Sec. 18-16. - Fees.
A. | Residential fees: 1 | Minimum Fee | $60.00 2 | New Construction (per dwelling unit) | 250.00 3 | Remodeling & additions (minimum fee) | 60.00 a. | Switches, receptacles, & fixtures | 15.00 minimum plus 1.00 fee for each b. | Major appliances | 15.00 minimum 1.00 plus fee for each 1 | Ranges, countertop units, ovens, dryers, disposals, hot water heaters, gas & oil burners, electric heat/room generator, A/C 4 | Services a | Not over 200 amps | 75.00 b | Each 100 amps additional | 30.00 c | Each additional I meter or panel | 30.00 d | Temporary services | 75.00 5 | Fire alarms | 15.00 minimum plus 1.00 fee per unit 6 | Burglar alar | 15.00 minimum plus 1.00 fee per unit 7 | CATV, voice, data | 12.00 8 | Swimming pools (per inspection) | 60.00 ;sz=8q; Time limit on issuance: Permits issued from the inspector of poles and wires will be held no longer than six (6) months, after which time, a new application will have to be taken out. Additional fees: An additional charge of sixty dollars ($60.00) shall be made and paid for by the electrician doing the work for additional inspection resulting in the opinion of the Inspector of poles and wires, from defective work, improper mechanical execution of electrical work, job not completed, improper information on application and wrong address, and twice amount will be levied for failure to take out a permit. B. | Commercial/industrial: 1 | Minimum fee (1 inspection) | $75.00 2 | New construction (as percentage of electrical cost) | 2% 3 | Remodeling and additions Each Inspection | 25.00 a | Services up to 200 amps | 100.00 b | Each 100A additional or portion thereof | 50.00 c | Each additional meter or panel | 25.00 4 | Switches, receptacles, fixtures | 3.00 for each 5 | Major appliances, machinery, ranges, cooktop, ovens, dryers, disposals, dishwashers, hot water heaters, electric heat/unit, gas or oil burners, A/C per unit, motors, generators, transformers, etc. | 25.00 minimum plus gas or oil burners and transformer 25.00 fee for each ALL OTHERS (minimum) plus 20.00 fee 7 | Electrical Signs | 25.00 fee each 8 | New Condominiums per unit | 100.00 fee 9 | Carnivals and concessions | 75.00 BASE FEE plus 25.00 fee for each concession 10 | Fire alarm systems, security, CATV voice, data | 3.00 minimum plus fee for each device 8 | Swimming pools | 60.00 9 | Annual permits and inspections For maintenance & repairs where licensed electricians are employed | 360.00 per year 10 | License commission inspection | 30.00 ;sz=8q; Time limit on issuance: Permits issued from the inspector of poles and wires will be held no longer than six (6) months, after which time, a new application will have to be taken out. Additional fees: An additional charge of seventy dollars ($70.00) shall be made and paid for by the electrician doing the work for additional inspection resulting in the opinion of the inspector of poles and wires, from defective work, improper mechanical execution of electrical work, job not completed, improper information on application and wrong address, and twice amount will be levied for failure to take out a permit.
(Ord. No. D147, 7-29-82; Ord. No. D150, 12-17-82; Ord. No. D159, 6-30-83; Ord. No. D198, 10-31-85; Ord. No. D199, 10-31-85; Ord. No. D240, 11-13-87; Ord. No. G049, § VI, 4-28-08; Ord. No. J13, § IV, 10-13-15)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.