§ 114-163 — Inspection and sampling
Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 114-163
Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/afb00b57-7687-4f54-8240-d07aa48d9c45
Sec. 114-163. - Inspection and sampling.
The city shall have the right to enter the facilities of any industrial user to ascertain whether the purpose of this article, and any permit or order issued hereunder, is being met and whether the industrial user is complying with all requirements thereof. Industrial users shall allow the director of public utilities or his representatives ready access to all parts of the premises for the purposes outlined in section 114-161 of this article. (1) Where an industrial user has security measures in force which require prior identification and clearance before entry into its premises, the industrial user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, personnel from the city, state, and EPA will be permitted to enter without delay, for the purposes of performing their specific responsibilities. (2) The city, state, and EPA may require to be provided and operated at the user's own expense, monitoring facilities to allow inspection, sampling and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises but the city may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. (3) There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility and the sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. (4) Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the city's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the city.
(Ord. No. 21-2022, § 6, 2-15-2022)
Ask a question about Bossier City law
Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
