§ 18-12 — Permission of council required to construct, lay, etc. lines
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 18-12
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/ecbddc1c-52ee-470b-b61f-77fdf0391e35
Sec. 18-12. - Permission of council required to construct, lay, etc. lines.
(a) No company shall construct a line for the transmission of intelligence by electricity or by telephone, whether by electricity or otherwise, or by the transmission of electricity for lighting, heating or power, upon, along, under or across a public way without the permission of the city council. (b) A company desiring such permission shall petition the city council in writing, attaching thereto a plan, indicating where it is proposed to construct such line for permission to erect or construct upon, along, under or across such way the wires, poles, piers, abutments or conduits necessary therefor. A public hearing shall be held on the petition, and written notice of the time and place of the hearing shall be mailed at least seven (7) days prior thereto by the city clerk to all owners of real estate abutting upon that part of the way upon, along, across or under which the line is to be constructed, as such ownership is determined by the last preceding assessment for taxation. (c) After the public hearing the city council may by order grant to the petitioner a location for such line specifying therein where the poles, piers, abutments or conduits may be placed, and in respect to overhead lines may also specify the kind of poles, piers or abutments which may be used, the number of wires or cables which may be attached thereto, the height to which the wires or cables may run and the maximum voltage between conductors to be carried through same. The order shall be recorded by the city clerk in books kept exclusively therefor. (d) The construction of the line shall substantially conform to the order granting the location and every pole or conduit placed otherwise as therein designated shall be forthwith removed. (e) Every order granted under this section shall be subject to the right of the city to place, free of charge, signal circuits, signal supply circuits and the equipment attached to these circuits belonging to the city and used by it exclusively for municipal purposes at suitable points on each of such poles. Such order shall also be subject to the right of the city, to place, free of charge, its wires and cables in a conduit furnished and installed by the company in every buried cable trench and in every underground conduit constructed by such company under such order.
(Code 1965, § 18-32)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
