, or member because of such act performed by him or her in the enforcement of any provision of this ordinance shall be defended by the department of law until the final termination of the proceedings. (15) Expiration of Floodplain Construction Permit. (a) A floodplain construction permit, and all provisions contained therein, shall expire if the holder of a floodplain construction permit has not commenced construction within three hundred sixty five days (365) calendar days from the date of its issuance by the Kentucky Division of Water. 18-4(d) Administrative Appeals. Appeals to the Board of Adjustment may be taken by any person or entity claiming to be injuriously affected or aggrieved by an official action, order, requirement, interpretation, grant, refusal, or decision of the Floodplain Administrator. Such administrative appeal shall be taken within thirty (30) days after the appellant or his agent receives notice of the action of the Floodplain Administrator, by filing with the Floodplain Administrator and with the Board of Adjustment a notice of appeal specifying the grounds thereof, and giving notice of such appeal to any and all parties of record. The Floodplain Administrator shall forthwith transmit to the Board of Adjustment all papers constituting the record upon which the action appealed from was taken and shall be treated as and be the respondent in such further proceedings. At the public hearing on the appeal held by the Board of Adjustment, any interested person may appear and enter his/her appearance, and all shall be given an opportunity to be heard. 18-4(e) Variance Procedures. The Board of Adjustment as established by the local governmental bodies shall hear and decide requests for variances from the requirements of this article. (1) Variances may be issued for the repair or rehabilitation of historic structures (see definition) upon determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure. (2) In passing upon such applications, the Board of Adjustment shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this article, and: (a) the danger that materials may be swept onto other lands to the injury of others; (b) the danger to life and property due to flooding or erosion damage; (c) the susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (d) the importance of the services provided by the proposed facility to the community; (e) the necessity to the facility of a waterfront location, in the case of a functionally dependent facility; (f) the availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; (g) the compatibility of the proposed use with existing and anticipated development; (h) the relationship of the proposed use to the comprehensive plan and flood plain management program for that area; (i) the safety of access to the property in times of flood for ordinary and emergency vehicles; (j) the expected heights, velocity, duration, rate of rise and sediment transport of the flood waters expected at the site; and, (k) the costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water systems, and streets and bridges. (3) Upon consideration of the factors listed above and the purposes of this article, the Board of Adjustment may attach such conditions to the granting of variances as it deems necessary to further the purposes of this article. (4) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (5) Conditions for Variances. (a) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazards, to afford relief; and in the instance of a historical building, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building. (b) Variances shall only be issued upon (i) a showing of good and sufficient cause; (ii) a determination that failure to grant the variance would result in exceptional hardship to the applicant; and (iii) a determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. (c) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation to which the structure is to be built and stating that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. (d) The Owensboro Metropolitan Planning Commission shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request. 18-4(f) Appeals from Final Action of the Board of Adjustment. Any person or entity claiming to be injured or aggrieved by any final action of the Board of Adjustment shall appeal from the action to the Circuit Court of Daviess County. Such appeal shall be taken within thirty (30) days after the final action of the Board of Adjustment. All final actions which have not been appealed within thirty (30) days shall not be subject to judicial review. The Board of Adjustment shall be a party in any such appeal filed in the circuit court.

(Ord. No. 16-2009, § 2, 5-5-2009)

Ask a question about Owensboro law

Corpus searches the Owensboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.