§ 12.2 — GENERAL RIGHT-OF-WAY STANDARDS
Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport Unified Development Code § 12.2
Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/23efe9c9-3450-4135-a7ff-5ad211aa4e8b
12.2 - GENERAL RIGHT-OF-WAY STANDARDS
All new construction, reconstruction, and reconfiguration of rights-of-way must comply with this section. This does not apply to limited access expressways. Rights-of-way must be designed in relation to topographic and drainage conditions, public safety, and the development served by the right-of-way. A. Right-of-Way Construction 1. All right-of-way construction and repair must be in accordance with standards and specifications set forth by the Department of Engineering and Environmental Services and/or the Department of Public Works. 2. Vertical alignment must be in accordance with standards and specifications set forth by the City Engineer. 3. For horizontal alignment, the minimum radius of curvature of streets on the centerline must be as follows: a. Major street: 750 feet b. Collector streets: 200 feet c. Minor streets: 100 feet 4. Unless approved by the City Engineer, all streets must have a centerline tangent of 100 feet between reversed curves. 5. Street grades must conform in general to the terrain and the minimum grade will be based on surface type of the roadway as determined by the City Engineer. Generally, street grades should not be less than 3/10 of 1% nor more than 5% for major street and collector streets and not less than 3/10 of 1% nor more than 10% for minor streets unless steeper grades are permitted by the City Engineer. B. Access and Intersection Requirements 1. All public and private rights-of-way must be improved as complete streets. A complete street is defined as right-of-way facilities that are designed and operated to enable safe access for all users. Persons with disabilities, pedestrians, bicyclists, motorists, and transit riders are able to safely move along and across a right-of-way designed as a complete street. 2. If a new subdivision involves frontage on a major street, the street layout should be planned to avoid, to the extent possible, any private residential driveways from having direct access to such streets. In such cases, if such access must be provided by means of a frontage road, the centerline of which must be 75 feet from the centerline of the major street right-of-way with motor access at suitably spaced points. 3. Street intersections must be at right angles. If, because of topography or other natural or man-made barriers, an intersection cannot be at right angles, the intersection may use an alternate design that ensures safety. 4. Street jogs with centerline offsets of less than 100 feet will not be permitted except where the intersected street has a divided roadway without a median break at either intersection. C. Property Line and Curb Radius 1. Curb radii cannot be less than 25 feet and must be increased proportionately where the angle of intersection is less than 50 degrees. 2. These minimums may be increased where the City Engineer finds that larger arcs or radii are necessary for the proper design of the intersection. D. Clearing and Grubbing The entire area indicated for public use must be cleared and grubbed as directed by the City Engineer. In the areas designated to be cleared and grubbed, all stumps, roots, brush, and other unsatisfactory materials must be removed to a minimum depth of two feet below the subgrade, then backfilled and compacted with suitable material. E. Drainage Proper drainage is the responsibility of the subdivider. Subsurface drainage is required. Green infrastructure designs are encouraged. F. Utility Installation Prior to paving of streets or sidewalks, water and sewer mains and services must be in place, or the developer must provide necessary casing for utilities. No pavement may be cut without the approval of the City Engineer. No boring of new pavement is allowed for the installation of new service lines mains or other facilities unless approved by the City Engineer. G. Street Lighting Prior to approval of the final plat, a plan for the installation of streetlights on all new streets within the subdivision must be approved. The street lighting plan must include the type, location, and mounting of all fixtures and poles, and evidence that the system must be designed to yield, at 80% efficiency, a minimum of 0.2 footcandles at the centerline of the street with a uniformity ratio of four to one (average to minimum).
(Ord. No. 95, 2021, §§ 10, 11, 7-13-21)
Ask a question about Shreveport law
Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.