§ 12.6 — ACCESS ROADWAYS AND DRIVEWAYS TO CITY STREETS
Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport Unified Development Code § 12.6
Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/8acd85d4-6bf6-4509-9d30-7cefac724394
12.6 - ACCESS ROADWAYS AND DRIVEWAYS TO CITY STREETS
A. U.S. and State-Signed Highways Any request for direct access to, or within one-quarter mile of, a ground-level intersection with a U.S. or Louisiana state highway must comply with Louisiana Department of Transportation and Development (LADOTD) standards. A LADOTD permit is required prior to the issuance of any City permit. Applicants must contact the LADOTD District 04 Traffic Operations Engineer and the District 04 Permit Specialist for specific instructions, guidance, and applicable standards regarding the permitting process. B. Traffic Impact Studies 1. A Traffic Impact Study (TIS) shall be required for the following: a. Any new non-residential development with a gross floor area over 100,000 square feet or with 200 or more parking spaces; b. Any new multi-family development, including additions to existing multi-family developments, where the total number of dwelling units exceeds 100 units; c. Any new subdivision, including additions to existing subdivisions, where the total number of lots is 50 or greater; d. Any new use or change of an existing use that is projected to generate more than 100 peak-hour vehicle trips, based on trip generation estimates in the Institute of Transportation Engineers (ITE) Trip Generation Manual, unless local trip generation data demonstrates a higher trip rate; e. Any development with ingress or egress on a roadway operating at Level of Service (LOS) "D" or lower; f. Any other development at the discretion of the Office of the City Engineer to address special or unique traffic concerns, including but not limited to: • Developments generating a high proportion of heavy truck traffic; • Locations near or within high crash zones; • Developments near schools, hospitals, or other sensitive land uses; or • Any other condition that may pose a risk to public safety. 2. The applicant, or their engineering representative, shall schedule a meeting with the Office of the City Engineer during the conceptual site plan phase of development—prior to submission of any permit application. The purpose of this meeting is to determine whether a Traffic Impact Study is required. Failure to contact the Office of the City Engineer during the conceptual site plan phase may result in delays in the permit review process. A City permit will not be issued until all required traffic review steps are completed.
(Ord. No. 69, 2025, § 1, 8-12-25)
Ask a question about Shreveport law
Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
