For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.3 — Submittal Requirements

Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 11.3

Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/9f30cfe7-1ca1-4c36-b75e-3dab272a6354

Sec. 11.3 - Submittal Requirements.

11.3.1 Pre-application Concept Plan and Adopted Master Development Plans. A. Prior to formal application and submittal of a preliminary plat for a major subdivision, as specified in Subsection 3.8.2, the applicant shall meet with the MPC staff and City or Parish Engineer to discuss the intended development and any specific provisions of this Code that relate to the project. To facilitate this meeting, the developer shall provide a preliminary Concept Plan containing the initial site planner's notations over a base map or aerial photograph. Provided information should include but not be limited to: 1. General street and lot layout and its relation to the existing street system. Lot sizes and right-of-way widths shall be dimensioned. 2. Locations of watercourses, wetlands, floodplains and sensitive areas. 3. Soil and drainage conditions. 4. Existing utility service information. B. A master development plan of the proposed subdivision and all land area of which has been properly zoned and/or is intended to be part of the subdivision, must be approved by the MPC concurrently with the Preliminary Plat. Approval of the Master Development Plan shall be by Conditional Use, following the procedures of Section 3.3.2. Any future plat approvals of the subdivision shall not differ materially, as defined in Section 3.8.2.E, from the conditionally approved Master Development Plan. If the new preliminary plat differs from the approved masterplan, a new Conditional Use hearing shall be held in accordance with the procedures of Section 3.3.2 of this Code, prior to review of any future plats. 11.3.2 Minor Plats. A. A minor plat shall be drawn to a scale no smaller than 1 inch equals 100 feet and shall include the following and any other information required by the City or Parish Engineer: 1. The name of the proposed subdivision. 2. List of names of the owners of record. 3. The following certification, signed by a land surveyor registered in the State of Louisiana, "I hereby certify this subdivision conforms to all regulations and requirements of the subdivision ordinance of the City of Bossier and the Bossier Parish Police Jury." 4. Date of preparation, north arrow, and graphic scale. 5. Indication that the submittal is a minor plat. 6. Legal description of location, including the section, township, range, parish, state, and acreage. 7. Boundary lines of the subdivision with length and bearings of lines. 8. Numbers and dimensions of the lots. 9. Front building setback lines. 10. Drainage channels and other significant features. 11. Location of private or public streets, alleys, and all easements. 12. Names of streets within and adjoining the plat. 13. A signature line for approval by the Metropolitan Planning Commission, City Engineer, Bossier Parish Engineer, and a signature line for acceptance by the Mayor. 14. If deemed necessary by the Executive Director the bearing and distances of the nearest section corner, quarter section corner or center of section if same has been established, with section, township, and range numbers shown. 15. Length of all arcs, radii, internal angles, points of curvature and tangents. 16. The Minor Plat shall be submitted to the City or Parish Engineer's office in an electronic format as required by the applicable jurisdiction. 11.3.3 Preliminary Plats—Major Subdivisions. A. A preliminary plat shall be drawn to a scale no smaller than 1 inch equals 100 feet, unless otherwise approved by the MPC, and shall include the following information: 1. The name of the proposed subdivision. 2. List of names of owner/developer and the land surveyor. 3. Date of preparation, north arrow, and graphic scale. 4. Indication that the submittal is a preliminary plat. 5. Legal description of location, including the section, township, range, parish, state, and acreage. 6. Names of adjoining subdivisions or, in the case of unplatted land, the names of the owner or owners of adjoining property. 7. Boundary lines of the subdivision with length and bearings of lines. 8. Contours (contour interval no greater than five feet) of the property either shown on the plat or on a separate document. 9. Location of natural features, such as wetlands, ponds, etc. 10. Location and dimensions of private and public streets, alleys, and easements. 11. Type of soil and water table information when requested by the Metropolitan Planning Commission. 12. Drainage channels and other significant features. 13. Front building setback lines on each lot. 14. Rear building setback lines if it differs from the minimum zoning requirement. 15. Location and dimensions of private and public streets, alleys and easements. 16. Provide signature line for endorsement by the chairperson of the Metropolitan Planning Commission. 11.3.4 Final Plat. A. General. 1. If the full subdivision in intended to be developed in two or more phases, the final plat may consist of a portion of the approved plat. 2. The final plat shall be prepared by a licensed land surveyor on tracing mylar or other permanent reproducible material. 3. All drawings and signatures of certification shall be submitted in a paper format that conforms to the requirements of the City or Parish Engineer. 4. If the plat has been prepared on a computerized drafting system, a copy of the computer file shall be provided on media that is acceptable to the City or Parish Engineer after approval of the Final Plat. 5. Submit 1 mylar copy of the final plat to the Metropolitan Planning Commission and 1 mylar copy to the City and/or Parish Engineer's office as needed. 6. The Final Plat shall be submitted to the City or Parish Engineer's office in an electronic format as required by the applicable jurisdiction. B. Requirements for the Final Plat. 1. Name under which the subdivision is to be recorded. 2. List of names of the developer, land planner and the surveyor. 3. Date of preparation, north arrow and graphic scale. 4. Indication that it is a final plat. 5. Legal description of location, including the section, township, range, parish, state, and acreage. 6. Names of adjoining subdivision, or in the case of unplatted land the name or names of the owners of the adjoining property. 7. Contours (contour interval no greater than 5 feet) of the property, shown on the plat or as a separate document. 8. Location of natural features, such as wetlands, ponds, etc. 9. Location and dimensions of private and public streets, alleys and easements. 10. Type of soil and water table information when requested by the Metropolitan Planning Commission. 11. Drainage channels and other significant features. 12. Front building setback lines for each lot. 13. Rear building setback lines for each lot if it differs from minimum zoning requirements. 14. Proposed streets (including location, dimensions and approved names), and their relation to platted streets or to proposed streets and shown on any adopted general development plan of adjacent property. 15. Dimensions of lots and lot numbers. 16. Location description and elevation of all benchmarks established or source for vertical control. 17. Accurate dimensions for all lines, angles, and curves used to describe boundaries, streets, alleys, easements and areas to be reserved for public use. Boundary survey of the subdivision shall satisfy the minimum standards. Data for all curves shall include radius, arc length, chord length, and central angle. 18. Flood statement on the final plat. 19. A certificate signed, sealed and dated by the licensed engineer or land surveyor responsible for the survey of the final plat. 20. The following certification, signed by a land surveyor registered in the State of Louisiana, "I hereby certify this subdivision conforms to all regulations and requirements of the subdivision ordinance of the City of Bossier and the Bossier Parish Police Jury." 21. Provide signature lines for owner or owners, dedicating all parcels of land which are intended for public use. 22. Provide signature line for endorsement by the secretary of the Metropolitan Planning Commission. 23. Provide signature lines for acceptance by the appropriate agency, either Bossier City Engineer or Mayor, or Bossier Parish Engineer. 24. Other information required by the City or Parish Engineer if needed. 11.3.5 Lot Pinning. A. All lots shall be pinned according to Louisiana state law. 11.3.6 Engineering Drawings and Specifications for the City or Parish Engineer. A. Submission of detailed engineering plans and profiles for streets and utilities, adhering to the standards of the City or Parish Engineer, prepared and certified by a registered professional engineer is required. B. Specifications and engineering shop drawings for all manholes, hydrants, valves, lift stations, traffic signals, or other mechanical devices installed by the developer should be included in the drawings. C. Final engineering construction documents shall be submitted to the City. D. Engineer's office in electronic format. (Auto-Cad or other approved format)

Ask a question about Bossier City law

Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.