§ 114-307 — Erosion and sediment control best management practices
Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 114-307
Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/0a3e0bab-8320-40cd-9697-21b85ca033a9
Sec. 114-307. - Erosion and sediment control best management practices.
Any operator and/or owner of a construction site shall use erosion and sediment BMP's to control and reduce the discharge of pollutants to the MS4 and to waters of the state. Sediment, silt, soil and other materials associated with clearing, grading, excavation and other construction activities shall be retained on site or captured by employing BMP's to the maximum extent practicable under prevailing circumstances. Such BMP's shall include but not be limited to the following control measures: (1) Waste control. Discarded building materials, litter, and any other type of solid waste at the construction site shall be contained on site in such manner as to ensure that it will not blow, wash, or otherwise be released directly to the MS4 system or upon any street, alley, sidewalk, storm drains, catch basin, conduit, or other drainage structure. The operator and/or owner of a construction site shall provide and maintain such containers or other type of BMP for the purpose of capturing and containing such waste. (2) Ready-mixed concrete. It shall be the responsibility of the operator and/or owner of a construction site to designate a wash out area for the cleaning of vehicles or equipment containing or used in transporting or applying ready-mix concrete. The designated wash area shall be constructed in a manner to prevent any discharge directly to a street, storm drain, catch basin, conduit, or any other drainage structure which may convey such waste to the MS4 or waters of the state. Any person or persons caught discharging ready-mix concrete to an MS4 system shall be held liable for all clean up and disposal cost and may be fined in accordance with section 114-309(c) of this article. (3) Good housekeeping. The operator and/or owner of a construction site shall provide general good housekeeping control measures to prevent and contain such spills as paint, solvents, fuels, septic waste, and other hazardous chemicals and pollutants associated with construction activities. The operator and/or owner or his/her representative shall ensure the proper clean up and disposal of any spilled waste is in accordance with federal, state and local clean up requirements and procedures. The cost of any spilled material to the MS4 system shall be the responsibly of the operator and/or owner of the construction site. (4) Maintenance. The operator and/or owner of a construction site shall ensure the timely maintenance of vegetation, erosion and sediment control measures and other protective measures identified in the SWP3 are effective and are in good operating condition. Maintenance needs identified in inspections or by other means shall be accomplished before the next anticipated storm event, or as necessary to maintain the continued effectiveness of storm water controls. (5) Construction site entrances. Disturbed soil at construction site entrances shall be managed to prevent sediment tracking onto public streets. Excessive sediment tracked onto public streets shall be removed immediately if the sediment presents a traffic hazard or public safety concern.
(Ord. No. 107-2007, § 7, 11-27-2007; Ord. No. 167-2025, § 7, 11-18-2025)
Ask a question about Bossier City law
Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
