Sec. 20-48. - Terms of the street opening permit.

(1) Term of permit. All street opening permits shall be valid for thirty (30) days and upon written request to the awarding authority, renewable for an additional thirty (30) days. Permits must be present at the work site. Permits can be revoked by the awarding authority if the applicant is in default. (2) Inspections. Inspections may take place at the following events: (a) Prior to back filling the trench; (b) Following installation of controlled density fill; (c) Following completion of temporary patch placement; (d) During the permanent patch window. (e) Following completion of permanent patch placement contractor will notify the appropriate department of public works division(s) when an inspection is desired and coordinate the timing of such inspection. A minimum of seventy-two (72) hours notice is required. (3) Working hours. Except in emergency situations, street opening work will occur during normal working hours. The permit holder (contractor) must give notice of the intended street opening work seventy-two (72) hours in advance to the appropriate department of public works division, and, unless the requirement for a police detail is waived by the police chief of the municipality, must arrange for and pay for a police detail to be present throughout the period of time that street opening work is being conducted. (4) Dig-Safe. The permit holder (contractor) shall, in accordance with all current laws of the commonwealth, notify all public utilities seventy-two (72) hours in advance of making any excavation in a street. Such notification shall be made by means of obtaining a Dig-Safe number. Said number shall be provided on the street opening permit application. The permit shall not be issued until this information is provided. In the City of Brockton, the appropriate department of public works division(s) must be notified independently of Dig-Safe. (5) Existing utilities. Before starting any excavation, the permit holder (contractor) must confer with all public utilities to obtain information from each as to the horizontal and vertical locations of existing utilities and other conditions that may affect excavation. The permit holder (contractor) shall not interfere with any existing utility without the written consent of the awarding authority representative and the owner of the utility. If it becomes necessary to relocate an existing utility, this shall be done by the owner and the cost of such work shall be borne by the permit holder (contractor). The permit holder (contractor) shall inform itself as to the existence and location of all underground utilities and protect the same against damage. (6) Protection of existing lines and structures. The permit holder (contractor) shall adequately support and protect by timbers, sheeting, etc. all pipes, conduits, poles, cables or other appurtenances which may be in any way affected by the excavation work and shall do everything necessary to support, sustain and protect them under, over, along or across such work area. The excavation work shall be performed and conducted in such a manner that it shall not interfere with access to fire stations, fire hydrants, water gates, underground vaults, catch basins or any other public structure. (7) Adjoining property. The permit holder (contractor) shall, at all times and at its own expense, preserve and protect from injury any adjoining property by providing proper foundations and shall take such other precautions as may be necessary for this purpose. The permit holder (contractor) shall at all times and at its own expense shore up and protect all buildings, walls, fences, trees and other property likely to be damaged during the progress of the street opening work and shall be responsible for all damages to public or private property or streets resulting from its failure to properly protect and carry out said work. The permit holder (contractor) shall not remove, even temporarily, any trees or shrubs which exist in planting strip areas without first obtaining the consent of the commissioner of the department of public works or his designee. (8) Damaged trees. In the event a tree is either accidentally destroyed by the permit holder (contractor) or is authorized for removal by the awarding authority representative, the permit holder (contractor) shall remove the tree, stump and debris from the work site, and replace the tree with an identical species with a minimum caliper of two (2) inches in the identical location. (9) Pedestrian crossings, open trenches. The permit holder (contractor) shall, where possible, maintain safe crossings for two (2) lanes of vehicle traffic at all public intersections as well as safe crossings for pedestrians at intervals of not more than three hundred (300) feet. If any excavation is made across a street or way, it shall be made in sections to assure maximum safe crossing for vehicles and pedestrians. An open trench may not exceed fifty (50) feet in length (or less if conditions dictate) unless specifically permitted by the awarding authority or representative. No trench shall be left unattended and in no case will a trench be left open overnight. If the street or way is not wide enough to hold the excavated material for temporary storage, the material shall be immediately removed from the location. (10) Traffic. The permit holder (contractor) shall take appropriate measures to assure that during the performance of the street opening work, so far as practicable, normal traffic conditions shall be maintained at all times so as to cause as little inconvenience as possible to the occupants of the adjoining property and to the general public. The awarding authority representative may permit the closing of streets and walks to all traffic for a period of time. Unless the requirement for a police detail is waived by the police chief of the city and the traffic commission, the permit holder shall engage at their cost a police detail to maintain traffic control and public safety at the project site while street opening work is in progress. Warning signs shall be placed a sufficient distance from the project site in order to alert all traffic coming from both directions. Cones or other approved devices shall be placed to channel traffic. Warning signs, lights and such other precautions shall conform to the latest edition of the Manual on Uniform Traffic Control Devices. Construction materials and equipment on the site shall be limited in quantity and in the space they occupy so that they do not unduly hinder and block traffic. (11) Gutters and basins. The permit holder (contractor) shall maintain all gutters free and unobstructed for the full depth of the adjacent curb and for at least one (1) foot in width from the face of such curb at the gutter line. Catch basins shall be kept clear and serviceable. (12) Excavated material. The permit holder (contractor) shall remove all excess excavated material, surplus water, muck, silt, residue or other runoff pumped or removed from excavations from the site. (13) Repairs and or installation. At the end of each day, all trenches must be plated if work is not completed and/or backfilled, compacted and temporarily patched on the day work is completed. No open unplated trenches are permitted overnight and work in plated trenches must be continually prosecuted to completion to minimize the time trenches are plated. Plates must be properly installed and trenches illuminated. In no case will trench plating be allowed in the winter. In no case will a trench be left unattended or unmarked. No trench plating will be allowed to remain over weekends. (14) Noise. The permit holder (contractor) shall perform the work in such a manner as to avoid unnecessary inconvenience and annoyance to the general public and occupants of neighboring property. During the hours from 10:00 p.m. to 7:00 a.m. the permit holder (contractor) shall not use, unless otherwise specifically permitted by the awarding authority or awarding authority representative, any tool, appliance or equipment producing noise of sufficient volume to disturb the sleep or repose of occupants of the neighboring property. (15) Debris and litter. All debris and litter remaining from the street opening work site shall be removed by the permit holder (contractor) at the end of each work day. Any and all hazardous materials shall be properly disposed of per applicable statutes and federal laws. (16) Restoration of pavement markings. All permanent pavement markings (crosswalks, center lines, fog lines) which are damaged during street opening work shall be restored in kind by and at the expense of the permit holder (contractor). (17) Lawn surfaces and plantings. All lawn surfaces which are disturbed during street opening work shall be replaced with sod or six (6) inches of screened loam, lime, fertilized and reseeded with good-quality lawn seed. Any areas containing plantings shall be restored to their original condition with the same or similar plantings. The permit holder (contractor) shall be responsible for maintaining lawn surfaces and plantings until the root systems have been established. The department of public works will have final inspection authority. (18) Erosion control. The permit holder (contractor) shall be responsible for all erosion control and for obtaining any necessary permits from the conservation commission. The permit holder (contractor) shall protect drainage structures from siltation by whatever means required including, but not limited to, the installation of hay bales and/or filter fabric. In the event that a drainage structure becomes damaged from siltation as a result of the street opening work, the permit holder (contractor) shall clean the structure before completing the temporary patch.

(Ord. No. G041, 8-27-07)