For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 114-164 — Specific sampling requirements

Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 114-164

Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/c152c03f-d7e8-45cf-b15c-2cf44129d53c

Sec. 114-164. - Specific sampling requirements.

(a) Any sampling required to support the pretreatment program, or discrete sampling done for investigative purpose of a specific discharge, will be at the expense of the industrial user. (b) All significant industrial users must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the director may authorize the use of time proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. Samples for oil and grease, temperature, pH, cyanide, phenols, toxicity, sulfides, and volatile organic chemicals must be obtained using grab collection techniques. (c) Examination and analysis of the waters and waste required by this article shall be: (1) Conducted in accordance with 40 CFR 136 as amended. (2) Determined from suitable samples taken at the control manhole provided or other point authorized by the controlling authority. (d) BOD and TSS shall be determined from composite samplings, except to determine unauthorized discharges. (e) The controlling authority shall, at his discretion, select or approve an independent firm or laboratory to analyze for effluent characteristics he has determined are necessary. The cost for these analyses will be at the industrial user s expense. (f) All significant industrial users must submit self-monitoring data to the control authority twice per year unless required more frequently by the wastewater discharge permit. The self-monitoring data shall include but not be limited to: (1) Analytical report on the concentration of pollutants discharged into the POTW as outlined by the wastewater discharge permit. (2) Chain of custody report indicating the following: a. Name of person collecting the sample. b. Sample type (composite or grab). c. Date and time of collection. d. Sample preservation. e. List of parameters to be analyzed. f. Sample container type. g. And any other information the control authority may deemed necessary. (3) Quality assurance/quality control on all reported parameters.

(Ord. No. 21-2022, § 6, 2-15-2022)

Ask a question about Bossier City law

Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.