§ 20-49 — Required construction techniques
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 20-49
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/e29c5920-e52c-47cd-9979-8f64b497d4e8
Sec. 20-49. - Required construction techniques.
All street opening work and materials used therein must conform to the latest English edition of the Massachusetts Highway Department's Standard Specifications for Highways and Bridges, and with the Americans with Disabilities Act and the architectural access board regulations as currently in effect. In addition, the following specific requirements also apply. Exceptions to these requirements may be made in the discretion of the awarding authority or awarding authority representative at the time that the street opening work is in progress. (1) Excavation. Existing pavement shall be cut in neat, true lines along the areas of the proposed excavation. Unstable pavement shall be removed over cave-outs and breaks and the subgrade treated as the main trench. Pavement edges shall be trimmed to a vertical face and neatly aligned with the center line of the trench. Cutouts beyond the limits of the trench lines must be normal or aligned parallel to the center line of the trench. Excavations shall be made in open cut. Trenches and excavations shall be braced and sheathed in accordance with the requirements of the Occupational Safety and Health Act (OSHA). Sections of bituminous or cement concrete sidewalks shall be removed to the nearest scoreline or approved cut edge. (2) Back-filling and compaction. All excavations shall be filled with controlled density fill. When using CDF, twelve (12) to fifteen 915) inches of sand shall be placed over water and sewer pipes prior to placing CDF. The awarding authority or the awarding authority representative are the only persons who can waive this requirement. If this requirement is waived, excavations must be filled with approved backfill, which will consist of suitable excavated material or gravel meeting M 1.03.0 or M 1.03.1 of the standard specifications. Suitable excavated material shall mean previously excavated granular material which does not include blacktop, clay, silt, organic material, concrete, roots, boulders or stones larger than four inches in diameter. If the hole is to be filled with suitable excavated material, a backfill course shall be placed in approximately twelve-inch lifts of maximum compaction to four (4) inches below asphalt grade (See diagrams 1, 2, and 3). A base course consisting of four (4) inches of processed gravel or equivalent (i.e. suitable excavated material containing no stones larger than one and one-half (1½) inch in diameter) shall then be placed on top of the backfill course. The backfill and base course shall be compacted to not less than ninety-five (95) percent of maximum dry density as determined by the modified Proctor Test in accordance with ASTM 1557 Method D. The permit holder (contractor) if directed by the awarding authority or its representative will retain at its expense, a professionally qualified geotechnical consultant to perform this test. The results of this test shall be given to the commissioner of the department of public works or his authorized representative. If controlled density fill is used as backfill material, it must contain a minimum of two hundred fifty (250) pounds of class F flyash or high air (twenty-five (25) percent plus) and be self-leveling. It must be type 1E or 2E (very flowable). Flowable fill is to be batched at a ready mix plant and is to be used at a high or very high slump (one (1) inch to twelve (12) inches). In lieu of the slump test, a six-inch long, three-inch diameter tube may be filled to the top and then slowly raised. The diameter of the resulting "pancake" may be measured and the range of the diameter shall be nine (9) inches to fourteen (14) inches. It shall be flowable, require no vibration and after it is placed excavatable by hand tools and/or small machines. The ingredients shall comply with the following: Portland cement | AASHTO M85 Fly Ash | AASHTO M295 Class F Sand | M 4.02.02- ASTM C33 Air | M 4.02.05 Type 1E and 2E must meet the following requirements: Compressive | 28 days | 90 days Strength | 30—80 psi | 100 psi ma. Slump | 10—12 inches Air | 1—30% If controlled density fill is used as backfill material, it must fill the excavation to immediately below asphalt grade. The permit holder (contractor) must then plate the excavation with a heavy duty steel plate adequate to carry heavy traffic and wait twenty-four (24) hours for the CDF to cure prior to applying the permanent patch. If an excavation is back-filled with controlled density fill in accordance with this by-law, then a temporary patch need not be installed but a permanent patch may be installed immediately. Permanent patches installed over controlled density fill shall consist of no less than four (4) inches of bituminous concrete or to the depth of the existing pavement, whichever is greater applied in a two-and-one-half[-inch] base course and a one-and-one-half inch top course of bituminous concrete all installed in accordance with this by-law. If an excavation is in a cement concrete street or way is filled with controlled density fill, then the provisions of paragraph 5 (a) of this by-law may be omitted, but the provisions of paragraph 5(b) and 5(c) must be complied with. (3) Temporary patches. a. Bituminous concrete. Following proper compaction, a temporary patch which shall be the thickness of the existing asphalt pavement or a minimum of four (4) inches, whichever is greater, shall be applied. It shall consist of bituminous concrete plant-mixed hot asphalt aggregate. (See diagrams.) b. Temporary patch to be maintained for one year. A temporary patch that has been backfilled and compacted shall be maintained by the permit holder (contractor) so that the patched surface and the surrounding area remain a single smooth unbroken plane for a period of time no less than three (3) months nor no more than one (1) year after placement of the temporary patch, after which a permanent patch will be placed. (4) Permanent patches. Except when installed over controlled density fill as described in paragraph (2) above, permanent patches shall be installed not less than three (3) nor more than six (6) months from the date of installation of the temporary patch. Upon request of the permit holder (contractor), the awarding authority representative will inspect the temporary patch and determine if final settlement of the trench has occurred. The awarding authority representative will notify the permit holder (contractor) within seven (7) days of the inspection whether the permanent patch can be installed. Public utilities or municipal departments may schedule permanent patches to replace all temporary patches then within the permanent patch window without receiving prior approval from the awarding authority but must give the awarding authority and its representative not less than seventy-two (72) hours prior notice. A permanent patch shall consist of one of the following: a) cold planing the temporary patch to a depth of one and one-half (1½) inches and then installing a minimum of one and one-half (1½) inches of top course of bituminous concrete, or b) the excavation of the temporary patch in a bituminous concrete public way and replacement of this material with any additional processed gravel needed and a minimum of two and one-half (2½) inches of base course and one and one-half (1½) inches of top course of bituminous concrete or to the depth of existing pavement, whichever is greater (see diagrams 1 and 2) or c) application of the infrared process to the temporary patch, or d) the certification by the awarding authority representative made during the permanent patch window that the temporary patch in his reasonable judgment meets fully the standard of a permanent patch and thus requires no further work. a. Cold planing. If the cold planing method is used, the area to be cold planed must extend at least twelve (12) inches beyond all sides of the existing temporary patch (See diagram 2). This area must be cold planed to a depth of one and one-half (1½) inches. Any broken or irregular edges of existing pavement shall be cut away in straight lines leaving a sound vertical face at least twelve (12) inches back from all edges of the existing pavement. The permit holder (contractor) must provide a dust control system capable of complying with environmental air quality standards during cold planing and sweep the street or way following completion of the cold planing work. All abutting edges of the existing pavement will be painted with an asphalt emulsion immediately prior to the placement of the permanent patch. The permanent patch will consist of the application of a top course of a minimum of one and one-half (1½) inches of bituminous concrete plant-mixed hot asphalt aggregate. After raking and rolling, the grade of the permanent patch shall match the existing bituminous surface of adjacent pavement. The finished permanent patch shall be level, having no depressions retaining water on any of the surface. All seams of the finished perimeter shall be sealed with penetrating asphalt emulsion. b. Excavation. Any temporary patch that has been patched with cold patch must be excavated and replaced with a bituminous concrete base in accordance with this paragraph. If the excavation method is chosen and if additional cutting of the existing pavement is required, it shall be done in neat straight lines. Any broken or irregular edges of existing pavement shall be cut away in straight lines leaving a sound vertical face at least twelve (12) inches back from all edges of the existing pavement. (See diagrams 1 and 3). All abutting edges of the existing pavement shall be painted with an asphalt emulsion immediately prior to the placement of the permanent patch. The permit holder (contractor) shall remove and dispose of all excavated material and thoroughly compact the surface of the sub-base. Following excavation the permanent patch shall consist of a bituminous concrete base and top laid and rolled in two (2) courses. The binder (base course) shall be a minimum of two and one-half (2½) inches in depth and the top course shall one and one-half (1½) inches, or to the depth of existing pavement, whichever is greater in depth. If after compaction, more than four (4) inches of permanent patch is needed in order to restore the excavated area to finish grade, additional bituminous concrete shall be used in the base course. The base course shall be placed and carefully raked and thoroughly rolled to the required thickness. The top course shall be placed to a grade that will match the existing bituminous surface after rolling. All seams of the finished perimeter shall be sealed with penetrating asphalt emulsion. The finished Permanent Patch shall be level having no depressions retaining water on any of the surface. c. Infrared process. If the infrared process is utilized to install the permanent patch, the area to be repaired shall be thoroughly cleaned to eliminate all potential contaminants. An infrared heater shall be positioned over the area to be repaired for a period of time required to plasticize the existing pavement to a depth one and one half inches. Oxidation of the pavement caused by improper heating techniques must be avoided. If this condition occurs, all oxidized material must be removed and replaced with class I bituminous concrete meeting the latest English edition of the Standard Specifications of the Massachusetts Highway Department. The softened area shall be inwardly reworked from approximately one (1) foot beyond all sides of the original temporary patch. This designated area shall be treated with a penetrating asphalt emulsion, uniformly scarified and raked to a workable condition. For street crossings and/or trenches with jogs, the reworked area will be extended beyond the outermost jog in a straight line parallel with the opposite outermost jog. Under no circumstances may the infrared heat treatable patching mix that is used register a temperature under two hundred (200) degrees F. After the paving mixture has been properly admixed and raked to grade, compacting shall be obtained by use of a steel-wheeled roller of sufficient weight to establish a uniform density comparable to that of the surrounding pavement surface within the work area. The finished permanent patch shall be level having no depressions retaining water on any of the surface. All seams of the finished perimeter shall be sealed with penetrating asphalt emulsion. A petroleum resin sealant shall be applied consistently to the entire heated area by mechanical means or hand application at an approximate rate between .1 and .25 gallons per square yard. Actual rate will be determined on site by an approved absorption test method. A mineral filler will then be broadcast over the newly sealed area to absorb any excess liquid and prevent tracking and the area immediately opened to traffic. d. Certification. If a permit holder (contractor) seeks to qualify a temporary patch as a permanent patch, it must make the application for inspection set out above and specify in it its request for certification. The awarding authority representative will notify the permit holder (contractor) within thirty (30) days of the request whether the temporary patch has been certified as a permanent patch. If it is not so certified, the permit holder (contractor) shall forthwith cause a permanent patch utilizing one of the three remaining methods set out above to be utilized. e. Newly paved roads. On newly paved roads, the awarding authority representative has final approval to permit road opening and will require, in addition to the placement of the permanent patch, that the permanent patch shall be treated by a process (infrared, microwave or equivalent) that will ensure that the permanent patch is integrated into the existing bituminous surface in a seamless manner. f. Final inspection of permanent patch. Following completion of the permanent patch, the permit holder (contractor) shall give notice thereof to the awarding authority representative who shall inspect the permanent patch. If the awarding authority representative is satisfied that the road has been restored to as good a condition as existed or better prior to the street opening work, he shall so note on the street opening permit. Any refundable deposit securing that street opening work shall be held for a minimum of one (1) year. After the minimum one (1) year has elapsed, the applicant may apply for return of the refundable deposit. If the awarding authority representative determines that the permit holder (contractor) is in default, the awarding authority may proceed in accordance with paragraph XIII, Remedies, of this by-law. (5) Special rules for cement concrete roadways. Any excavation in a cement concrete street or way or street or way with a cement concrete base with a bituminous concrete surface shall be back filled as described in paragraph (2) and temporarily patched as described in paragraph (3). Immediately prior to the installation of a permanent patch, the following shall be done: a. The temporary patch and sufficient backfilled material shall be removed. b. A six-inch reinforced concrete slab shall be laid over the backfilled trench extending one (1) foot beyond all edges of the trench surface and allowing for four (4) inches of bituminous concrete to be installed above the slab. The slab shall have steel reinforcing for tensile strength in accordance with good engineering practices. The permit holder (contractor) shall install a temporary heavy duty steel plate adequate to carry heavy traffic over the trench until the concrete slab shall have adequately cured. c. Once the concrete slab shall have cured, there shall be installed a four-inch layer of bituminous concrete applied in a two-and-one-half inch base course and a one-and-one-half-inch top course all in accordance with this by-law. (6) Shoulders. Suitable excavated material shall be placed in layers not to exceed six (6) inches in depth and compacted. Shoulders shall be reconstructed to their existing condition and either loomed with six (6) inches of loam, limed, fertilized, and seeded with roadside grass mix or covered with four (4) inches of wood chips as directed by the awarding authority representative. (7) Sidewalks. Any excavation in a concrete or bituminous concrete shall require that the entire sidewalk area containing the trench be replaced. Any concrete sidewalk that is excavated or damaged by the excavation must be replaced in its entirety. Suitable excavated material or gravel shall be placed in layers not to exceed six (6) inches in depth and compacted. All sidewalk areas will be installed by the permit holder (contractor) in conformance with the ADA and the architectural access board regulations currently in effect. Bituminous concrete sidewalks shall have two (2) courses (two (2) inches of binder and one (1) inch of top) of bituminous concrete plant-mixed hot asphalt aggregate applied to and rolled to create a pavement surface consistent with the adjacent bituminous concrete surface. Concrete sidewalks shall have four (4) inches of poured concrete applied to finish grade. The concrete shall be placed in alternate slabs nine (9) meters in length except as otherwise ordered. The slabs shall be separated by transverse pre-formed expansion joint filler thirteen (13) millimeters in thickness. Concrete driveway openings shall have six (6) inches of poured concrete applied to finish grade. Preformed expansion joints will be installed against buildings, walls, steps, foundations or existing concrete block. (8) Curb and berm. Any curbing or berm which is damaged or removed as part of the street opening work shall be properly replaced in kind. The use of cast-in-place concrete is prohibited. All salvageable granite curb that is removed from the street or way and is excess is the property of the city and shall be delivered to the department of public works operations division, highway section by the permit holder (contractor). (9) Wheelchair ramps. Existing wheelchair ramps which are damaged or removed under street opening work shall be reconstructed in kind and in conformance with the ADA and architectural access board regulations that are currently in effect. (10) Curb cuts. Any curb cut within a street or way cannot exceed the following dimensions unless specifically approved by the awarding authority representative: Single-family dwelling | - | 16 feet Multifamily dwelling | - | 18 feet Two-family dwelling | - | 18 feet Commercial property | - | 24 feet Driveway entrances into streets or ways must butt into and not overlap the edge of the existing roadway hardened surface. The driveway must be graded in such a manner that no ponding of water occurs within the public way and in accordance with the architectural access board regulations. Driveways shall not be located on small-radius curves and shall be positioned as to provide maximum sight distance and safety. (11) Construction requirements and methods. a. All construction work, except for emergency repairs, shall be undertaken during the normal working hours of the Brockton department of public works. b. A person or city department issued a permit pursuant to the provisions of this by-law shall provide suitable sanitary accommodations for his employees at the job site unless the commissioner of the department of public works or his/her authorized agent exempts such party from this requirement because of the temporary duration of the project or the existence of sanitary facilities operated by the contractor, or its principal, within the city. c. Any person doing any construction, razing, repairs, excavations or surfacing of any streets or ways to which the public has a right of access shall maintain at his or her expense, such police officers on special duty (outside their regular tours of duty) as the chief of police may deem necessary to avoid substantial interference with the free flow of traffic and to protect the safety of the public using said streets or ways. d. Trenches shall be neatly cut using a pavement saw or by other approved means. e. All excavations and obstructions shall be adequately barricaded and lighted at all times to protect the public from injury. All streets or ways, sidewalks, curbing, trees and berms, etc., shall be properly protected from damage by planking or other approved means. Any damage resulting from the contractors operation shall be repaired at said contractor's expense and in a timely manner. f. Service connections in public and private street rights of way shall not exceed fifty (50) feet in length, unless otherwise approved. g. All mains and service connections shall be laid in an envelope of washed, screened gravel or three-quarter-inch crushed stone with not less than six (6) inches of said material all around the barrel of said main or service connection unless otherwise regulated by state of [or] federal codes. h. Sewer connections made to any existing building plumbing system shall be upstream of any septic tank or cesspool servicing said building. Upon connection of the building to the city sewer system, the septic tank or cesspool shall be pumped dry and thereafter filled with suitable material, or removed. i. Manholes or other approved cleanout shall be installed in sewer and drain connections and mains at all angle points, grade changes, and in long connections and mains as deemed necessary. In no event, shall the interval between manholes exceed three hundred (300) feet. j. All sewer and drain manholes shall be constructed with a full depth brick invert. k. Catch basins shall be constructed so as to leave a minimum sump depth of forty-eight (48) inches. Outlets shall be fitted with an approved catch basin hood. l. All catch basins shall be connected directly to a drain manhole and shall not be constructed in series. m. Catch basins constructed along public and private street rights-of-way shall be fitted with a standard granite throatstone. n. All drain connections and mains shall be constructed using reinforced concrete pipe unless otherwise approved. Minimum diameter of said pipe shall be twelve (12) inches. a. No sewer, water, or drain connection shall be cut into any City utility without the prior permission of the Commissioner of the Department of Public Works and his/her agent. "Cut in" connections, when approved shall be made with water tight saddle type fittings unless otherwise approved. b. Sewer and drain connections and mains shall have a minimum of four (4) feet of cover material. Water services and mains shall be installed below the frost line and have a minimum of five (5) feet of cover material. c. Where existing sewer and water mains are excessively deep, service connections may be made via a chimney or line into a manhole via a drop inlet of approved design, and at a minimum depth of six (6) feet. d. All trenches and excavations shall be back-filled with controlled density fill. All backfill other than controlled density fill must have the permission of the Commissioner of the Department of Public Works or his/her authorized representative. Unsuitable material including, but not limited to, blacktop, concrete, roots, boulders and large stones, etc., shall be removed. Within the street right of way, if not using controlled density fill the top eighteen (18) inches shall be screened bank gravel or other suitable material as determined by the inspector. The back-filled material shall be compacted with mechanical compactors in twelve (12) inch lifts or by puddling with water jets when approved. Settled areas shall be filled with additional gravel borrow and be compacted as required. e. No connections to a water or sewer main shall be covered until the connection has been inspected by the Superintendent of Utilities or his designee. f. It shall be the responsibility of the permittee to obtain "Dig Safe" clearance. Failure to obtain such clearance may result in a fine from "Dig Safe". g. No service for water from the city water supply shall be turned on or disconnected by any person but the Superintendent of Utilities or his designee. Any person violating this requirement shall be subject to a fine in the amount of three hundred (300) dollars. Application to have water service turned on or disconnected shall be made in writing to the Department of Public Works Utilities Division. (12) Restoration of streets and sidewalks. When an opening is made under a permit granted pursuant to this article and not filled with CDF, a temporary bituminous concrete patch shall be place immediately after the back-filling and compaction has been completed. The patch shall be maintained by the contractor for a period of not less than three (3) months nor more than six (6) months, at which time the contractor shall replace said temporary patch with a permanent patch. The permanent patch shall be of the same material and at the same or greater depth as the existing road surface, or as otherwise directed by the inspector. A road surface that is five (5) years or less in age shall be permanently patched as set forth above using the infrared or similar method. a. In streets where long and/or numerous utility cuts for inspections, repairs, or new installations are anticipated, the contractor will be required to cold plane and/or overlay the existing paved roadway or some portion of said roadway. b. In sidewalks where long and/or numerous utility cuts for inspections, repairs, or new installations are anticipated, the contractor will be required to reconstruct the sidewalk or some portion of said sidewalk. c. The contractor shall be responsible for any failure in the permanent patch for a period of one (1) year from the date of installation of said patch. Any failure in the permanent patch shall be restored by the contractor within forty-eight (48) hours of notification of said failure. d. The contractor shall be responsible for all sewer, water, and drain connections and/or mains for a period of one (1) year from the date of the installation. Approval of said connections and mains by the commissioner of the department of public works or his agent shall not relieve the contractor from liability for his work during this period. (13) Inspections. a. Requests for inspections shall be made at the office of the appropriate department of public works division. Seventy-two (72) hours' advance notice is required before an inspection is performed. b. Inspections shall be made between the hours of 8:30 a.m. and 3:30 p.m. only. c. No inspections will be performed on weekends or holidays, except with the prior approval of the commissioner of the department of public works or his agent. When authorized, said inspections shall be at the expense of the contractor. (14) Return of deposit. When one (1) year has elapsed after installation of the permanent patch, the applicant may request return of his permit deposit. Said request shall be made in writing to the department of public works superintendent of operations, highway section. (15) Release of bond. A bond shall be released only upon final approval from the commissioner of the department of public works or his agent. (16) Penalties. Licenses and/or penalties shall be subject to revocation and/or future denial shall any of the regulations contained in this by-law be violated.
(Ord. No. G041, 8-27-07)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.