Sec. 13-53. - Stormwater runoff detention.

(a) For all proposed developments, other than single-family residential, totaling ten thousand (10,000) square feet or more of land area (all phases), and all single-family residential developments totaling five (5) acres or more (all phases), the ten-year storm event post-development rate of runoff shall not exceed the ten-year storm event predevelopment rate of runoff. To insure that the postdevelopment rate of runoff does not exceed the predevelopment of runoff, on-site detention will be required in a manner approved by the city department of public works. The detention system cannot release water from the site at a rate greater than the pre-development rate of runoff. (b) The design concepts for detention facilities and determination of storm runoff shall be consistent with sound hydrological and hydraulic engineering principles and practices, and the provisions of the Jefferson Parish "Storm Drainage Design Manual" dated 1981 and latest revisions and "Parking Lot Storm Runoff Detention Manual" prepared by the engineering division of the Jefferson Parish department of public works. (c) The developer shall submit drainage design calculations including a drainage map along with engineering plans to the City of Kenner department of public works for approval by the director. The drainage map shall include a line diagram reflecting the existing drainage system from the outfall [end] of the proposed development to the receiving outfall canal, reflected in the applicable current drainage map. The developer shall also submit calculations showing the impacts to the detention facility from a 100-year storm event. (d) Drainage calculations shall address all relevant information that would affect the hydraulics of the drainage system including, but not limited to, the following: (1) Drainage basin characteristics; (2) System hydraulics; and (3) Other external influences upstream and downstream from the drainage system that may impact or be impacted by the proposed system. Drainage calculations shall consist of: (1) ten-year pre-development flow; (2) ten-year post-development flow; (3) description of release facility and volume of release versus depth of storage in detention facility for ten-year and 100-year storm events; (4) Maximum depth of water in the detention facility for design storms; (5) Description of impact to the proposed facility resulting from increased depth of storage; and (6) The description of how the system will be maintained. (e) Unless unstable or highly erosive soil conditions indicate that a lower design velocity is desirable, or unless ditch paving at the outlet is provided, the maximum velocity for culvert design shall adhere to the criteria in the Jefferson Parish "Storm Drainage Design Manual" dated 1981 and latest revisions. (f) The City of Kenner director of the department of public works shall review for approval each proposed development covered by this section prior to the issuance of permits to proceed with said development.

(Ord. No. 8592, § 1, 12-20-01)

Ask a question about Kenner law

Corpus searches the Kenner sections it holds and shows the ones that match, with their citations. Free, no sign-in.