§ 19.20 — PROJECT REVIEW SPECIAL PERMIT

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 19.20

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/2c9698a3-0bf8-466e-ba8f-6b015ae6e64c

19.20 - PROJECT REVIEW SPECIAL PERMIT

19.21 Purpose. It is the intent of this Section 19.20 to ensure that new construction or changes of use in existing buildings (1) are consistent with the urban design objectives of the City and (2) do not impose substantial adverse impacts on city traffic. A special permit process is established by which the Planning Board may make such findings. 19.21.1 Purpose of Traffic Impact Review. The Planning Board shall assess the impact of the vehicular service and passenger car traffic and pedestrian and bicycle circulation and expected to be generated by a proposed development project. The procedures and requirements of this Section 19.20 are intended to encourage applicants to adopt a development program that reduces the number of single occupancy vehicles coming to the site. Such a program would encourage pedestrian and bicycle access to the site and throughout the neighboring district and reduce potential negative impacts on abutting properties of the vehicles coming to the site. While the review will focus especially on the impacts affecting abutting properties and the immediate environment, the impacts on streets and locations more distant from the site and on transit and bus facilities serving the site will also be assessed. 19.21.21 Purpose of Urban Design Review. The Board shall review the specific design details of buildings and their site layout to ensure that the design of the building and its location on the lot minimize any potential negative impact on abutting properties and on the environment along public streets and sidewalks. Particular attention will be paid to the design of the ground floor; the layout of service facilities including driveways, and parking and loading facilities; the location and screening of mechanical service equipment and waste disposal facilities; landscape amenities; and similar building and site layout details. 19.22 Applicable Zoning Districts. The Project Review Special Permit shall apply to construction and changes of use located in the following zoning districts. (1) All Office, Business, and Industrial Districts, any PUD district, and NP districts, and any Special District for which an office, business or industrial district serves as the underlying base regulation (SD-1, SD-3, SD-5, SD-7, SD-8 and SD-11), but excluding the MXD district. (2) Residence C-1, C-1A, C-2, C-2A, C-2B, C-3, C-3A, and C-3B districts, and any Special District for which any one of these residence districts serves as the underlying base regulation (SD-2, SD-6, SD-12 and SD-13) and SD-14. A Project Review Special Permit in these districts shall be required only where the construction or portion of the construction is located within one hundred (100) feet of a public way unless the uses proposed in the building are subject to the thresholds established in Table 1. 19.23 Special Permit Threshold. In all applicable zoning districts, a Project Review Special Permit shall be required for new building construction or change of use (pursuant to Subsection 19.23.1 below) where a Table I threshold has been met, on a lot or combination of contiguous lots held in common ownership at any time after September 15, 2000. In a Business A, Business A-1, or Business A-2 district, or a Cambridge Street District (CAM-6, CAM-10, or CAM-12), or a Massachusetts Avenue District (MAS-6, MAS-12, MAS-12A, or MAS-18), a Project Review Special Permit shall also be required for new building construction of 20,000 square feet or more of non-residential Gross Floor Area (GFA), though a Traffic Study shall not be required if a Table I threshold is not met. Where a mix of uses is proposed the threshold shall be determined by the application of the Mixed Use Formula set forth in Table 1. Notwithstanding the provisions of this Section 19.23 set forth above, the Project Review Special Permit requirement shall not apply to existing gross floor area on a lot built and occupied prior to the effective date of this Article 19.000 that is demolished and subsequently rebuilt as part of a building project, provided (1) there is no change of use, (2) the reconstruction commences within two years of the start of demolition of the building, and (3) the standards of Section 19.50 are met. Where a threshold is set forth below in square feet ("sf") it shall refer to the total GFA calculated pursuant to Section 5.25 but shall exclude GFA in parking facilities, except as otherwise noted. Where reference is made in this Section 19.23 to Gross Floor Area thresholds as set forth in Table 1, the term shall also encompass any other measure of quantity enumerated in the Table (e.g. dwelling units, beds, acres, parking spaces). Table 1 Thresholds for Required Traffic Study by Land Use Type Land Use Category | Threshold Standard Threshold: All Land Uses Set forth in Tables 4.30 and 4.56 except as enumerated below. | 50,000 sf Residences: All uses in Section 4.31, a—j | 75,000 sf Transportation Communication & Utility Uses: Section 4.32 a. Bus or railroad passenger station | Required b. Automobile parking lot or parking garage for private passenger cars | 150 parking spaces c. Railroad freight terminal, railroad yards and shops | 50 acres d. Truck or bus terminal, yard or building for storage or servicing of trucks, trailers, or buses; parking lot for trucks | Required Institutional Uses: Section 4.56 (See also Section 4.33) a. Religious purposes 1. Social or recreation center | 40,000 sf 2. Other use with religious purpose | 40,000 sf b. Educational purposes 1. Preschool, day care center, kindergarten | 25,000 sf 2. Primary school | 40,000 sf 3. Secondary school | 40,000 sf 4. College or university athletic facility, auditorium, theatre, library, museum or similar facility, any of which is customarily accessible to the general public on a paid admission fee or other basis | Creation of 150 new parking spaces or the relocation of 250 existing parking spaces or any combination thereof. 1,2 5. College or university laboratory or research facility customarily involving radioactive materials and other controlled substances, high intensity electromagnetic radiation or chemical or biological processes which could entail a high level of danger to the public health 6. Other college or university facility Dining halls, canteens and similar eating areas Administrative faculty and staff offices, teaching facilities, service facilities, and facilities not specified above 1. The addition to or relocation of parking spaces in the inventory of institutional parking in existence as of September 15, 2000 (see Section 6.32.2) in association with the construction of a new building. 2. Relocation shall mean the construction of parking spaces at a new location, where the distance between that entrance at the new location most proximate to the closest entrance at the old location is 1,000 feet or more. 7. Vocational or other schools | 40,000 sf e. Health Care Facilities 1. Hospital | 35,000 sf 2. Infirmary | 25,000 sf 3. Nursing home, convalescent home | 250 beds 4. Clinic not affiliated with any other institution | 25,000 sf 5. Clinic affiliated with a hospital or accredited university medical school | 25,000 sf 6. Clinic connected to a community center | 25,000 sf 7. Other health care facilities | 25,000 sf f. Social Service Facilities 1. Social service center | 40,000 sf 2. Community Center | 40,000 sf g. Local Government 1. Fire or police station | Not Required 2. Public parks, playgrounds or public recreation buildings | 400 acres i. Other Institutional Uses 1. Cemetery | 100 acres 2. Other institutional use | 40,000 sf Office and Laboratory Uses: Section 4.34 a. Office of a physician, dentist or other medical practitioner not located in a clinic listed under Subsection 4.33(d) | 25,000 sf b. Bank, trust company or similar financial institution | 25,000 sf Retail or Consumer Service Establishments: Section 4.35 | 25,000 sf Outdoor Retail or Consumer Service Establishments: Section 4.36 a. Open-Lot Retail Sales Establishment | 25,000 sf b. Drive-In Food Service Establishments | Required c. Drive-In Consumer Service Establishments | Required d. Outdoor Entertainment and Recreation Facility | 300 seats e. Drive-In Theater | 300 seats f. Outdoor Auto Sales Facility | 25,000 sf g. Auto Service Station | 5 fueling positions h. Auto Wash | Required Light Industry, Wholesale Business and Storage: Section 4.37 a. Auto body or paint shop | 25,000 sf b. Automotive repair garage not including [1.] above | 25,000 sf Mixed Use Formula Where it is proposed to include a mix of uses in a new development, or substitute a mix of uses for an existing use in an existing building, a special permit shall not be required under the provisions of Section 19.20 if: (GFA ÷ Threshold a ) + (GFA ÷ Threshold b ) + (GFA ÷ Threshold c ) ≤ 1 Where "GFA" is the proposed Gross Floor Area (or other indicated quantity measure) for a use denoted by a subscript and where "Threshold" is the Threshold for that use in Table 1. 19.23.1 Change of Use in an Existing Building Threshold. 19.23.11 In an existing building, the Project Review Special Permit shall be required where the total Gross Floor Area of a new use or uses on a lot exceeds the Gross Floor Area threshold limits set forth in Table 1 for that new use. Where the change is to a mix of uses the threshold shall be determined by the application of the Mixed Use Formula set forth in Table 1. 19.23.2 Incremental Changes on a Lot. Any amount of Gross Floor Area on a lot, subject to this Article 19.000, that is less than those threshold amounts set forth in Table 1 shall be subject to this Section 19.20 only when the sum of the following equals or exceeds the Gross Floor Area thresholds set forth in Sections 19.23 and 19.23.1 above: (1) The current proposal for new Gross Floor Area on the lot, plus (2) The Gross Floor Area on the lot developed or changed in use within the preceding five years so as to be subject to this Section 19.20 but for which a Special Permit under this Section 19.20 was not required, plus (3) Any Gross Floor Area on the lot for which a building permit has been issued but which has yet to be built and occupied and for which a Special Permit authorized by this Section 19.20 has not been issued within the preceding five years. After the granting of the first special permit under this Section 19.20, a subsequent special permit shall only be required when the total of additional Gross Floor Area or new uses exceeds the Gross Floor Area thresholds set forth in Sections 19.23 and 19.23.1 above. 19.23.3 Phased Project. Nothing in this Section 19.20 shall prohibit the Planning Board from granting a special permit for a phased project to be built over an extended period of time, which period shall be defined in the permit, provided sufficient information is available in the application to permit the Board to make the findings required. 19.23.4 Special Permit Thresholds Exemptions. Construction of a new building or a change of use that has been granted a Planning Overlay Special Permit (IPOP), under the provisions of Section 11.500 of this Ordinance in effect from July 1, 1998 through October 2, 2000 (Ordinance # 1209 and subsequent amendments), shall not be subject to this Section 19.20. However, any change of use in the authorized building subsequent to occupancy as authorized under the provisions of a Section 11.500 special permit, shall require the issuance of a Project Review Special Permit under this Section 19.20 where the proposed new use exceeds the relevant threshold established in Table 1. 19.24 Application Procedures. An application for the Project Review Special Permit shall be made to the Planning Board. The Application shall consist of the following materials: (1) Planning Board Special Permit Application Form. The application shall include all required plans and narrative statements. The site plan and other plans, elevations and drawings shall clearly show: (1) the access and egress points for all forms of travel to the site, (2) the location of adjacent bus and transit stops, (3) the schematic design of proposed mechanical equipment, and (4) the architectural screening treatment proposed for that mechanical equipment. The proponent shall provide perspectives of the proposed development, including mechanical equipment, from all critical viewpoints. (2) Traffic Study. Where the use thresholds established in Table 1 are met or exceeded, the application shall include a traffic study with a geographic and functional scope determined by the Traffic, Parking, and Transportation Department (TPTD) to be appropriate to the location of the project. In general, the study shall review intersections where the project will have significant and measurable impact. The TPTD shall issue a certification to the applicant within twenty-one (21) days of its submission that the traffic study has been done in a complete and reliable manner. Where that certification is denied, the applicant may revise the information in the traffic study and resubmit it; a certification of the revised study shall be issued or denied by the TPTD within fourteen (14) days of the resubmission of material. Based on guidelines established by TPTD, the traffic study shall include a narrative discussion of (a) the nature and quantity of vehicles traveling to the site including, in addition to passenger cars, service, delivery and other commercial vehicles, (b) the likely impact of such vehicular traffic on abutters, abutting streets and nearby residential streets, including on-street parking behavior, (c) the physical nature of pedestrian and bicycle access to the site and the quantity of movements anticipated for each, and (d) an analysis of the crash history at intersections within the study area. The study shall identify parking and transportation demand management measures and other mitigation measures proposed to ameliorate any adverse traffic impacts identified in the study. (3) Tree Study. A Tree Study, certified complete by the City Arborist, as required by the Tree Protection Ordinance of the City of Cambridge, Chapter 8.66. (4) Urban Design Objectives Narrative. The application shall include a narrative description of how the proposal addresses each of the seven Urban Design Objectives set forth in Section 19.30. In addition the applicant shall comment specifically on the following: (a) the design and location of proposed mechanical equipment, including HVAC equipment, as well as a strategy for possible future expansion, if relevant, (b) location and operation of trash storage and removal systems, (c) location and operation of loading facilities, (d) measures taken to minimize the negative visual and noise impacts of such facilities on abutters, and (e) the provision in the building and site design to accommodate pedestrian, bicycle and transit access. (5) Sewer Service Infrastructure Narrative. The application shall include a report by the applicant detailing the anticipated impact of the project on the city's sanitary, stormwater, and combined sewer infrastructure. It shall indicate the adequacy of the preliminary site plan in meeting city, state, and federal requirements or established standards for implementation of best management practices for stormwater management and the likely improvements to infrastructure necessary to accommodate the impacts of the proposed project. Where such determinations cannot be made at the time of application, the report shall indicate what investigations must be undertaken by the applicant to make such determination, their anticipated costs, and the schedule for their completion. The applicant shall provide certification that this report has been submitted to the Department of Public Works. (6) Water Service Infrastructure Narrative. The application shall include a report by the applicant detailing the anticipated impact of the project on the city's water delivery infrastructure and supply. It shall indicate the likely improvements to infrastructure necessary to accommodate the identified impacts. Where such determinations cannot be made at the time of application, the report shall indicate what investigations must be undertaken by the applicant to make such determination, their anticipated costs, and the schedule for their completion. The applicant shall provide certification that this report has been submitted to the Water Department. (7) Noise Mitigation Narrative. The application shall include a report detailing how the project shall conform to the requirements of the Cambridge Noise Ordinance. The report shall indicate the approaches to be adopted by the applicant in minimizing the impact of noise from the project on neighbors. When a project consists entirely or in part of residential uses located in a mixed-use or commercial or industrial area, the narrative shall describe how building materials, building design, building orientation, and site layout are being used to reduce the transmission of noise to the residences from the surrounding environment. (8) Resilience Narrative. The application shall include a report by the applicant describing how the project will mitigate and adapt to anticipated climate change impacts over the lifetime of the building, to include the following information at a minimum: (i) The Flood Resilience Standards documentation required in Section 22.80 of this Zoning Ordinance, and a description of specific design approaches used to respond to anticipated flood impacts, referencing plans, elevations, and other submitted drawings. Examples may include but are not limited to the following: • raising of the finished floors of occupied spaces; • use of fixed or movable flood barriers at exterior access/egress points; • raising and/or protection of critical building equipment that is vulnerable to flooding; • use of flood-resistant building materials in areas of the building that are at risk of flooding, or materials that are readily replaceable if damaged by floodwater; • passive design approaches that maintain interior comfort in the event of a power outage or other extreme event; • and/or other design strategies. (ii) The Green Factor documentation required in Section 22.90 of this Zoning Ordinance and a description of specific design approaches used to mitigate the anticipated impacts of heat on the building and site, referencing plans, elevations, and other submitted drawings. Examples may include but are not limited to the following: • site landscaping and building design features that provide direct cooling to occupants of the site and any abutting public streets, reduce heat gain on the building, and mitigate urban heat island effect; • passive design approaches that increase a building's ability to withstand heat gain and maintain interior comfort in the event of a power outage or other extreme event; • interior cooling centers where occupants and/or other community members can seek shelter during extreme heat events; • and/or other design strategies. (iii) A description of any mitigation strategies that the owner will agree to implement for operational preparedness that will supplement design-based resilience strategies. Examples may include but are not limited to the following: • information provided to building occupants about flood risk at initial occupancy; • protocols for alerting occupants when an extreme flood or heat event is likely; • response plans for maintaining occupant safety if occupants need to shelter in place temporarily, which may include measures to maintain emergency access/egress and to help occupants maintain access to water, food, medications, and means of communication; • recovery plans for restoring habitability of spaces that may be damaged during an extreme weather event; • participation in coordinated areawide programs and resources to promote social resilience; • and/or other strategies. (iv) Other strategies that the owner proposes to implement in order to promote climate change resilience not described above. 19.25 Review Criteria. In granting a special permit under this Section 19.20 the Planning Board shall make the following findings. 19.25.1 Traffic Impact Findings. Where a Traffic Study is required as set forth in Section 19.24 (3) above the Planning Board shall grant the special permit only if it finds that the project will have no substantial adverse impact on city traffic within the study area as analyzed in the Traffic Study. Substantial adverse impact on city traffic shall be measured by reference to the traffic impact indicators set forth in Section 19.25.11 below. In areas where the Planning Board determines that area-specific traffic guidelines have been established in the Ordinance, the Board recognizes written agreements between project proponents and the City dealing with transportation mitigation strategies. 19.25.11 Traffic Impact Indicators. In determining whether a proposal has substantial adverse impacts on city traffic the Planning Board shall apply the following indicators. When one or more of the indicators is exceeded, it will be indicative of potentially substantial adverse impact on city traffic. In making its findings, however, the Planning Board shall consider the mitigation efforts proposed, their anticipated effectiveness, and other supplemental information that identifies circumstances or actions that will result in a reduction in adverse traffic impacts. Such efforts and actions may include, but are not limited to, transportation demand management plans; roadway, bicycle and pedestrian facilities improvements; measures to reduce traffic on residential streets; and measures undertaken to improve safety for pedestrians and vehicles, particularly at intersections identified in the Traffic Study as having a history of high crash rates. The indicators are: (1) Project vehicle trip generation weekdays and weekends for a twenty-four hour period and A. M. and P.M. peak vehicle trips generated; (2) Change in level of service at identified signalized intersections; (3) Increased volume of trips on residential streets; (4) Increase of length of vehicle queues at identified signalized intersections; and (5) Lack of sufficient pedestrian and bicycle facilities. The precise numerical values that will be deemed to indicate potentially substantial adverse impact for each of these indicators shall be adopted from time to time by the Planning Board in consultation with the TPTD, published and made available to all applicants. 19.25.2 Urban Design Findings. The Planning Board shall grant the special permit only if it finds that the project is consistent with the urban design objectives of the city as set forth in Section 19.30. In making that determination the Board may be guided by or make reference to urban design guidelines or planning reports that may have been developed for specific areas of the city and shall apply the standards herein contained in a reasonable manner to nonprofit religious and educational organizations in light of the special circumstances applicable to nonprofit religious and educational activities.

(Ord. No. 2021-3, § xxiv, 6-7-2021; Ord. No. 2022-9, 2-27-2023; Ord. No. 2025-2, 2-10-2025; Ord. No. 2025-16, 12-22-2025; Ord. No. 2025-17, 1-26-2026)