Sec. 114-306. - General requirements for construction site stormwater pollution prevention plan.
Any owner of a site of construction activity, whether or not he/she is an operator is jointly and severally responsible for compliance with the requirements in this section. Any contractor or subcontractor on a site of construction activity, who is not an owner or operator, but who is responsible under his/her contract or subcontract for managing records, implementing best management practices control measures, and site inspections, is jointly and severally responsible for any willful or negligent failure on his/her part to adequately implement the SWP3 if such action causes or contributes to causing the city to violate a water quality standard or the city's LPDES general stormwater discharge permit for discharges from its MS4. (1) Documents. The operator and/or owner of a site shall be required to retain copies of stormwater pollution prevention plans and all reports required by the state issued stormwater general permit associated with construction activities. Copies of the SWP3 and all reports shall be kept at the construction site (or other local location accessible to the federal, state and local authorities and the public) from the date of project initiation to the date of final stabilization. The operator and/or owner or their representative with day-to-day operational control over pollution prevention plan implementation shall have a copy of the plan available at a central location on-site for the use of all operators and those identified as having responsibilities under the plan whenever they are on the construction site. A copy of the plan and all reports must be readily available to federal, state and local inspectors during normal working hours. (2) SWP3 modification. In accordance with the state general discharge permit for construction site operators and/or owners, the SWP3 must be updated as necessary to reflect any changes applicable to protecting surface water resources in sediment and erosion site plans or site permits, or stormwater management site plans. The SWP3 must comply with the terms and conditions of the general permit. (3) Inspections (construction operators). It shall be the responsibility of the operator and/or owner to assure that the BMP's implemented are inspected at least once every seven days, or at least once every 14 calendar days, before anticipated storm events (or series of storm events such as intermitted showers over one or more days) and within 24 hours of the end of a storm event of 0.5 inches or greater. (4) Inspections (local authority). City inspectors may perform construction site inspections to evaluate whether BMP's established in the construction site SWP3 are effectively implemented. The city may also ensure that requirements established in the operator's general permit are being put into operation. Upon receiving a copy of the operator and/or owners NOI the city may indiscriminately conduct site inspections. If during a city inspection it is determined that the construction site is in non-compliance with the state issued permit or city ordinance, enforcement actions may be imposed. (5) Inspections (citizen complaints). The city shall investigate all citizen complaints and may investigate indiscriminately any site, which could threaten the health, safety, and welfare of the people.
(Ord. No. 107-2007, § 6, 11-27-2007; Ord. No. 167-2025, § 6, 11-18-2025)