For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-78 — Industrial user pretreatment

Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-78

Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/2185f419-69af-4c91-b2e8-e43076a8f21c

Sec. 23-78. - Industrial user pretreatment.

Each industrial user shall provide necessary wastewater treatment as required to comply with this article, including the local discharge limitations set forth in schedule A hereto, and shall achieve compliance with all applicable national categorical pretreatment standards within the time limitations specified by said standards. Any facilities required to pretreat wastewater to a level which will achieve compliance with this article shall be provided, operated, and maintained at the industrial user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the commissioner for review, and shall be acceptable to the commissioner before construction of the facility. The review of such plans and operating procedures will in no way relieve the industrial user from the responsibility of modifying the facility as necessary to produce an effluent which complies with the provisions of this article. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be acceptable to the commissioner prior to the industrial user's initiation of the changes. All records relating to compliance with applicable pretreatment standards and requirements shall be made available to officials of the EPA or division upon request. In addition, pursuant to the public participation requirements of 40 C.F.R. part 25, the city shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdiction served by the POTW, a list of the industrial users, which, during the preceding twelve (12) months, were in significant noncompliance with applicable pretreatment standards or requirements. The term significant non-compliance shall be applicable to all significant industrial users (or any industrial user) that violates at any time during the preceding twelve (12) months or were in significant noncompliance with applicable pretreatment standards or requirements of one or more of the following criteria: (1) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of all measurements add "for each pollutant parameter, taken at each of the SIUs permitted monitoring points", taken during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement including instantaneous limits as defined by 40 CFR 403.3. (2) Technical review criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of all of the measurements for each pollutant parameter add "taken at each of the SIUs permitted monitoring points," taken during the six-month period equal or exceed the product of a numeric pretreatment standard or requirement including instantaneous limits as defined by 40 CFR 403.3 (TRC = 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH). (3) Any other violation of a pretreatment standard or requirement defined by 40 CFR 403.3 including, but not limited to, daily maximum, or longer term average, instantaneous limits or narrative standards that the commissioner determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of the POTW personnel or the general public); (4) Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the commissioner's exercise of its emergency authority to halt or prevent such discharge; (5) Failure to meet, within ninety (90) days after the schedule[d] date, a compliance milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide, within forty-five (45) days after the due date, required reports such as baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, on compliance schedules: (7) Failure to accurately report noncompliance; (8) Any other violation or group of violations, which may include a violation of best management practices, which the POTW determines will adversely affect the operation or implementation of the local pretreatment program.

(Ord. No. D395, 10-18-96; Ord. No. G046, §§ 1—6, 3-10-08; Ord. No. K35, 11-25-19)

Ask a question about Brockton law

Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.