Sec. 6-63. - System construction schedule.
The franchise shall specify the rebuild or the initial construction timetable. The timetable shall be a monthly schedule by neighborhood sections of the city, if feasible.
(Ord. No. 8-94, § VII(7.3), 3-29-94)