Sec. 6-69. - Tests and performance monitoring.
(a) Completion Tests. Not later than thirty (30) days after any new or substantially rebuilt portion of the system is made available for service to subscribers, but not more frequently than once every six (6) months during system construction or rebuild and thereafter in accordance with FCC regulations, the grantee shall conduct technical performance tests to demonstrate full compliance with all technical standards contained in this article and the franchise, and the technical standards and guidelines of the FCC. (b) Methodology. Such tests shall be performed by, or under the direction of an engineer on the grantee's corporate staff. A copy of the report shall be submitted to the city, describing test results, instrumentation, calibration, and test procedures, and the qualification of the engineer responsible for the tests. (c) Test Points. System monitor test points shall be established at or near the output of the last amplifier in the longest feeder line, at or near trunk line extremities. Such periodic tests shall be made at the test points as shall be required by the FCC. (d) FCC Tests. In addition to the performance test reports required herein, a copy of any performance test reports required by the FCC shall be submitted to the city within sixty (60) days of completion. In such case as the FCC does not require annual performance tests, the grantee shall be required hereunder to conduct annual tests in conformance with the FCC rules in existence on the effective date of the franchise. (e) City Required Tests. Whenever there have been, more than five (5) similar complaints made or when there exists other evidence, which, in the judgment of the city, casts doubt on the reliability or quality of the grantee's system facilities, the city shall have the right and authority after providing grantee with such complaints or evidence to compel the grantee to test, analyze, and report on the performance of its system. The city may require additional tests, full or partial repeat tests, different test procedures, or tests involving a specific subscriber's terminal. Reports on such tests shall be delivered to the city no later than fourteen (14) days after the city formally notifies the grantee in writing. The report shall include the following information: the nature of the complaints or evidence provided by the city which precipitated the special tests; what system component was tested; the equipment used, and procedures employed in said testing; the results of such tests; and methods by which said complaints were resolved. Said tests and analyses shall be supervised by grantee's regional engineer who shall sign all records of the special tests and forward same to the city with a report interpreting the results of the tests and recommending what actions should be taken. All such tests shall be at the expense of the grantee. (f) General Maintenance. The grantee shall maintain wires, cables and all other real and personal property and facilities constituting the cable communications system in good condition, order and repair at all times during the term of the franchise. (g) Maintenance Log. The grantee shall maintain an annual log showing the date, approximate time and duration, type and probable cause of all cable communications system outages, whole or partial, due to causes other than routine testing or maintenance. The entries in such log shall be retained by grantee for one (1) additional year and shall be subject to inspection and copying by the city or its designee during grantee's regular business hours upon reasonable request and notice. (h) Service Interruption. Except where there exists an emergency situation necessitating a more expeditious procedure, grantee may interrupt service for the purpose of repairing, upgrading or testing the cable communications system, only during periods of minimum use, and only when feasible after a minimum of forty-eight (48) hours notice to affected subscribers.
(Ord. No. 8-94, § VII(7.9), 3-29-94)
Ask a question about Owensboro law
Corpus searches the Owensboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.